The DVLR Mark 2
-
Mrs F Controller
Just been going through the last few pages and read about the pond! Well, done hope it's starting to look good now. Must admit I agree with you that although they make a lovely feature they can be a pain the b**t! The thing to watch is the edges as it works just like in real life the soil gets soggy and starts to slump great geography lesson! Did I also recognise gravel boards that the track is laid on?? It's all starting to come together isn't it! GReat stuff!
- Dr. Bond of the DVLR
- Retired Director

- Posts: 4533
- Joined: Tue Jun 09, 2009 9:43 pm
- Location: Suffolk
- Contact:
- Dr. Bond of the DVLR
- Retired Director

- Posts: 4533
- Joined: Tue Jun 09, 2009 9:43 pm
- Location: Suffolk
- Contact:
Again, had the worst steam up ever today. Tender of River Alde derailed on Haddon Bridge, I was filming from the tender at the time. Plop... Camera is dead. Hoping that it may come back to life after drying...
After this the train got stuck in that cutting at the back and in stepping over to get to it I damaged the pond edging. In getting back down from the flowerbed I garrotted myself on the washing line.
I did manage to get two runs in without derailments...
After this the train got stuck in that cutting at the back and in stepping over to get to it I damaged the pond edging. In getting back down from the flowerbed I garrotted myself on the washing line.
I did manage to get two runs in without derailments...

The railway which people forgot
(to build)
-
Pendo Pilot
- Dr. Bond of the DVLR
- Retired Director

- Posts: 4533
- Joined: Tue Jun 09, 2009 9:43 pm
- Location: Suffolk
- Contact:
Well, on Sunday I nearly sorted out a new station for Aldeburgh. A friend who lives round the corner bought an attractive station from a show which I sort of had my eye on. Anyway, he brought it round. I had forgotten how large it was!!




So that was a no, as it takes up about a 10th of my entire railway space!!
Apart from that I built a retaining wall

and re altered the track layout at Aldeburgh. I had wanted a passing loop here but there just isn't the space so a long siding and some chain shunting instead methinks! I'd like a corris ish station here with an over roof.

After that I just took some artsey fartsey pictures of the railway and planted a few crocus bulbs.








The pipe will be a windmill...







I am really pleased with how this railway is turning out.
Oh, and the camera has come back to life




So that was a no, as it takes up about a 10th of my entire railway space!!
Apart from that I built a retaining wall

and re altered the track layout at Aldeburgh. I had wanted a passing loop here but there just isn't the space so a long siding and some chain shunting instead methinks! I'd like a corris ish station here with an over roof.

After that I just took some artsey fartsey pictures of the railway and planted a few crocus bulbs.








The pipe will be a windmill...







I am really pleased with how this railway is turning out.
Oh, and the camera has come back to life

The railway which people forgot
(to build)
-
taliesin001
- Dr. Bond of the DVLR
- Retired Director

- Posts: 4533
- Joined: Tue Jun 09, 2009 9:43 pm
- Location: Suffolk
- Contact:
-
Narrow Minded
- Dr. Bond of the DVLR
- Retired Director

- Posts: 4533
- Joined: Tue Jun 09, 2009 9:43 pm
- Location: Suffolk
- Contact:
Well I had a much better steam up today. Getting used to RC control, still not quite got it yet - lots of stopping and starting but oh well. Here we see the good people from the Deben Valley going to watch the Aldeburgh Firework display - with real miniature fireworks!
http://www.youtube.com/watch?v=rBPHn-W3BOA
<object width="420" height="315"><param name="movie" value="http://www.youtube.com/v/rBPHn-W3BOA?ve ... ram><param name="allowFullScreen" value="true"></param><param name="allowscriptaccess" value="always"></param><embed src="http://www.youtube.com/v/rBPHn-W3BOA?version=3&hl=en_GB" type="application/x-shockwave-flash" width="420" height="315" allowscriptaccess="always" allowfullscreen="true"></embed></object>
http://www.youtube.com/watch?v=rBPHn-W3BOA
<object width="420" height="315"><param name="movie" value="http://www.youtube.com/v/rBPHn-W3BOA?ve ... ram><param name="allowFullScreen" value="true"></param><param name="allowscriptaccess" value="always"></param><embed src="http://www.youtube.com/v/rBPHn-W3BOA?version=3&hl=en_GB" type="application/x-shockwave-flash" width="420" height="315" allowscriptaccess="always" allowfullscreen="true"></embed></object>

