The railway will run down the side of the garden and wil be about 2' off the ground behind a very handy wooden wall that already exists.
I have dug out about 4 inches deep behind the wooden edging and barrowed in about 4 tons of scalpings to form the track bed. So far, so good, see photo.

This gives a general view looking down the garden.
Next step, I bought bags of 3mm to dust chipping from the local quarry - £1.50 per bag, good value.
Using PECO SM32 track, i first laid a layer of the the chipping, then put the track onto it and ballasted around.
This didn't work at all well - there just isnt enough 'meat' in the peco sleepers for the ballast to grip and not enough weigh in the track to hold it down - and the hollow sleepers meant that 'packing' was impossible.
so my experimental lengths were ripped up. Next attempt was to lay two longtudinal wooden strips, approx 15mm square onto the ballast and then nail the track to this. Worked much better - the ballast was very firm and there was plenty of meat to be gripped, so the track was not moving around.
All was OK until yesterday - torrential rain all afternoon and this morning al ballast washed away! No idea where it went, but i was left with the wooden strips and track marooned on a thin layer of the fine chipping.
so what next?
I am thinking that I need to mix some cement in with the ballast to make it set. Also, maybe set some pegs in the trackbed about 6 inches apart and then lay a cement/chipping mix about an inch deep to the top of the pegs. then nail the track to the pegs and finally lay more ballast.
Any ideas/thoughts?