How many
-
MDLR
Oh, Lordy!
Budup wagon to finish and paint................
EeZee coach to finish...............................
(those two on the bench, started)
Baldrig XT body kit to build........................
3 4-wheel coaches to build..........................
Another EeZee coach to build.......................
EeZee passenger brake van / Budup van to build.............
Lollypop Railcar to build (bought as a partly-built kit)
Fit working headlights to Darj - bought the bits today..............
Baseboard / box/ legs for Flagg Fluorspar to build (started - was waiting for BBQ to get moved out of the garage to give me room to work when it's raining)
Track for above to lay, plus lighting (general and in buildings) buildings, ballast / scenics....................
Budup wagon to finish and paint................
EeZee coach to finish...............................
(those two on the bench, started)
Baldrig XT body kit to build........................
3 4-wheel coaches to build..........................
Another EeZee coach to build.......................
EeZee passenger brake van / Budup van to build.............
Lollypop Railcar to build (bought as a partly-built kit)
Fit working headlights to Darj - bought the bits today..............
Baseboard / box/ legs for Flagg Fluorspar to build (started - was waiting for BBQ to get moved out of the garage to give me room to work when it's raining)
Track for above to lay, plus lighting (general and in buildings) buildings, ballast / scenics....................
Last edited by MDLR on Thu May 24, 2012 5:26 pm, edited 1 time in total.
- williamfj
- Trainee Driver

- Posts: 605
- Joined: Sat Nov 20, 2010 9:20 pm
- Location: York
- Keith S
- Driver

- Posts: 1668
- Joined: Thu Feb 24, 2011 11:44 pm
- Location: Canada
In no particular order, I need to
1) Move South
2) Buy property
3) Move onto said property
4) Convince wife to give up back garden
5) Build (electric and/or razor-wire) fence to keep out urchins and ne'er-do-wells
6) Purchase rails
7) Build railway
8 ) Finish making little brake shoes for model brake van
I'm currently most active on project #8.
1) Move South
2) Buy property
3) Move onto said property
4) Convince wife to give up back garden
5) Build (electric and/or razor-wire) fence to keep out urchins and ne'er-do-wells
6) Purchase rails
7) Build railway
8 ) Finish making little brake shoes for model brake van
I'm currently most active on project #8.
-
benchmark
-Second phase of track laying on the Bumpington railway
-10-15 stationary steam engines needing restoration.
- 2 live steam boats needing completion and trials
- find a permanent site and assemble my live steam OO gauge layout.
- 3 live steam engine kits needing assembling
- cleaning out my shed for the summer.
- lots of garden work.
list is endless
-10-15 stationary steam engines needing restoration.
- 2 live steam boats needing completion and trials
- find a permanent site and assemble my live steam OO gauge layout.
- 3 live steam engine kits needing assembling
- cleaning out my shed for the summer.
- lots of garden work.
list is endless
-
Cann
other than finish the trackbed with wooden tressel viaduct, swing girder bridge lift out bridge. lay track, ballast and build all buildings and fences gates etc.
On the bench is:-
a part built quarry hunslet.
Plans for a freelance steamtram,
frames for a little peckett,
three i.c.'s two need making one one rebuilding,
two unbuilt wagon kits
two unbuilt coach kits
five scratch built wagons and brake van unfinished
And the stuff turning over in my head is wont fit!!!
Rich
On the bench is:-
a part built quarry hunslet.
Plans for a freelance steamtram,
frames for a little peckett,
three i.c.'s two need making one one rebuilding,
two unbuilt wagon kits
two unbuilt coach kits
five scratch built wagons and brake van unfinished
And the stuff turning over in my head is wont fit!!!
Rich
-
MDLR
-
IrishPeter
Updated to 30-9-12
Right now, the active projects are:
1. Build two tram locomotive bodies for the two Ruby-class locos that are lurking in the house
2. Build two more four wheelers for the tramway (became a bogie coach - in progress 9/12)
3. Start building station buildings (drawings being enlarged to scale - 9/12))
4. Build bridge over the middle path (done 8/12)
5. Extend the line southwards onto the former lawn (started)
6. Construct the other terminus.
7. Fit cab and car/drunk/cow-catchers to Millie
That should keep me quiet until about 2015!
Peter in AZ
1. Build two tram locomotive bodies for the two Ruby-class locos that are lurking in the house
2. Build two more four wheelers for the tramway (became a bogie coach - in progress 9/12)
3. Start building station buildings (drawings being enlarged to scale - 9/12))
4. Build bridge over the middle path (done 8/12)
5. Extend the line southwards onto the former lawn (started)
6. Construct the other terminus.
7. Fit cab and car/drunk/cow-catchers to Millie
That should keep me quiet until about 2015!
Peter in AZ
Who is online
Users browsing this forum: No registered users and 33 guests