The WDLR extension
- steamgeorge
- Trainee Fireman

- Posts: 142
- Joined: Mon Sep 18, 2017 9:31 am
- Location: Oxforshire, UK
- Contact:
The WDLR extension
I've been very busy in the garden over the past six months. I caught the Garden Railway bug badly over the winter and decided it would be a good idea to spend all my cash on blocks, sand, cement and track!
The Ffestiniog has influenced the line greatly, so I plan for most of the railway to run on a dry-stone structure that twists and drops to accommodate the landscape. The current setup has always felt to me as though it was missing the drama of some serious civil engineering, so I decided to include an interpretation of Cei Mawr — the 60-foot-high stone embankment. https://www.festipedia.org.uk/wiki/Cei_Mawr
Here is my attempt, nearly complete: I've always liked the view from the back of the garden, so I thought I would extend the railway in a way that capitalises on it. Here is a recent sunset:
More to come!!
The Ffestiniog has influenced the line greatly, so I plan for most of the railway to run on a dry-stone structure that twists and drops to accommodate the landscape. The current setup has always felt to me as though it was missing the drama of some serious civil engineering, so I decided to include an interpretation of Cei Mawr — the 60-foot-high stone embankment. https://www.festipedia.org.uk/wiki/Cei_Mawr
Here is my attempt, nearly complete: I've always liked the view from the back of the garden, so I thought I would extend the railway in a way that capitalises on it. Here is a recent sunset:
More to come!!
- LNR
- Driver

- Posts: 1892
- Joined: Sat Feb 27, 2016 5:26 am
- Location: Melbourne, Australia
Re: The WDLR extension
I can see many pics being taken in the location of that first shot, just perfect with the sky as a background.
Grant.
Grant.
- Allu
- Cleaner

- Posts: 82
- Joined: Wed Feb 25, 2026 2:53 pm
- Location: Finland
Re: The WDLR extension
Really nice! Beautiful atmosphere! Excellent example of how natural background can be used to create really life-like scenes 
Cheers,
Allu
Allu
- ge_rik
- Administrator

- Posts: 7992
- Joined: Sun Oct 25, 2009 10:20 pm
- Location: Cheshire
- Contact:
Re: The WDLR extension
Red sky at night
Modellers' delight
Rik
Modellers' delight
Rik
- steamgeorge
- Trainee Fireman

- Posts: 142
- Joined: Mon Sep 18, 2017 9:31 am
- Location: Oxforshire, UK
- Contact:
Re: The WDLR extension
Thank you all!
The first challenge was to tame the jungle that had been left to grow for years.
Here is the site - a lot of bramble roots: A Mess was made. Aerosols were useful for marking out. The Mud got worse. Digging is not that much fun. More to come!!
The first challenge was to tame the jungle that had been left to grow for years.
Here is the site - a lot of bramble roots: A Mess was made. Aerosols were useful for marking out. The Mud got worse. Digging is not that much fun. More to come!!
- ge_rik
- Administrator

- Posts: 7992
- Joined: Sun Oct 25, 2009 10:20 pm
- Location: Cheshire
- Contact:
Re: The WDLR extension
Excellent. Love seeing terraforming in process.
Rik
- steamgeorge
- Trainee Fireman

- Posts: 142
- Joined: Mon Sep 18, 2017 9:31 am
- Location: Oxforshire, UK
- Contact:
Re: The WDLR extension
Good news for you Rik there is a lot of terraforming.
Having made a start behind the shed, I turned my attention to the first section that would connect to the existing railway.
I proudly cut a hole in the shed. The Oak sleeper will carry the track bed. There will be a removable bridge for the shed door. The blocks here will sit on the existing hardcore foundation from the gravel path. As it gets dark here by 4 pm in February, most of the work had to be carried out after hours by candlelight.
Stakes were used to get the 1:37. Point in.
It was a shame to remove the moss - hopefully it will grow back once ballasted. stay tuned...
Having made a start behind the shed, I turned my attention to the first section that would connect to the existing railway.
I proudly cut a hole in the shed. The Oak sleeper will carry the track bed. There will be a removable bridge for the shed door. The blocks here will sit on the existing hardcore foundation from the gravel path. As it gets dark here by 4 pm in February, most of the work had to be carried out after hours by candlelight.
Stakes were used to get the 1:37. Point in.
It was a shame to remove the moss - hopefully it will grow back once ballasted. stay tuned...
Who is online
Users browsing this forum: No registered users and 16 guests