Re: The Ridgemont Hills Light Railway

Post by ace » Wed Aug 21, 2019 12:11 am

Peter Butler wrote: Tue Aug 20, 2019 9:39 pm Good progress Ace and substantial supports which should last many years. I'm intrigued why you need the ladder, it's clearly a tool used in the construction as it keeps moving about! My guess is that it is to keep the post tops level?
Hopefully that’s the plan Peter. The ladder is only there because I’d fixed a couple of slipped slates on the roof of the out building, with looming bad weather I thought it be wise. ;)
YouTube ChannelImage

User avatar
FWLR
Driver
Driver
Posts: 4245
Joined: Sat Aug 05, 2017 9:45 am
Location: Preston, Lancashire, UK

Re: The Ridgemont Hills Light Railway

Post by FWLR » Wed Aug 21, 2019 7:22 am

It's coming along nicely there Ace. Soon be getting the track laid and some locos running before the bad weather comes and most of us can't run anything....

DonW
Fireman
Fireman
Posts: 261
Joined: Mon Jul 22, 2019 12:57 pm
Location: West Somerset

Re: The Ridgemont Hills Light Railway

Post by DonW » Wed Aug 21, 2019 1:40 pm

Wow that is a lot of progress. You have certainly got a move on. As Peter says pretty substantial.

Don

User avatar
ace
Fireman
Fireman
Posts: 294
Joined: Sun Jul 14, 2013 9:03 am

Re: The Ridgemont Hills Light Railway

Post by ace » Wed Aug 28, 2019 12:11 am

FWLR wrote: Wed Aug 21, 2019 7:22 am It's coming along nicely there Ace. Soon be getting the track laid and some locos running before the bad weather comes and most of us can't run anything....
Thanks, I am holding off of the track laying part of the project. I know once I have rails down I'll end up playing with it... :roll:
DonW wrote: Wed Aug 21, 2019 1:40 pm Wow that is a lot of progress. You have certainly got a move on. As Peter says pretty substantial.

Don
Thanks Don, The ground works are just donated and previously bought items that I had to think of a way of using them the most economically. I have had to buy some additional T&G and fence rails to complete some of it though.

I'll pop another update up tomorrow eve.
YouTube ChannelImage

User avatar
ace
Fireman
Fireman
Posts: 294
Joined: Sun Jul 14, 2013 9:03 am

Re: The Ridgemont Hills Light Railway

Post by ace » Thu Aug 29, 2019 10:48 pm

Update

With the bad weather coming it was time to get some protection on the parts of the baseboard that were not made of a 'marine' type of wood. I treated the timber with some creosote substitute and covered with roof felt. A little bit of thinking and research went into the next part...

The joins were sealed together with some roof felt glue/sealer so as to offer the most protection possible.

Image

Image

Image

Image

Some UPVC edging strip was purchased so that ballast could be ran from edge to edge if need be. I bought white because from my supplier it was four times more expensive to buy black! I had a tin of satin black paint I used to change the colour.

Image

A small but subtle difference...

Image

That continued onto the other side....

Image

Next was to build the other corner using the same method and radius as the first...

Image

My trusty little furry friend checking my work after covering with felt.

Image

And for now that is all...
YouTube ChannelImage

DonW
Fireman
Fireman
Posts: 261
Joined: Mon Jul 22, 2019 12:57 pm
Location: West Somerset

Re: The Ridgemont Hills Light Railway

Post by DonW » Thu Aug 29, 2019 11:03 pm

You really are cracking on with this very good progress.

Don

User avatar
ace
Fireman
Fireman
Posts: 294
Joined: Sun Jul 14, 2013 9:03 am

Re: The Ridgemont Hills Light Railway

Post by ace » Fri Mar 26, 2021 12:11 am

Thank you for the positive comments.

It has been a little while since I updated. 2020 didn't really give me much in the way of inspiration to actually do much to the railway, but I did get quite far in 2019, here are some progress pictures.

Update

With the easier work now completed, and the height now set by the garden wall, it was now time to plough into the soil and get the hard work started. I knew that it would need to get into the ground somewhat but I really wasn't ready for quite how deep I was going to have to go....

