

Having cast all those resin doors and windows it would be rude not to start a building. My first station based on the Eassie design for Lydney junction with an Awre station waiting room. I have truncated it to fit the artificial slates and because at nearly 3 foot long it was becoming unwieldy. Construction will follow the same manner as the goods shed. Mr cock up has already come calling as the gents has a lean to roof at one end finishing at the height of the door. I should have allowed for this smaller door when placing the toilet window at the back....the roof level cuts throgh the top pane
Mr Eassie (or his father) was also responsible for building the pre fabricated hospitals for the Crimean war from an IKB idea. The dark winter nights fly by when your reading Wikipedia.....










