tram project is finished!!!!!!!!!!!!!

Discussion of Live Steam locomotives should be located here
User avatar
PCLR
Trainee Driver
Trainee Driver
Posts: 747
Joined: Sun May 17, 2009 9:27 pm
Location: Buckinghamshire England

Post by PCLR » Fri Jan 08, 2010 9:06 pm

oh ok good then for two ip 4 wheel coachs
(the open air ones)
Buckinghamshire Railway Centre !!
VAMES!!
keeping steem alive if a little smaller!
Michael

User avatar
Hancockshire
Driver
Driver
Posts: 1204
Joined: Tue Apr 14, 2009 11:06 am
Location: Stranraer
Contact:

Post by Hancockshire » Fri Jan 08, 2010 9:35 pm

Can I design the body for you using CAD?
Image

User avatar
PCLR
Trainee Driver
Trainee Driver
Posts: 747
Joined: Sun May 17, 2009 9:27 pm
Location: Buckinghamshire England

Post by PCLR » Fri Jan 08, 2010 9:53 pm

yes please do can you keep it sqare and brown with PCLR in bold white letters on the side
Buckinghamshire Railway Centre !!
VAMES!!
keeping steem alive if a little smaller!
Michael

User avatar
Hancockshire
Driver
Driver
Posts: 1204
Joined: Tue Apr 14, 2009 11:06 am
Location: Stranraer
Contact:

Post by Hancockshire » Fri Jan 08, 2010 9:59 pm

Square & brown. Right ho. I'll use my guards van for dimensions.
Image

User avatar
PCLR
Trainee Driver
Trainee Driver
Posts: 747
Joined: Sun May 17, 2009 9:27 pm
Location: Buckinghamshire England

Post by PCLR » Fri Jan 08, 2010 10:00 pm

thanks i may them as blue prints!!!
Buckinghamshire Railway Centre !!
VAMES!!
keeping steem alive if a little smaller!
Michael

User avatar
PCLR
Trainee Driver
Trainee Driver
Posts: 747
Joined: Sun May 17, 2009 9:27 pm
Location: Buckinghamshire England

Post by PCLR » Wed Jan 13, 2010 7:11 pm

A little procress on the tram i have overhaul the mamod minor (steam heart) i have also orded many meccano sprocket and some chain i have work out a ratio of 6:1 i have also cut the buffer beam also going to a hardware shop to get some oak for the chassic
off the next two weeks its real going to come together
Buckinghamshire Railway Centre !!
VAMES!!
keeping steem alive if a little smaller!
Michael

SillyBilly
Retired Director
Retired Director
Posts: 3536
Joined: Sat Aug 18, 2007 11:00 pm

Post by SillyBilly » Wed Jan 13, 2010 7:25 pm

PCLR wrote:i have work out a ratio of 6:1
That's going to be quite quick I would've thought, what's the RPM of these things?

User avatar
PCLR
Trainee Driver
Trainee Driver
Posts: 747
Joined: Sun May 17, 2009 9:27 pm
Location: Buckinghamshire England

Post by PCLR » Wed Jan 13, 2010 8:17 pm

about 550 rpm 6 try on the fly = 1 turn of the wheels
Buckinghamshire Railway Centre !!
VAMES!!
keeping steem alive if a little smaller!
Michael

User avatar
Dr. Bond of the DVLR
Retired Director
Retired Director
Posts: 4485
Joined: Tue Jun 09, 2009 9:43 pm
Location: Suffolk
Contact:

Post by Dr. Bond of the DVLR » Wed Jan 13, 2010 8:18 pm

Hmm, I once had a go and used 1:12 gearing which gave a slow and powerful run with a mamod minor, but then I really love trains running slow!
Image
The railway which people forgot
(to build)

User avatar
PCLR
Trainee Driver
Trainee Driver
Posts: 747
Joined: Sun May 17, 2009 9:27 pm
Location: Buckinghamshire England

Post by PCLR » Wed Jan 13, 2010 8:21 pm

my ratio is an esterment i think i can get a 10 to1 which it better
Buckinghamshire Railway Centre !!
VAMES!!
keeping steem alive if a little smaller!
Michael

User avatar
Dr. Bond of the DVLR
Retired Director
Retired Director
Posts: 4485
Joined: Tue Jun 09, 2009 9:43 pm
Location: Suffolk
Contact:

Post by Dr. Bond of the DVLR » Wed Jan 13, 2010 8:23 pm

That would be much better! More power that way too!
Image
The railway which people forgot
(to build)

