
Chyknell getting a little blocked.

Even Ysgarlad was getting some.

As was Porthcadno........

So ploughing commenced (after I fitted new summerlands chuff pipes to the Edrig & LA).


After the Edrigs go the RoundJack took over.



The trouble was the snow was settling well onto already iced up rails. This called for more muscle so the Lady Anne & Roundjack teamed up.

No 6 attacks the snow whilst No 4 waits to add extra traction if needed..



In the end the snow was falling too hard. Before I had got 1/4 of a way around the line, the place I had started would be under another inch of snow.

So ploughing was abandoned & the locos taken back to shed whilst they could still get there. Line closed UFN.














