West Shropshire Mineral Railway, was Blank canvas W.I.P.

A place for the discussion of garden railways and any garden style/scale portable and/or indoor layouts
Resurgam05

Post by Resurgam05 » Mon Aug 13, 2012 9:48 pm

First rate job there Steve.

Pendo Pilot

Post by Pendo Pilot » Tue Aug 14, 2012 10:23 am

Looking superb fella, coming on well.

DVT Dweller

Post by DVT Dweller » Mon Aug 27, 2012 10:08 pm

Ok so its taken me a little longer than a week to update this but work, Evans 1st birthday/christening and our wedding anniversary have gotten in the way, as well as a general tidy up of the garden and garage.
So back tracking abit……

Dads Hunslet and my VoR testing the completed circuit:

Image

The completed block work for the triangle before the last working day:

Image

By the end of the working day the slate had been bedded in well, some planting had taken place and log roll had been placed along the front of the blocks after Mike “re-deployed” some that was going spare. Big thank you to all involved, Mike and dad doing some sterling work with the slate. Also a big thank you to them both for the slate that mike provided that he no longer needed and the use of dads wallet to pick up some more chunks from the garden centre:

Image

On the afternoon of the last working day we found that the track was prone to splitting due to it having very few pins in it. I then spent an evening pinning all the points and putting pins in every other piece of track. 1” panel pins seem to go into the blocks fine and hold the track with a nice bit of float in it, even through the few sunny days we’ve had there has been no twisting or buckling of the rails. Dads Baguley had arrive to be converted to digital RC and was used to work the engineering train (once id got used to the Brian Jones speed controller):

Image

A gentleman who used to be a regular at the Winster Valley has been having problems with his kit built Lady Anne after she had a heavy fall at the Admiralty light railway last year. At this years get-together Robert asked me if I would take it home to have a look at her. A few minor adjustments and she was ready for a test run, seen here after leaving Abbey works (Shrewsbury Abbey being the station next to the garage):

Image

Gareth called around mid-week to give his Leek & Manifold a run after his running turns at Welshpool, Roberts Lady Anne getting another test run:

Image

Image

Image

I picked up some more log roll the other day to finish of the edging in front of the blocks and Ffi went around deciding where she wanted some of the plants putting. Sorry these photos where taken through the patio doors one day before I left for work. There’s been a few more plants place around since these shots:

Image

Image

We’ve made a flower bed by the garage door, this will become a little more scenic and have a couple of buildings in it along with the area in the middle of the triangle:

Image

And finally a new lap record was made of the raised circuit of 6.15.…… minutes! By my phoenix look alike battery loco. Unfortunately whist entertaining Evan as he watched it very slowly trundle around the garden she suffered a gearbox failure. So now it will need rebuilding, something I’ve been meaning to do for a long time, it might be able to pull the side off a house but it would take it a week to do it:

Image

Sorry to anyone who has to put up with seeing some of these bits more than once FB.

MDLR

Post by MDLR » Tue Aug 28, 2012 1:06 pm

I think I'm going to have to blag myself an invitation..................

DVT Dweller

Post by DVT Dweller » Tue Aug 28, 2012 8:01 pm

MDLR:74103 wrote:I think I'm going to have to blag myself an invitation..................
Don't need to blag one Brian just led us know when your thinking of heading over and we will let you know if we are around.

Sir haydn

Post by Sir haydn » Tue Aug 28, 2012 8:03 pm

Looks brilliant steve. Just shows how quickly a railway can spring up.

User avatar
dougrail
Driver
Driver
Posts: 1535
Joined: Mon Mar 14, 2011 5:11 pm
Location: Salopia; on the edge of Arcadia

Post by dougrail » Tue Aug 28, 2012 8:23 pm

Very inspirational, thanks for showing us as it's progressed. :) Doesn't look oscillator friendly though?

Pendo Pilot

Post by Pendo Pilot » Tue Aug 28, 2012 8:26 pm

Looking superb fella, the hard work is paying off. (even if you had a working party you easylife! LOL )

Will drop down when the shifts align again & it's not raining. :D

DVT Dweller

Post by DVT Dweller » Mon Sep 10, 2012 12:04 am

Thanks guys,

It's nice to have something to run in the garden and Ffi is alot happier now it's not just a row of blocks at the bottom of the garden. Haven't had much time to get out there and do anything lately. The garage roof has needed some sections replacing so that it's water tight to allow me to set up a work bench area, so thats taken most of my time and budget lately.

Doug, my SL3 is quite happy trundling around so it seems to be ok.

Shane, I think of it more as reclaiming days spent working on their railways lol.

Next project I'm working on is a turntable to go in Abby station, I'm possible thinking a lazy Susan with a concrete surround.

Annie

Post by Annie » Tue Sep 11, 2012 9:55 am

It was really interesting to see your railway develop from a bare backyard to a completed line with scenic earthworks being established. Thanks for sharing.

Mike PVLR

Post by Mike PVLR » Sat Dec 22, 2012 9:28 pm

It's about time a little more progress was made mate. dont know about planning a running day think we need another progress day.

Post Reply

Who is online

Users browsing this forum: No registered users and 16 guests