The new Dragons Friendly Light Railway

Post by vjoneslong5040 » Thu May 09, 2013 8:58 am

Morning! Thought I would actually start posting about the construction of the new line rather than lurk around!

Some of you might have seen the previous pictures of the DFLR I have posted in the pictures section (link: ). Unfortunately, our house was on the new tram extension in Nottingham, and despite trying to put up with the disruption, it became so bad that the decision was made to move (having been prevented from leaving my house to go to work, verbally assaulted, yada yada yada..). The last trains ran at the end of March, and the whole line was lifted at the beginning of April ready for the move.

The new house has a much bigger garden (yay!). However, I'm still only renting but have permission to build a railway as long as it doesn't do too much damage and the garden reinstated as it was before.

Image
Click to see full size image

The garden is approximately 18 yards long from pond to front of summer house, about 3 times the of the old one, which means alot more mowing! :roll: So after about a week of sorting out the house, a few spare hours meant I could start surveying the line! I had already decided I wanted a ground level line, it had worked well on the previous DFLR and made scenery alot easier, though I had to admit it would be very useful to have a raised steaming area! Originally I had intended to send the railway up behind the summer house, but I decided that this wasn't feasible due to the area behind the summer house being uneven concrete and two very tight curves needed to get past the compost bins and the BBQ area (to the left of the summer house). So I decided to settle on a oval of track, round the outside of the garden (to help please the letting agent), with two stations.

Image
Click to see full size image

This is what I'm aiming to eventually end up with. The first stage is to build the oval with the two passing loops, then I'll start adding the sidings. The dotted line is stage after - I purchased a cheap bridge at Peterborough so I'm hoping to have a raised section which climbs through the flower bed over the station to cross the lawn. But I'll worry about that later!

Once I've checked the levels (the garden is surprisingly flat, one side is about 3 inches higher than the other and the greatest variation was 4 inches in one spot), last night I started construction. I don't think I could get away with laying concrete blocks over the garden (if I owned the place I would), so I'm using the floating track bed construction method. I discovered that Wickes square guttering is easily wide enough to accommodate SM32 track, so I using this to stop the ballast from spreading out. I dig a trench, level the guttering out, fill it with about half an inch of pea shingle, then float the wooden track supports, screw the track to these, and finally top up with something that is close to scale ballast (when I find some). A similar method worked on the old DFLR and was relatively okay for 2 years, and since this is probably only going to be down for the same amount of time it should work quite well. I managed to lay 6m of guttering last night, and the play a bit with the pea shingle and wood supports in one section.

Image
Click to see full size image

Sorry for the poor quality piccie, it was taken just after sunset as I started to run out of light. At the rate of progress, allowing for ringing commitments, I reckon 2 months and I might have a railway! [/img]

MDLR

Re: The new Dragons Friendly Light Railway

Post by MDLR » Thu May 09, 2013 7:40 pm

vjoneslong5040:83255 wrote:At the rate of progress, allowing for ringing commitments, I reckon 2 months and I might have a railway!
............... and then you'll invite the East Midlands Group for a garden railway meeting!

User avatar
vjoneslong5040
Trainee Fireman
Trainee Fireman
Posts: 153
Joined: Fri Feb 03, 2012 3:45 pm
Location: Nottingham

Post by vjoneslong5040 » Thu May 16, 2013 1:12 pm

Well I hope that is the general idea!

There has been progress, albeit slowly. Last Saturday in between showers and coming 2nd in the Crawford Cup I managed to get the track bed up one side of the garden and past the summer house.

Image
Click to see full size image

Image
Click to see full size image

I managed to find some more free time last night, so rounded the curve at the top and headed down to the station.

Image
Click to see full size image

I managed to get a bit more done, but didn't take any pictures as it was getting dark and I was getting very late for dinner. I did manage to take one photo of the gap thats left to be done, around 8 meters or so.