First earthworks, nice and easy. Stared with a small bank that disappeared behind the garden shrubs.

Image

Image

Image

Image

This was slow work and decidedly difficult due to the depth of the resulting cutting.

Image

It was decided that a tunnel was needed as the cutting was getting ridiculously deep. Another feature I hadn't initially planned for.

This was starting at the opposite end to give myself and Dad a break...

Image

Site of the tunnel.

Image

Overview from above of current progress.

Image
YouTube ChannelImage

User avatar
philipy
Moderator
Moderator
Posts: 5000
Joined: Sun Jan 30, 2011 3:00 pm
Location: South Northants

Re: The Ridgemont Hills Light Railway

Post by philipy » Fri Mar 26, 2021 7:15 am

That is all very impressive and will look fantastic when you've finished.

The two related things that bother me are the apparent length of the tunnel, and drainage in the cutting and tunnel. If you get a derailment in the tunnel ( and you know what Sods Law says!), or winter debris build up of leaves etc, it will be extremely difficult to do anything about it.
Then unless you put a 'crown' on the level trackbed so that water runs back out to the end of the cutting, I can see a very long thin puddle every time it rains.

You've probably already thought about it and if so, I'm sorry if I'm teaching granny to suck eggs. :oops:
Philip

User avatar
ace
Fireman
Fireman
Posts: 294
Joined: Sun Jul 14, 2013 9:03 am

Re: The Ridgemont Hills Light Railway

Post by ace » Mon Mar 29, 2021 9:55 pm

philipy wrote: Fri Mar 26, 2021 7:15 am That is all very impressive and will look fantastic when you've finished.

The two related things that bother me are the apparent length of the tunnel, and drainage in the cutting and tunnel. If you get a derailment in the tunnel ( and you know what Sods Law says!), or winter debris build up of leaves etc, it will be extremely difficult to do anything about it.
Then unless you put a 'crown' on the level trackbed so that water runs back out to the end of the cutting, I can see a very long thin puddle every time it rains.

You've probably already thought about it and if so, I'm sorry if I'm teaching granny to suck eggs. :oops:

The tunnel is approximately 6' and it will have access hatch(es) from above - the track is straight and the most level part of the railway so I shouldn't have much problem. At the point of building I did not know how I was going to build the tunnel, but I shall post about it in due course. At the time of building I did not know how well the soil drained but I thought to myself that the cutting is level-ish and the water would never get particularly deep because it would run out of either end. However, this past winter proved to me that flooding was not an issue.

Update

The trenches continue. The most odd thing I have found whilst digging is some bones! They look like a horses hock, pedal bone, and hoof sole. I assume there is a pony/ horse below my lawn!

Image

Skeletons aside, the trenches have gone well.

Site of the tunnel

Image

Image

Laying some blocks. I have to say I owe the entire layout level to the amazing laser level. How one could be seriously accurate before is anyone guess! That tool makes this 'idiot proof' of which suits me.

Image

Image

and the tunnel base

Image

And finally the blocks are laid. Over the entire layout length of 95 yards, I only ended up being 4mm out. Not bad considering really!

Image
YouTube ChannelImage

User avatar
Peter Butler
Driver
Driver
Posts: 5217
Joined: Sun Sep 09, 2012 10:33 pm
Location: West Wales

Re: The Ridgemont Hills Light Railway

Post by Peter Butler » Mon Mar 29, 2021 10:52 pm

Great progress Ace, you could have a feature to commemorate your pony/horse find?
The best things in life are free.... so why am I doing this?

User avatar
ge_rik
Administrator
Administrator
Posts: 6477
Joined: Sun Oct 25, 2009 10:20 pm
Location: Cheshire
Contact:

Re: The Ridgemont Hills Light Railway

Post by ge_rik » Mon Jan 03, 2022 12:16 pm

I was just going through some of my unread posts and was wondering how this project is progressing. Presumably things will have advanced since last March. It does look like a really exciting project.

Unless, of course, the bones turned out to be something more sinister ..... :shock:

Rik
------------------------