Well, today construction officially commenced of yet another railway! This one will be in my Dad's garden, he is currently doing it up (hence the large pile of bark and the bare flower beds) Again, this railway will be built on a tight budget. I was donated 10 lengths of 10 feet rails and two panels of mouldy old track. I have also been donated a sack of sleepers to get started and some screws for attaching the rail to the track. Today I assembled one track panel with the donated sleepers and screws and rails. Sleeper Spacing is every 6 inches giving 20 sleepers per 10 foot length. The the straight mouldy old panel was seen to next, the most rotten sleepers removed then the rest re positioned at 6 inch spacings, some new sleepers were required on this one. I have also been creating some new sleepers from pressure treated fence posts cut down to 1"x1.5"x10" on various saws. These will be drilled up for the screws on a jig. Anyway, pics...
The brand new section of track

The mouldy old curve

Some of the mouldy old sleepers

The route...

From by the hose along the rails...
down past where all that bark is, past the shed

Then round the corner

There will be approx 65 feet of track by the end. Oh and the best bit...
Hasn't cost me a peny!