Image
Click to see full size image

Never know, might get the track bed finished tonight. :D I had planned on spending Saturday track laying, but the wife is talking about grabbing the Ecclesbourne valley railway. :roll: DOH!

User avatar
vjoneslong5040
Trainee Fireman
Trainee Fireman
Posts: 153
Joined: Fri Feb 03, 2012 3:45 pm
Location: Nottingham

Post by vjoneslong5040 » Sun May 19, 2013 12:17 am

Well not a picture update but rather a video one!

I managed to get the last of the guttering down on Thursday evening. After sorting out the old track from the previous DFLR incarnation, I started work on laying the new one. I'm down one side of the garden, around 20 yards in total. As the sun appeared late this evening I thought I'd use the opportunity to test out the DFLR's latest motive power acqusition, a Accucraft Caradoc, bought at the 16mm show. Below is a video of the first ever train movements on the new railway.

<object width="560" height="315"><param name="movie" value="http://www.youtube.com/v/flvYZFaDN38?ve ... ram><param name="allowFullScreen" value="true"></param><param name="allowscriptaccess" value="always"></param><embed src="http://www.youtube.com/v/flvYZFaDN38?version=3&hl=en_GB" type="application/x-shockwave-flash" width="560" height="315" allowscriptaccess="always" allowfullscreen="true"></embed></object>

Hopefully will find some free time this week to carry on laying track.

MDLR

Post by MDLR » Sun May 19, 2013 9:28 am

Clifton, or Wollaton?

User avatar
vjoneslong5040
Trainee Fireman
Trainee Fireman
Posts: 153
Joined: Fri Feb 03, 2012 3:45 pm
Location: Nottingham

Post by vjoneslong5040 » Mon May 20, 2013 9:51 am

No far classier! STABBO!

To be fair, I'm far happier in Stapleford than I was in Beeston. Its quieter, and seems much underrated. Plus the garden is bigger! :D

MDLR

Post by MDLR » Mon May 20, 2013 4:29 pm

When I was a lad, Clifton and Wollaton WERE posh!

jay1976

Post by jay1976 » Mon May 20, 2013 11:09 pm

The guttering method looks a good idea for me as I am also in a rented house but possibly buying it in 6months time if all goes well..

User avatar
vjoneslong5040
Trainee Fireman
Trainee Fireman
Posts: 153
Joined: Fri Feb 03, 2012 3:45 pm
Location: Nottingham

Post by vjoneslong5040 » Wed May 22, 2013 9:54 am

I think Wollaton still is, but Clifton really isn't!

The guttering seems to be working really well. The big advantage I've found is that the floating track bed allows you to jack and pack the track to cover up the inconsistencies which inevitably appear. But I'm relatively pleased with progress. Now what to do with the big pile of turf!

User avatar
vjoneslong5040
Trainee Fireman
Trainee Fireman
Posts: 153
Joined: Fri Feb 03, 2012 3:45 pm
Location: Nottingham

Post by vjoneslong5040 » Fri May 31, 2013 9:33 am

At 9:15pm on Thursday 30th May, the golden screw was laid in the final section of track that completed the DFLR's mainline. Hooray! :blob5:


Image
Click to see full size image


Image
Click to see full size image

After all the hard work surveying, I discovered that when I came to lay the last two yards of straight track between the two ends, they appeared pretty close to level (the bubble was slightly biased, but within the lines, to the eastern end).

Image
Click to see full size image

Thats what I managed last night. The photo has shown up a couple of wiggles, which I will have a play with this evening. The intention tonight and tomorrow (I have a free weekend, thats positively shocking!) is work on the two stations, Much Camping, and Moggerhanger (Low Level). I'll take some better pics as well over the weekend, and who knows, maybe a engine will make an appearance!

