WHR 26
- Dr. Bond of the DVLR
- Retired Director
- Posts: 4485
- Joined: Tue Jun 09, 2009 9:43 pm
- Location: Suffolk
- Contact:
Ooooh, only very few people know about it. hmmm what can I say...
I like things which haven't been done before so think about what could be impossible in 16mm scale which I want to make work.
Then think about two totally different carriages (One 3ft gauge the other standard gauge) mated together with some coffee stirrers and LASER cut bits thrown in!
I might not get it finished though!
I like things which haven't been done before so think about what could be impossible in 16mm scale which I want to make work.
Then think about two totally different carriages (One 3ft gauge the other standard gauge) mated together with some coffee stirrers and LASER cut bits thrown in!
I might not get it finished though!
The railway which people forgot
(to build)
- taliesin001
- Driver
- Posts: 1594
- Joined: Mon Feb 08, 2010 8:04 pm
- Location: Hampton Hargate, Peterborough
-
- Driver
- Posts: 4650
- Joined: Wed Dec 30, 2009 2:27 pm
- Location: Forgotten Realms
- Contact:
- taliesin001
- Driver
- Posts: 1594
- Joined: Mon Feb 08, 2010 8:04 pm
- Location: Hampton Hargate, Peterborough
- taliesin001
- Driver
- Posts: 1594
- Joined: Mon Feb 08, 2010 8:04 pm
- Location: Hampton Hargate, Peterborough
With only a few days to go until stoneleigh the coach appears to be well on it's way to completiton. The pics below show the progress. Left to do is fit the door hinges, finish the lettering, fit the enamel door signs (still haven't arrived but I have been assured they will arrive this week) and paint and add a few pieces of strapping.
- Dr. Bond of the DVLR
- Retired Director
- Posts: 4485
- Joined: Tue Jun 09, 2009 9:43 pm
- Location: Suffolk
- Contact:
-
- Driver
- Posts: 1508
- Joined: Thu Jan 07, 2010 11:46 pm
- Location: LEICESTER
- taliesin001
- Driver
- Posts: 1594
- Joined: Mon Feb 08, 2010 8:04 pm
- Location: Hampton Hargate, Peterborough
-
- Retired Director
- Posts: 3536
- Joined: Sat Aug 18, 2007 11:00 pm
- taliesin001
- Driver
- Posts: 1594
- Joined: Mon Feb 08, 2010 8:04 pm
- Location: Hampton Hargate, Peterborough
-
- Driver
- Posts: 4650
- Joined: Wed Dec 30, 2009 2:27 pm
- Location: Forgotten Realms
- Contact:
-
- Driver
- Posts: 1508
- Joined: Thu Jan 07, 2010 11:46 pm
- Location: LEICESTER
-
- Driver
- Posts: 4650
- Joined: Wed Dec 30, 2009 2:27 pm
- Location: Forgotten Realms
- Contact:
- Pendo Pilot
- Driver
- Posts: 1897
- Joined: Sun Apr 04, 2010 12:24 am
- Location: South Staffordshire UK
- Contact:
- Merddin Emrys
- Fireman
- Posts: 279
- Joined: Sat Dec 20, 2008 10:47 pm
- taliesin001
- Driver
- Posts: 1594
- Joined: Mon Feb 08, 2010 8:04 pm
- Location: Hampton Hargate, Peterborough
thanks alot! It certainly has taken a very long time. Today I have nearly managed to finish the lettering and I have added the final bits of strapping on the ends. My enamel door signs still haven't turned up but a call to blackham transfers reveals that they have been sent but if I don't recieve them I will have to run over to the stand on saturday and glue them on then! I might get round to posting the final pics on friday night.
- taliesin001
- Driver
- Posts: 1594
- Joined: Mon Feb 08, 2010 8:04 pm
- Location: Hampton Hargate, Peterborough
Who is online
Users browsing this forum: No registered users and 2 guests