The B.E.R - The Rebuild Begins!

A place for the discussion of garden railways and any garden style/scale portable and/or indoor layouts
User avatar
Soar Valley Light
Driver
Driver
Posts: 1451
Joined: Sun Dec 08, 2013 5:18 pm
Location: North West Leicestershire

Re: The B.E.R - Construction begins

Post by Soar Valley Light » Fri Sep 01, 2017 8:29 pm

Well done Jon,

It looks great now you've got some ballast down. It's a nice, neat and tidy bit of work. Are you fixing the track down to anything or loose laying in the ballast?

Andrew
"Smith! Why do you only come to work four days a week?
"'cause I can't manage on three gaffer!"

angr607
Fireman
Fireman
Posts: 280
Joined: Fri Aug 24, 2012 12:05 am
Location: West Sussex

Re: The B.E.R - Construction begins

Post by angr607 » Fri Sep 01, 2017 11:18 pm

Thanks for all the comments guys. It's so good to finally get something permanent down!
Soar Valley Light wrote: Fri Sep 01, 2017 8:29 pm Well done Jon,

It looks great now you've got some ballast down. It's a nice, neat and tidy bit of work. Are you fixing the track down to anything or loose laying in the ballast?

Andrew
Track is being laid loose. I've left the nails in the track from when its being removed from the wooden planks which does something to hold it in place (well, in my mind it does). That said, it is all jacked and packed to make sure its level. First trains should be tomorrow hopefully!

Speaking of track.......

Image
The final 3 yards are down! Total running line is about 10-11 yards (I think, I haven't measured it!) but I'm happy. Plus I've got 3 bags of gravel and 5 yards of track spare ready to start across the lawn (when the parents let me...)

Image
The spare track. Mostly in one piece. Unsurprisingly, the track on some of the newer boards didn't want to come off!

First trains (battery powered to make life easier) should be tomorrow. Stock hasn't been decided yet but may end up being the welshpool set (again for ease).

Cheers,

Jon
Bowaters Models:- http://www.bowatersmodels.co.uk

Current Projects:-
Rebuilding the Railway!
Turning a Second hand 'Superior' into Bowaters 'Superior'

angr607
Fireman
Fireman
Posts: 280
Joined: Fri Aug 24, 2012 12:05 am
Location: West Sussex

Re: The B.E.R - Construction begins

Post by angr607 » Sat Sep 02, 2017 2:48 pm

Only one image from today. First test runs were done with my IPE Jessica and two FR coaches. Surprisingly level for something I've built! Not bad really. Need to get some heavier locos running over it to start fully bedding it in but I'm happy. That's for another day unless I get back early enough from work either today or tomorrow....

Image
Short test train under power.

Cheers,

Jon
Bowaters Models:- http://www.bowatersmodels.co.uk

Current Projects:-
Rebuilding the Railway!
Turning a Second hand 'Superior' into Bowaters 'Superior'

User avatar
tom_tom_go
Driver
Driver
Posts: 4824
Joined: Wed Feb 23, 2011 3:08 am
Location: Kent, UK
Contact:

Re: The B.E.R - Construction begins

Post by tom_tom_go » Sat Sep 02, 2017 3:00 pm

Those coaches are big boys aren't they :thumbup:

Big Jim
Moderator
Moderator
Posts: 2694
Joined: Sat Jul 06, 2013 5:28 pm
Location: Near Llanelli

Re: The B.E.R - Construction begins

Post by Big Jim » Sat Sep 02, 2017 3:44 pm

A train of five of them behind a steamer is going to look spectacular.
If at first you don't succeed, use a bigger hammer!

angr607
Fireman
Fireman
Posts: 280
Joined: Fri Aug 24, 2012 12:05 am
Location: West Sussex

Re: The B.E.R - Construction begins

Post by angr607 » Sat Sep 02, 2017 5:19 pm

Big Jim wrote: Sat Sep 02, 2017 3:44 pm A train of five of them behind a steamer is going to look spectacular.
You mean like this?

Image
Leader and 5 FR coaches together.

And who knows, that train might get even longer soon....... :D Back from work early and the weather is still stunning. Time to break out Superior I think! Nice heavy loco should bed the track in nicely........

Cheers,

Jon
Bowaters Models:- http://www.bowatersmodels.co.uk

Current Projects:-
Rebuilding the Railway!
Turning a Second hand 'Superior' into Bowaters 'Superior'

Big Jim
Moderator
Moderator
Posts: 2694
Joined: Sat Jul 06, 2013 5:28 pm
Location: Near Llanelli

Re: The B.E.R - Construction begins

Post by Big Jim » Sat Sep 02, 2017 8:07 pm

That looks mightily splendid.
If at first you don't succeed, use a bigger hammer!

angr607
Fireman
Fireman
Posts: 280
Joined: Fri Aug 24, 2012 12:05 am
Location: West Sussex

Re: The B.E.R - Construction begins

Post by angr607 » Sat Sep 02, 2017 8:13 pm

Having got back from work eariler than planned, time to run a train. A rudy heavy one at that!

