So this week I have removed the plants above the tunnel, and removed the tunnel roof, so that the railway can be re-aligned to a easier 4 foot radius, and my improved over 3 years tracklaying skills should make sure there are no bad joints.


Here you can see the tunnel top removed and a corner of the shed which is to be demolished
There is more however! Part of the upper balloon loop ran through a knackered "wendy house" type shed that me and riveresk used to play in when we were younger. However the low doors and roof makes it a big hazard to heads, and sice the floor is rotten it is being removed. The space made will allow for the slate qyarry area to be expanded, and also a new proper upper station will be built. This will allow me to do "service running" open days, something that has recently become a big hit at NWAG open days at lines in Morecambe recently. It is where the railway is run like a real railway, moving goods loads and passengers (well ok, little mail sacks) and sticking to token block operating passing trains in loops. Of course my line will have slate workings to liven things up.
I couldn't do this previosly as I had no main upper station. But before I can do it, there is a lot of work to do!