I didn't realise Polyfilla was a beverage!! What does it go best with??MDLR:66689 wrote:Do you include the Polyfilla in that??Narrow Minded:66686 wrote:(as does the selection of beverages to the right of the photo!)
Building a station - a winter project
-
Narrow Minded
- Dr. Bond of the DVLR
- Retired Director

- Posts: 4533
- Joined: Tue Jun 09, 2009 9:43 pm
- Location: Suffolk
- Contact:
- planty
- Trainee Fireman

- Posts: 168
- Joined: Sun Oct 16, 2011 10:23 pm
- Location: Wakefield
- Contact:
Finished up the shelter, next up work on the platform!


Last edited by planty on Sat Aug 25, 2012 12:51 pm, edited 1 time in total.
--
The Methley Joint Railway - http://www.jasonplant.com/Pages/Railway.aspx
The Methley Joint Railway - http://www.jasonplant.com/Pages/Railway.aspx
-
METHSSNIFFER
- planty
- Trainee Fireman

- Posts: 168
- Joined: Sun Oct 16, 2011 10:23 pm
- Location: Wakefield
- Contact:
That's a great idea, I might look at putting in a grate on the platform with pipework to take the water away. Had thought of having some drainage pipes in the platform wall, just fake, but could plumb them into the grate.METHSSNIFFER:67458 wrote:Dont forget to put a drain under that downpipe as you may get the build damp at its foundation Im assuming your guttering will collect rainwater I use an open barrel on some builds but a length of pipe underground to a soakaway diverts it away.
--
The Methley Joint Railway - http://www.jasonplant.com/Pages/Railway.aspx
The Methley Joint Railway - http://www.jasonplant.com/Pages/Railway.aspx
-
benchmark
- planty
- Trainee Fireman

- Posts: 168
- Joined: Sun Oct 16, 2011 10:23 pm
- Location: Wakefield
- Contact:
Now the building is finished I've decided to tackle the platform.
I've taken some tips from this website http://www.gardenrailwayclub.com/worksh ... rockbank-1 particularly the idea of using mosaic tiles.
I found a couple of tiles going cheap.


The one on the left was in a larger 30x30cm tile, mesh backed that I could slice up. These were built up to form the walls.

These were shaped to form the platform as required. I've built the walls using grout, with wire coat hangers cut and fixed at random points (to add strength when concrete is added in the middle!). The plastic on the base is ducting for wiring up station lamps and the uprights will be either fence posts or are placeholders for lamps/signs.

I've taken some tips from this website http://www.gardenrailwayclub.com/worksh ... rockbank-1 particularly the idea of using mosaic tiles.
I found a couple of tiles going cheap.


The one on the left was in a larger 30x30cm tile, mesh backed that I could slice up. These were built up to form the walls.

These were shaped to form the platform as required. I've built the walls using grout, with wire coat hangers cut and fixed at random points (to add strength when concrete is added in the middle!). The plastic on the base is ducting for wiring up station lamps and the uprights will be either fence posts or are placeholders for lamps/signs.

Last edited by planty on Sat Aug 25, 2012 12:51 pm, edited 1 time in total.
--
The Methley Joint Railway - http://www.jasonplant.com/Pages/Railway.aspx
The Methley Joint Railway - http://www.jasonplant.com/Pages/Railway.aspx
- Sir Clothem Cap
- Driver

- Posts: 1708
- Joined: Sun Sep 26, 2010 8:45 pm
- Location: Hampshire
- Contact:
- planty
- Trainee Fireman

- Posts: 168
- Joined: Sun Oct 16, 2011 10:23 pm
- Location: Wakefield
- Contact:
The ducting across the base is actually half pipes, so it'll be open. Once I've threaded the wires up the vertical I'll tape the base up with gaffer tapeSir Clothem Cap:68448 wrote:That is very inventive, It may be wise to place the wiring in the ducts before you add the concrete as getting small wires to bend through 90 degrees in small ducting can be entertaining. It is looking good.
--
The Methley Joint Railway - http://www.jasonplant.com/Pages/Railway.aspx
The Methley Joint Railway - http://www.jasonplant.com/Pages/Railway.aspx
- planty
- Trainee Fireman

- Posts: 168
- Joined: Sun Oct 16, 2011 10:23 pm
- Location: Wakefield
- Contact:
Stanley Station opens in time for summer!
Sadly the regular MMS steam service is still in the shed for "firebox" repairs and the IP diesel replacement is still in "manufacturing".
Summer months should see regular passenger services to Stanley!

[/url]
Sadly the regular MMS steam service is still in the shed for "firebox" repairs and the IP diesel replacement is still in "manufacturing".
Summer months should see regular passenger services to Stanley!

[/url]
Last edited by planty on Sat Aug 25, 2012 12:51 pm, edited 1 time in total.
--
The Methley Joint Railway - http://www.jasonplant.com/Pages/Railway.aspx
The Methley Joint Railway - http://www.jasonplant.com/Pages/Railway.aspx
- planty
- Trainee Fireman

- Posts: 168
- Joined: Sun Oct 16, 2011 10:23 pm
- Location: Wakefield
- Contact:
Who is online
Users browsing this forum: No registered users and 47 guests