Stock was my Welshpool set which although not very heavy, don't roll as nicely as they should (I really should Oil them at some point.......) plus Superior. A nice heavy loco to test it all properly (well, it is the biggest I own!).

Image
Raising Steam. I think I've found the perfect steam up area (for now).

Image
After about 20 minutes light engine to let the ballast settle, The test train awaits!

Image
Quick couple up and then.....

Image
Off we go! Only a short run down the track but with the regulator cracked open and 20psi on the gauge, takes a surprisingly long time to get to the other end!

Image
Leaves a surprisingly nice steam trail as well!

Image
Run complete after about 45 minutes. Time to let the steam vent out before packing away!

Been a long time since I ran a successful train in my garden with only 1 derailment after a very rapid stop (that brick does a good job as a buffer stop!).

Safe to say I'm very happy! Bring on the next stage (most likely in February or later depending on if the parents say yes or not......)

Cheers,

Jon
Bowaters Models:- http://www.bowatersmodels.co.uk

Current Projects:-
Rebuilding the Railway!
Turning a Second hand 'Superior' into Bowaters 'Superior'

User avatar
Soar Valley Light
Driver
Driver
Posts: 1451
Joined: Sun Dec 08, 2013 5:18 pm
Location: North West Leicestershire

Re: The B.E.R - Construction begins

Post by Soar Valley Light » Sat Sep 02, 2017 8:53 pm

Very nice Jon. Congratulations on some smart work and on getting some trains running.

The pins in the track will help a lot with the alignment as they will go a long way to resisting lateral movement. This has a full sized parallel. Through bolt standard gauge track is renowned for holding gauge long after the sleepers have become 'ant fodder', screwed down chairs would have long since headed for 'Brunel gauge' in on similar sleepers!

Andrew
"Smith! Why do you only come to work four days a week?
"'cause I can't manage on three gaffer!"

User avatar
tom_tom_go
Driver
Driver
Posts: 4824
Joined: Wed Feb 23, 2011 3:08 am
Location: Kent, UK
Contact:

Re: The B.E.R - Construction begins

Post by tom_tom_go » Sat Sep 02, 2017 9:06 pm

All that matters is you enjoy it mate, well done!

User avatar
Soar Valley Light
Driver
Driver
Posts: 1451
Joined: Sun Dec 08, 2013 5:18 pm
Location: North West Leicestershire

Re: The B.E.R - Construction begins

Post by Soar Valley Light » Sun Sep 03, 2017 6:18 pm

tom_tom_go wrote: Sat Sep 02, 2017 9:06 pm All that matters in you enjoy it mate, well done!
Absolutely! That's the Alpha and Omega of what we are all about. I couldn't agree more Tom. :thumbleft:

Andrew
"Smith! Why do you only come to work four days a week?
"'cause I can't manage on three gaffer!"

Big Jim
Moderator
Moderator
Posts: 2694
Joined: Sat Jul 06, 2013 5:28 pm
Location: Near Llanelli

Re: The B.E.R - Construction begins

Post by Big Jim » Sun Sep 03, 2017 8:07 pm

Hear hear.
If at first you don't succeed, use a bigger hammer!

User avatar
tom_tom_go
Driver
Driver
Posts: 4824
Joined: Wed Feb 23, 2011 3:08 am
Location: Kent, UK
Contact:

Re: The B.E.R - Construction begins

Post by tom_tom_go » Mon Sep 04, 2017 4:39 pm

Have you thought about adding an inertia wagon Jon, it would make your trains run much slower and give longer run time (helps on little lines like ours).

angr607
Fireman
Fireman
Posts: 280
Joined: Fri Aug 24, 2012 12:05 am
Location: West Sussex

Re: The B.E.R - Construction begins

Post by angr607 » Mon Sep 04, 2017 10:19 pm

tom_tom_go wrote: Mon Sep 04, 2017 4:39 pm Have you thought about adding an inertia wagon Jon, it would make your trains run much slower and give longer run time (helps on little lines like ours).
The thought does cross my mind from time to time. That said, I get fairly slow speeds with the engines as it is. Its just a case of choosing the right rolling stock to go with the engine!

Fingers crossed when the weather clears up, I'll get some more running in. My FR set hasn't run a one ever so might be time to correct that!

Cheers,

Jon
Bowaters Models:- http://www.bowatersmodels.co.uk

Current Projects:-
Rebuilding the Railway!
Turning a Second hand 'Superior' into Bowaters 'Superior'

angr607
Fireman
Fireman
Posts: 280
Joined: Fri Aug 24, 2012 12:05 am
Location: West Sussex

Re: The B.E.R - Construction begins

Post by angr607 » Thu Nov 09, 2017 2:01 pm

Its happening! Work has started on the extension. Its broken into two phases to make it manageable. Phase one makes use of existing track and runs for 15ft down the garden installing a passing loop and three sidings. Phase 2 finishes off the running line and will either end in another runround loop or will end in a series of sidings. I haven't decided yet. First stage of the work was to install the barrier between the garden and the railway. I'm happy with it and even with my bodging, it looks good. Next once the parents have seen it and are happy with the amount of space taken up, then the grass needs removing and ballast/track laid. Then its testing time again!

