Re: Track laying and ballasting with photos - advice and suggestions please!
Posted: Thu Aug 02, 2018 8:12 pm
Phew, what a scorcher! Almost too hot to work. The cool of the morning was spent replacing the punctured wheels in two wheelbarrow. I've replaced the pneumatic wheels with PU foam filled 14" puncture proof wheels, together with new axles. The barrows were always being overloaded with building materials, so the lugs for the wheels were bent backwards & the wheels wouldn't fit. It would have been so much easier, if my sons would put my tools back in the correct place after they used them
There's some earth moving required, so barrows & sons will be required very soon.. I been having second thoughts about the lattice girders for the third bridge. I had to shorten their length to fit, so I sprayed a small section of the waste, but the result didn't please me. I think a length of galvanised steel anglebead from Wickes, pinned along each side will look good as safety rails. I'll get some tomorrow. I've started assembling the bents to create the trestle section that will run between & above the two areas of decking, close to the bar. I would have got more done but a large green water tank filled with odds & ends & a pile of white masonry blocks have been recently (last Saturday) stacked on the line of my permanent way. The plant troughs through which the rails will pass were constructed in part with old stair treads replaced in the house about three months. They were bone dry & I used them for the bottoms of the two troughs. Well, they are now re-hydrated! Buggrit.
There's some earth moving required, so barrows & sons will be required very soon.. I been having second thoughts about the lattice girders for the third bridge. I had to shorten their length to fit, so I sprayed a small section of the waste, but the result didn't please me. I think a length of galvanised steel anglebead from Wickes, pinned along each side will look good as safety rails. I'll get some tomorrow. I've started assembling the bents to create the trestle section that will run between & above the two areas of decking, close to the bar. I would have got more done but a large green water tank filled with odds & ends & a pile of white masonry blocks have been recently (last Saturday) stacked on the line of my permanent way. The plant troughs through which the rails will pass were constructed in part with old stair treads replaced in the house about three months. They were bone dry & I used them for the bottoms of the two troughs. Well, they are now re-hydrated! Buggrit.