
The line into the station is at 1 in 50 to keep me above ground level
The line off the right line of the point will run into my dads workshop and will be at 1 in 25!

The work on the extension has been shared between me and my dad, with the blockwork by dad, and the hamering out of the concrete thats there by me (where the trench begins, the trackbed changes to shuttered concrete as used on the rest of the A and NLR from the bottom end of Afallen
There will need to be a lot done when this section of line is ready to make the area look pretty!


