Page 1 of 1

Tamping the sleepers on the ASCR

Posted: Wed Dec 07, 2022 10:45 am
by GAP
Seven wooden sleepers replaced with concrete ones, after attaching to the rail the ballast was "tamped" under them to give a solid foundation.
Powered by 2 Honda 4 stroke engines.

The "Tamper" in action view from the side
IMG_20221205_102203.jpg
IMG_20221205_102203.jpg (222.12 KiB) Viewed 6665 times
View from the front
IMG_20221205_102216.jpg
IMG_20221205_102216.jpg (216.56 KiB) Viewed 6665 times
Tynes raised in the move position
IMG_20221205_102239.jpg
IMG_20221205_102239.jpg (165.58 KiB) Viewed 6665 times
Tynes lowered to tamping position
IMG_20221205_102252.jpg
IMG_20221205_102252.jpg (211.67 KiB) Viewed 6665 times