New Beginning for 2022
Posted: Sun Feb 13, 2022 2:06 pm
by stevenfitch
The previous railway as discussed here
https://gardenrails.org/forum/viewtopic.php?p=163568 suffered some storm damage a shown here
https://www.youtube.com/watch?v=hBdGKgjlpwk.
The damage was caused by various neighboring sheds, greenhouses, fences etc being blown into and around the garden ripping up track work and cables as they went, although probably salvageable and repairable i have decided that this is the excuse to design and construct a whole new new railway which then deserves its own new forum thread and this is that thread.
This railway will learn from the previous construction and operating methods and take into account some more research done since the original design back in 2015.
The previous track plan:
- Garden 2015 (alt no raised bed).jpg (92.58 KiB) Viewed 6975 times
The new track plan:
(everything to the right of the red line pretty much survived the strom damage so is being kept as is)
- Garden 2022.jpg (78.21 KiB) Viewed 6975 times
Re: New Beginning for 2022
Posted: Sun Feb 13, 2022 3:28 pm
by Andrew
That's a very impressive design, and a lot of track! How many trains will you be able to have operating at once?
I'm looking forward to further progress reports!
All the best,
Andrew.
Re: New Beginning for 2022
Posted: Sun Feb 13, 2022 4:20 pm
by stevenfitch
Andrew wrote: ↑Sun Feb 13, 2022 3:28 pm
How many trains will you be able to have operating at once?
(Under computer control)
Normally 4 as I'm planning on using the main loops (newest part) for most of the running but up to 6 if using the loop through the garage and various sets running too and from the storage in the garage.
Re: New Beginning for 2022
Posted: Mon Feb 14, 2022 6:31 am
by ge_rik
Good idea to include a continuous loop, to my mind. Opens up quite a few more possibilities.
Rik
Re: New Beginning for 2022
Posted: Mon Feb 14, 2022 9:22 am
by stevenfitch
ge_rik wrote: ↑Mon Feb 14, 2022 6:31 am
Good idea to include a continuous loop, to my mind. Opens up quite a few more possibilities.
Rik
Hi Rik
Yes that was one of the main points, it was a pain running through the storage all of the time for every loop on the old one, at least now they can just run around the loops with a lot less chance of issues going through the garage
Re: New Beginning for 2022
Posted: Fri Jul 22, 2022 2:01 pm
by stevenfitch
After much planning and deciding, work is now underway.
Decided in the end to just rip up the whole garden and start again from a level base.
- IMG_20220720_1138372.jpg (230.95 KiB) Viewed 6081 times
- IMG_20220722_1359079.jpg (214.49 KiB) Viewed 6081 times
Re: New Beginning for 2022
Posted: Fri Jul 22, 2022 2:23 pm
by Peter Butler
Serious stuff that, and still some garden left over for the extension!
Re: New Beginning for 2022
Posted: Sat Jul 23, 2022 8:29 am
by BWLR
Heavy duty civil engineering going on there!
Re: New Beginning for 2022
Posted: Sat Jul 23, 2022 12:54 pm
by ge_rik
Any excuse to hire a digger .......
Rik
Re: New Beginning for 2022
Posted: Tue Jul 26, 2022 10:25 am
by markoteal
Wow - puts my efforts into perspective!
Re: New Beginning for 2022
Posted: Sat Jul 30, 2022 11:30 am
by Soar Valley Light
I thought I'd carried out some major terraforming but I can't compete with that!
SVLR Andrew
Re: New Beginning for 2022
Posted: Sun Aug 21, 2022 9:15 pm
by stevenfitch
At some point a railway will make an appearance but for now the control box has been re-built
- IMG_20220820_141855_731.jpg (4.55 MiB) Viewed 5534 times
- IMG_20220821_135505_920.jpg (4.47 MiB) Viewed 5534 times
Re: New Beginning for 2022
Posted: Mon Aug 22, 2022 3:03 pm
by stevenfitch
Re: New Beginning for 2022
Posted: Mon Aug 22, 2022 3:58 pm
by Peter Butler
Wow, that's quite some progress since the end of July, well done!
Re: New Beginning for 2022
Posted: Tue Aug 23, 2022 10:51 am
by Old Man Aaron
Great work, especially in the heat in your part of the world. Not long before the real fun begins!
Re: New Beginning for 2022
Posted: Tue Aug 23, 2022 5:14 pm
by ge_rik
Air operated pointwork?
Rik
Re: New Beginning for 2022
Posted: Sun Sep 04, 2022 9:18 pm
by stevenfitch
- IMG_20220904_163602_253.jpg (5.78 MiB) Viewed 5593 times
- IMG_20220904_195017_909.jpg (4.52 MiB) Viewed 5593 times
First parts of track bed are going in
Re: New Beginning for 2022
Posted: Wed Sep 07, 2022 8:14 pm
by stevenfitch
ge_rik wrote: ↑Tue Aug 23, 2022 5:14 pm
Air operated pointwork?
Rik
Yes, using the Sunset Valley Railroad equipment and a small air brush compressor
Re: New Beginning for 2022
Posted: Sat Sep 10, 2022 5:55 pm
by Keith S
What is the advantage to air-operated pointwork? I have heard of it before, but have always thought it sounded a bit "Rube Goldberg" if you don't mind me saying so. Although I must admit I can see it being more weather-resistant than electrics would be.
Re: New Beginning for 2022
Posted: Sun Sep 11, 2022 1:32 am
by GTB
Keith S wrote: ↑Sat Sep 10, 2022 5:55 pm
What is the advantage to air-operated pointwork? I have heard of it before, but have always thought it sounded a bit "Rube Goldberg" if you don't mind me saying so. Although I must admit I can see it being more weather-resistant than electrics would be.
No electricity involved and the parts are standard industrial items, so it's robust, reliable, easy to install and suitable for remote operation over long distances.
Assuming no leaks, it only uses air when a turnout is changed, so it doesn't really need a compressor. I know someone who powers his with a garden sprayer.
It's getting harder for me to access some of the manual turnouts on my track and I'm considering installing remote control on the more remote turnouts on my track. Given the climate and wildlife around here, I wouldn't use electrics out in the garden on a bet. This years capital expenditure program may be a pneumatic turnout control system, instead of yet another loco chassis kit.......
Regards,
Graeme