just thought i would bring this up to date.
i have track down, 19yds of it.
all i need to do now is to buy half a sheet of ply to make the bridge, lay the track on it.
lay the track on the next set of boards.
dig the cutting for the station (not having the tunnel now) and lay the concrete for the station rail bed and platform.
grind out the slab for the crossing and lay the track in then fill the edges with concrete.
in the platform, im planning on having 3 roads, so i can have 2 trains in the platform and a run-round loop.
i have some pics so will put up as soon as.
also, edrig is out of action as he is undergoing MAJOR surjery.
i have track down, 19yds of it.
all i need to do now is to buy half a sheet of ply to make the bridge, lay the track on it.
lay the track on the next set of boards.
dig the cutting for the station (not having the tunnel now) and lay the concrete for the station rail bed and platform.
grind out the slab for the crossing and lay the track in then fill the edges with concrete.
in the platform, im planning on having 3 roads, so i can have 2 trains in the platform and a run-round loop.
i have some pics so will put up as soon as.