Image
Barrier in place with track laid in place to check fit. I've even managed to fit a 45mm gauge line in as well although that might go if the parents aren't happy.

Image
Ballast in store waiting for Sunday (or monday) for work to begin on the heavy work!

Cheers,

Jon
Bowaters Models:- http://www.bowatersmodels.co.uk

Current Projects:-
Rebuilding the Railway!
Turning a Second hand 'Superior' into Bowaters 'Superior'

bazzer42
Driver
Driver
Posts: 1215
Joined: Sun Nov 25, 2012 1:37 pm
Location: Forest of Dean

Re: The B.E.R - Construction begins

Post by bazzer42 » Thu Nov 09, 2017 7:17 pm

Nicely in line with the shed I reckon. Would it pay to treat the shed if you are going lay track down there, access could be a bit tight. That said I usually lay a couple of boards across my track if I'm treating the decking sides.

Good progress.

User avatar
tom_tom_go
Driver
Driver
Posts: 4824
Joined: Wed Feb 23, 2011 3:08 am
Location: Kent, UK
Contact:

Re: The B.E.R - Construction begins

Post by tom_tom_go » Thu Nov 09, 2017 7:37 pm

Nice busy yard area.

You thought about how you are going to go about uncoupling and operating the run around loop at ground level?

angr607
Fireman
Fireman
Posts: 280
Joined: Fri Aug 24, 2012 12:05 am
Location: West Sussex

Re: The B.E.R - Construction begins

Post by angr607 » Thu Nov 09, 2017 10:24 pm

Thanks for the comments Gents.
tom_tom_go wrote: Thu Nov 09, 2017 7:37 pm Nice busy yard area.

You thought about how you are going to go about uncoupling and operating the run around loop at ground level?
The loop is arm length from the edge of the line to the furthest loop. I'm not planning on doing any coupling/uncoupling there anyway! That's for the existing main line section. That said, Its all accessable so shouldn't be a problem. That said, the 45mm might not survive for long depending on how I feel (its not something that gets used a lot if at all!) so all for the future once the 32mm in in properly with test trains run.
bazzer42 wrote: Thu Nov 09, 2017 7:17 pm Nicely in line with the shed I reckon. Would it pay to treat the shed if you are going lay track down there, access could be a bit tight. That said I usually lay a couple of boards across my track if I'm treating the decking sides.

Good progress.
The Shed needs repainting fairly soon but that belongs to my parents so....... they can decide about that! The line won't run past the shed until early next year at the earliest. Something about having a Model Railway Range to support sucking up all the money at the moment.....

Hopefully, we should have some images on Sunday with some ballast down if not early next week.

Cheers,

Jon
Bowaters Models:- http://www.bowatersmodels.co.uk

Current Projects:-
Rebuilding the Railway!
Turning a Second hand 'Superior' into Bowaters 'Superior'

angr607
Fireman
Fireman
Posts: 280
Joined: Fri Aug 24, 2012 12:05 am
Location: West Sussex

Re: The B.E.R - Construction begins

Post by angr607 » Tue Nov 14, 2017 4:54 pm

Couple of days later than planned, it is done (almost). It took two of us (me and dad) 6 hours to complete but its been worth it.

Image
The first job was the remove the turf from the section of garden. Surprisingly easy to do but still took a long time.

Image
Next, we put down the weed proof membrane onto the ground. Something I didn't do on the existing railway and boy, do I regret not doing it!

Image
Next, the fun stuff starts. Ballasting! First pass took 12 bags of gravel with the second pass taking another 3. The membrane got trimmed as well at this point.

Image
First track then went down. 45mm gauge first as its easier to lay. LGB track was used thoughout and unsurprisingly was down in minutes. First time I've had 45mm gauge out in about 5 years!

Image
Now the track that will see the most use, The 32mm! Passing loop is long enough for a Brazil and two WHR coaches (Note, WHR not FR) which should be good. Only one joint needs trimming but the weather turned awful at that point so.... that can wait for another day. The track also needs packing but I suspect that will have to wait until better weather so I can get a loco out and start to test it all!

Safe to say I'm happy with the progress. I'm out of 32mm track now plus the parents want to see it bedded in before approving stage 2 so that's for another day.

Cheers,

Jon
Bowaters Models:- http://www.bowatersmodels.co.uk

Current Projects:-
Rebuilding the Railway!
Turning a Second hand 'Superior' into Bowaters 'Superior'

bazzer42
Driver
Driver
Posts: 1215
Joined: Sun Nov 25, 2012 1:37 pm
Location: Forest of Dean

Re: The B.E.R - Construction begins

Post by bazzer42 » Tue Nov 14, 2017 5:59 pm

Nice tidy job you've made there. I'm still trying to replant moss here to hide my gravel!

Post Reply

Who is online

Users browsing this forum: No registered users and 6 guests