Hello everyone!
As is obvious there have been no updates for far too longer time! This is due to, among other things, being bitten by the road steam bug and although this will never overtake the railways it has meant that time to work on the railway has been limited and funds have gone into buying a Wilesco steam roller which has since gained many modifications and a living van.
Anyway back to the railway! Since the weather has been kind over the last few days I decided to tackle the garden.
The first job was a general tidy up of winter debris which was quickly completed and the rest of the jobs started looking a bit more manageable. As can be seen in previous pics there was a wire fence which was there to protect the railway from the dogs. (kinda like jurassic park only the dog are much worse than dinosaurs
) Anyway this needed to be replaced with something more substantial, I suggested a barbed electric fence but Mum decided that may have been a tad excessive so instead we went for a white picket fence. The old fence was removed and temporary posts added to with the new fence tied to them. The whole fence has been moved about 2’ away from the railway edge. This will become a gravel path.
With the railway again dog proof work started clearing weeds and the grass behind the fence. And with this done the railway started look really good. Along the front we worked out how the path will work around the railway and some trenches for foundation of retaining walls were dough. This brings us to roughly the stage that we are at now.
I will get some pics tomorrow if I get time. The track all needs a really good clean and I am getting some fishplates on Monday so that when I can think about permanent track laying. I am starting my GCSE exams in just over 2 weeks so the work on the railway has to fit in around that but things are looking good!
Seeing as I don’t have any pics I thought I might show of my roller to make up for it