Crossing a footpath at ground level

Post by Kubes » Thu Apr 30, 2026 2:48 pm

Hi
I am helping a friend build his garden line. The track has to cross a path at one point and the plan is to bury the Peco SM32 track in cement like a level crossing. I've seen some photos on this site which utilise continuous checkrails. Can this be done with Peco? If so any tips? If not, has anyone any suggestions how to create a robust and reliable crossing?
Thanks
Kubes
Kubes

User avatar
SimonWood
Trainee Driver
Trainee Driver
Posts: 786
Joined: Tue Apr 07, 2015 9:46 pm
Location: West Wales
Contact:

Re: Crossing a footpath at ground level

Post by SimonWood » Thu Apr 30, 2026 3:34 pm

Trevor Thompson has a very robust system using aluminium angle embedded in the concrete. I have seen it in action, and while it does not have checkrails, it allows both humans and trains to cross easily. It would have to be straight and I imagine getting the rails that join to it lined up correctly must be important - but I'm sure Trevor can provide more first hand detail!
Rheilffordd Moel Rhos: blog - photos - videos

User avatar
philipy
Moderator
Moderator
Posts: 5935
Joined: Sun Jan 30, 2011 3:00 pm
Location: South Northants

Re: Crossing a footpath at ground level

Post by philipy » Thu Apr 30, 2026 3:36 pm

Can it be done? Simple answer, Yes!

I have two Peco track level crossings buried in cement as you suggest, and one has been down for about 12 years and the other about 10 years. Over time they have taken loaded wheelbarrows, the mower, a freezer on a trolley and countless feet. They are looking a wee bit sad atm, but that is mainly due to our clay soil heaving and generally doing it's own thing moving the adjacent slabs, the track bases are still solid and aligned.
Construction was pretty straightforward. Standard Peco 32mm track screwed down to the concrete base then checkrail chairs glued on as necessary, then pack some card strips into the flangeways to keep the cement out then tamp down your concrete. I did press some ballast into the top surface, but most of that has disappeared over the years. When it is solid but still 'green' pull the packers out and carefully clear out anything that has got in anyway!
IMG_0236.jpg
IMG_0236.jpg (438.55 KiB) Viewed 5 times
IMG_0237.jpg
IMG_0237.jpg (362.91 KiB) Viewed 5 times
Philip