The railway which people forgot
(to build)
-
Narrow Minded
- Dr. Bond of the DVLR
- Retired Director

- Posts: 4533
- Joined: Tue Jun 09, 2009 9:43 pm
- Location: Suffolk
- Contact:
- hussra
- Trainee Driver

- Posts: 872
- Joined: Tue Jul 28, 2009 2:06 pm
Looks and sounds entertaining. I guess it's just a case of waiting to see if the neighbours come round asking awkward questions...
Glad to see River Deben running more happily on the Mk. 2 DVLR. I can see the big box under the RH side of the cab, but where did the rest of the bits go - do you have any photos of how the RC was squeezed in?
Glad to see River Deben running more happily on the Mk. 2 DVLR. I can see the big box under the RH side of the cab, but where did the rest of the bits go - do you have any photos of how the RC was squeezed in?
Richard Huss
in sunny Solihull
in sunny Solihull
-
Narrow Minded
- Dr. Bond of the DVLR
- Retired Director

- Posts: 4533
- Joined: Tue Jun 09, 2009 9:43 pm
- Location: Suffolk
- Contact:
very simple. Grab two matches and a strip of tin foil. Place the two matches head to heads in the middle of the foil at one edge. Wrap the matches very tightly in the foil. You have to have enough foil so that the explosion can't blow through it. Push one of the matches part way into the ground, pointing away from people or flammable things. Then put a heat source near the middle of the firework where the match heads are (wrapped in the foil) and brace yourself! The match heads quickly combust producing a lot of heat and gas which because it can't escape push the top match out of the foil with alot of force. Simple, cheap and effective.
I really should get a job on bluepeter...
RE the R/C on RD...
The receiver and batteries are hidden in the box beneath the footplate and the servos is inside on of the tanks. The areal is one of the tank fillers. An ingenious and cunning solution by DLRDan. I hate the look of radio control but desperately needed it for my line so Dan fitted it with R/C very discretely indeed! The bunker has also been pushed back to give a little more of a realistic cab space.
I really should get a job on bluepeter...
RE the R/C on RD...
The receiver and batteries are hidden in the box beneath the footplate and the servos is inside on of the tanks. The areal is one of the tank fillers. An ingenious and cunning solution by DLRDan. I hate the look of radio control but desperately needed it for my line so Dan fitted it with R/C very discretely indeed! The bunker has also been pushed back to give a little more of a realistic cab space.

The railway which people forgot
(to build)
-
pauly
- Driver

- Posts: 1989
- Joined: Tue Aug 12, 2008 9:18 pm
- Dr. Bond of the DVLR
- Retired Director

- Posts: 4533
- Joined: Tue Jun 09, 2009 9:43 pm
- Location: Suffolk
- Contact:
Its only RC on the regulator. Its worth it on my line though. Really tight corners and millies with large wheel bases just dont work. It had a habit of stalling, building up a huge head of steam then exploding out of the curve and ending up in the turntable well...

The railway which people forgot
(to build)
-
Narrow Minded
As was my Bertie when I bought it - I did a "deal" and the previous owner kept the Roundhouse fittingspauly:60817 wrote:Yeah just like any loco, you just cant RC the direction control.dougrail:60816 wrote:I was under the impression that the slip-eccen Millie and Bertie couldn't be RC fitted? :shock:
My Millie was RC for a short period.
- hussra
- Trainee Driver

- Posts: 872
- Joined: Tue Jul 28, 2009 2:06 pm
Thanks! Inside one of the tanks... ah, I think I can just see the servo at 1:02 and 3:15, by the right hand side of the boiler. Hmmm, that's where my driver lives.Mr. Bond of the DVLR:60814 wrote:RE the R/C on RD...
The receiver and batteries are hidden in the box beneath the footplate and the servos is inside on of the tanks. The areal is one of the tank fillers. An ingenious and cunning solution by DLRDan. I hate the look of radio control but desperately needed it for my line so Dan fitted it with R/C very discretely indeed! The bunker has also been pushed back to give a little more of a realistic cab space.
Richard Huss
in sunny Solihull
in sunny Solihull
Who is online
Users browsing this forum: No registered users and 54 guests