Narrow Minded

Post by Narrow Minded » Fri May 31, 2013 9:56 am

Congratulations! :D
Always nice to "finish a phase", and yes, let's see something running now :thumbleft:

EDIT: I've just checked the diary and we're gigging 'local' on saturday with sunday OFF! My first (almost) free weekend for ages too :D

MDLR

Post by MDLR » Fri May 31, 2013 12:28 pm

Narrow Minded:84088 wrote:I've just checked the diary and we're gigging 'local' on Saturday with Sunday OFF! My first (almost) free weekend for ages too :D
Does this mean we might get to see the Railbus at Butterley on Sunday?

Narrow Minded

Post by Narrow Minded » Fri May 31, 2013 1:48 pm

"might" is the operative word - certainly will if it's finished :D

User avatar
Dr. Bond of the DVLR
Retired Director
Retired Director
Posts: 4516
Joined: Tue Jun 09, 2009 9:43 pm
Location: Suffolk
Contact:

Post by Dr. Bond of the DVLR » Fri May 31, 2013 9:13 pm

Well done! I hope plenty of pictures were taken to look back on. If I've any regrets its that I didn't take enough photos of various railway things and some things have been lost to history.
Image
The railway which people forgot
(to build)

User avatar
vjoneslong5040
Trainee Fireman
Trainee Fireman
Posts: 153
Joined: Fri Feb 03, 2012 3:45 pm
Location: Nottingham

Post by vjoneslong5040 » Wed Jul 17, 2013 1:34 pm

Well I managed to complete the loop of track in the first weekend in June, and to celebrate, I spent the afternoon running all the engines. Of course, the official excuse was gauging trials..... ;)

I took some video and pictures, but I haven't had time to do anything with them till now. Enjoy!

<object width="560" height="315"><param name="movie" value="//www.youtube.com/v/XZsAfi6bGEs?hl=en_GB& ... ram><param name="allowFullScreen" value="true"></param><param name="allowscriptaccess" value="always"></param><embed src="//www.youtube.com/v/XZsAfi6bGEs?hl=en_GB&version=3" type="application/x-shockwave-flash" width="560" height="315" allowscriptaccess="always" allowfullscreen="true"></embed></object>

Since then the odd engine has made it round, and a little bit of ballasting has taken place, but not much else has happened. This weekend has now freed itself and it would be a shame to waste it. First I have to ease some of those curves....

User avatar
vjoneslong5040
Trainee Fireman
Trainee Fireman
Posts: 153
Joined: Fri Feb 03, 2012 3:45 pm
Location: Nottingham

Post by vjoneslong5040 » Thu Aug 15, 2013 1:46 pm

Well not much progress has been made on the railway as PhD work takes up more and more time. But I have been working on the first building for the line, and perhaps the most important. The pub!


Image
Click to see full size image

Its in the middle of varnishing. I've also got to finish painting the guttering and make some lead flashing for the roof. I was pondering about frosting the glazing for the lower part to avoid making some hint of interior, any suggestions for doing this would be most welcome!

User avatar
vjoneslong5040
Trainee Fireman
Trainee Fireman
Posts: 153
Joined: Fri Feb 03, 2012 3:45 pm
Location: Nottingham

Post by vjoneslong5040 » Fri Sep 06, 2013 9:48 am

Well modelling time has been limited lately, but this week gave me lots of free evenings, so trains were running along with some workshop time. I spent last weekend relaying one curve where the curves were a little tight for comfort and one end had sunk giving a annoying gradient. But last night saw the completion of the new bogie van for the railway, vehicle no 48.

Image


Image

I'm not sure I've got the weathering entirely correct. Its a mixture of using enamel paints (the brush liberally wiped on some kitchen towel before application to the wagon) and some weathering powder I bought at half price from the modelzone closing down sale. I left the paint to dry for 24 hours and then it will receive several coats of matt varnish, mostly to protect the transfers.

But there was still time to run a few trains. Sophie the Caradoc put in a sterling service on the evening freight. Countess was eventually declared a failure after I realised all 4 (yes all 4) of the fibre washers on the cab fittings had either split or failed, filling the cab with steam. Doh!


Image


Image