Soar Valley Light:118954 wrote:That's fascinating Dwayne. The rail weight on the table is much less than that running up to it. I'm guessing that is because the table is older than its surroundings. I'd say the rail is 20 or 25lb on the table and 35lb in the plain line. Any idea where it is?
Andrew
Andrew, I did notice the different rail weights as well. An interesting feature although not one I'm replicating. As for the location of this little turntable that I don't know. I just happened to have the photo in my collection from years ago and that information wasn't something I noted.
The past few evenings I've been working a bit on the layout. Decided to tackle the most complicated track feature first which are the two switches. The curved switch will have 'fixed points' (the closure rails and frog guard rails are one) and the shorter straight switch will use 'hinged points' (closure rails are hinged at the frog). I considered making the two separate but decided to built as one unit more or less.
Adding to the complexity of the switches is the close proximity of the diamond crossing (level junction). Having never built one of these before I spent a few hours looking online for some decent photos that show how they are fabricated, held together and the placement of the ties beneath. I realized quickly that I'll have to use rail plates/brackets along with brass nuts & bolts to keep these things together.
I'm thinking I should have the two switches and the first crossing completed by this weekend. Afterwards the remainder should be much easier and more quickly installed. The rail that is outside of the buildings will be spiked down with 3/8" Micro Engineering spikes for appearance that I had on hand. The rail that will be inside the buildings will be spiked using the 5/8" x 19 nails I also use on my outdoor layout since the 1/4" thick building base is far to dense to push the ME spikes into without them bending since the rail is being attached directly to the building bases. I'm thinking that David plans to add either wood flooring or faux concrete around the interior rails giving them a flush, recessed appearance level with the floor itself so the oversized outdoor nails won't be seen.
BTW, the ties we're using came from David's old yard fence that had seen years of natural aging. He cut each tie to 4.25 - 4.50 inches long and 1/4" thick. I'm attaching these to the layout board using Gorilla PVA wood glue. Because the module replicates a flat industrial setting we felt that there wasn't really a need for the typical raised roadbed profile.
All in all this is turning out to be a track laying challenge but I'm having fun with it nonetheless. Truly a collaborative effort for the three of us.