User avatar
PCLR
Trainee Driver
Trainee Driver
Posts: 747
Joined: Sun May 17, 2009 9:27 pm
Location: Buckinghamshire England

Post by PCLR » Wed Jan 13, 2010 8:25 pm

yeah i like power it will aonly pull some open air carrages
Buckinghamshire Railway Centre !!
VAMES!!
keeping steem alive if a little smaller!
Michael

User avatar
PCLR
Trainee Driver
Trainee Driver
Posts: 747
Joined: Sun May 17, 2009 9:27 pm
Location: Buckinghamshire England

Post by PCLR » Thu Jan 14, 2010 7:42 pm

some for procress


   mamod minor finish will exhast and 3/4 sprocket
   the 2 inch and anothere 3/4 sprocket
   also the brass gear which will rever the rotaion
Image
the first run at plesy2105
Image
the steam engine finsihed
i have borded out the cylinder from 9 to10 mm to gove me an efficany of 0.23%

Image

Image
the main tranmission link to the gear box
Buckinghamshire Railway Centre !!
VAMES!!
keeping steem alive if a little smaller!
Michael

User avatar
Dr. Bond of the DVLR
Retired Director
Retired Director
Posts: 4485
Joined: Tue Jun 09, 2009 9:43 pm
Location: Suffolk
Contact:

Post by Dr. Bond of the DVLR » Thu Jan 14, 2010 8:47 pm

Looks to be a promising project! what gear ratio are you going to go with in the end?
Image
The railway which people forgot
(to build)

User avatar
PCLR
Trainee Driver
Trainee Driver
Posts: 747
Joined: Sun May 17, 2009 9:27 pm
Location: Buckinghamshire England

Post by PCLR » Thu Jan 14, 2010 8:56 pm

not sure yet got a lot of gears just need to put then in the right place
Buckinghamshire Railway Centre !!
VAMES!!
keeping steem alive if a little smaller!
Michael

User avatar
PCLR
Trainee Driver
Trainee Driver
Posts: 747
Joined: Sun May 17, 2009 9:27 pm
Location: Buckinghamshire England

Post by PCLR » Fri Jan 15, 2010 7:23 pm

more importeant procress the gear and motion work is finish, i spent a lunch time at school sweat of a lathe turn and milling sprockett out

here the results

Image

Image


Image
the bussiness end of the operation i got a ratio of 14:1 wthich will be great!!!
Buckinghamshire Railway Centre !!
VAMES!!
keeping steem alive if a little smaller!
Michael

User avatar
Dr. Bond of the DVLR
Retired Director
Retired Director
Posts: 4485
Joined: Tue Jun 09, 2009 9:43 pm
Location: Suffolk
Contact:

Post by Dr. Bond of the DVLR » Fri Jan 15, 2010 7:35 pm

Gosh this tram will be quite long then?
Image
The railway which people forgot
(to build)

User avatar
Dr. Bond of the DVLR
Retired Director
Retired Director
Posts: 4485
Joined: Tue Jun 09, 2009 9:43 pm
Location: Suffolk
Contact:

Post by Dr. Bond of the DVLR » Fri Jan 15, 2010 7:39 pm

Sorry I originaly missed the start of this thread, are you still going to steam ekectric it or just steam power?
Image
The railway which people forgot
(to build)

User avatar
PCLR
Trainee Driver
Trainee Driver
Posts: 747
Joined: Sun May 17, 2009 9:27 pm
Location: Buckinghamshire England

Post by PCLR » Fri Jan 15, 2010 7:53 pm

just steam power them there no need to mess around with electricls
the tram will be the same wheel base and length as an edrig but 1 cm wider
Buckinghamshire Railway Centre !!
VAMES!!
keeping steem alive if a little smaller!
Michael

User avatar
PCLR
Trainee Driver
Trainee Driver
Posts: 747
Joined: Sun May 17, 2009 9:27 pm
Location: Buckinghamshire England

Post by PCLR » Sat Jan 16, 2010 8:51 pm

THE BIG NEWS !!!

The chassic is finish the steam heart is finish and mounted and the gearbox and body is not

Image

Image
[
url=./myff/692457/DSCN0215.jpg]Image[/url]

Image
Buckinghamshire Railway Centre !!
VAMES!!
keeping steem alive if a little smaller!
Michael

Post Reply

Who is online

Users browsing this forum: No registered users and 2 guests