Ringbalin Light Railway

A place for the discussion of garden railways and any garden style/scale portable and/or indoor layouts
User avatar
GAP
Trainee Driver
Trainee Driver
Posts: 684
Joined: Sun Dec 23, 2012 10:34 pm
Location: Bundaberg QLD Australia
Contact:

Re: Ringbalin Light Railway

Post by GAP » Mon Mar 30, 2020 7:55 am

ge_rik wrote: Sun Mar 29, 2020 10:50 pm There's a link to two downloadable .pdf documents on the site. One is all about concrete rock making and the other, by coincidence, is about trestles.....
http://tjstrains.com/request-pdfs/

Rik
Rik
Your timing is impeccable only this morning I bought a bag of acrylic render to try on the area if I can do half as good a job as those pictures I will very happy.
Graeme
From the home of the Ringbalin Light Railway
https://ringbalin-light-railway.blogspo ... -page.html

User avatar
GAP
Trainee Driver
Trainee Driver
Posts: 684
Joined: Sun Dec 23, 2012 10:34 pm
Location: Bundaberg QLD Australia
Contact:

Re: Ringbalin Light Railway

Post by GAP » Mon Apr 06, 2020 9:41 am

I have reached a point where I can call Stage1 complete.
The track has been laid and the line across the high trestle (my biggest worry) has been tested, my largest locos and a train have been run across it, both forward and backwards with no problems at all.
P1050580.JPG
P1050580.JPG (157.33 KiB) Viewed 13137 times
P1050584.JPG
P1050584.JPG (177.2 KiB) Viewed 13137 times
The low trestle has been tested as well and no issues presented themselves, looks like my pedantic attention to both trestle constructions has paid off.
P1050587.JPG
P1050587.JPG (170.39 KiB) Viewed 13137 times
Meanwhile a drama has unfolded between the trestles.
Drama under the trestle.JPG
Drama under the trestle.JPG (177.07 KiB) Viewed 13137 times
Skippy looks on at the unfolding drama.
Skippy watches on.JPG
Skippy watches on.JPG (142.34 KiB) Viewed 13137 times

Blog will be updated in due course.
Graeme
From the home of the Ringbalin Light Railway
https://ringbalin-light-railway.blogspo ... -page.html

User avatar
Andrew
Moderator
Moderator
Posts: 3247
Joined: Tue Jul 03, 2012 1:33 pm
Location: Bristol, UK
Contact:

Re: Ringbalin Light Railway

Post by Andrew » Mon Apr 06, 2020 1:06 pm

That's shaping up very nicely, and at an impressive pace too, well done! The two trestles look great, especially once they've got a train on them...

Andrew.

User avatar
GAP
Trainee Driver
Trainee Driver
Posts: 684
Joined: Sun Dec 23, 2012 10:34 pm
Location: Bundaberg QLD Australia
Contact:

Re: Ringbalin Light Railway

Post by GAP » Tue Apr 07, 2020 7:04 am

I have now updated my Blog so it reflects the work from the start to the completion of Stage 1
https://ringbalin-light-railway.blogspo ... -page.html

Edit;
I used my lock down time to re organise the presentation a bit better by grouping the older posts under 2 new tabs of G and HO Construction Logs which consist of sub headings of Stage1,2 etc plus a brief explanation of where the construction is headed. This will hopefully will make it more user friendly.
I intend to only have a maximum of 5 posts under the G and HO posts tabs so they will be the latest ones; a type of "What's new" feature.

Please have a look and comment if you wish.
Graeme
From the home of the Ringbalin Light Railway
https://ringbalin-light-railway.blogspo ... -page.html

User avatar
GAP
Trainee Driver
Trainee Driver
Posts: 684
Joined: Sun Dec 23, 2012 10:34 pm
Location: Bundaberg QLD Australia
Contact:

Re: Ringbalin Light Railway

Post by GAP » Sat May 02, 2020 11:39 pm

Stage 2 has begun it involves bringing the 2 tracks around a series of curves to run across the yard into the "town area.
As there are no fence posts to attach to I have had to cut my own and concrete them in, they are made of galvanized "C" purlin (used to build sheds etc).
I have also used a piece of lattice screening that was on my back deck before it was renovated, it provides a finished edge to the railway when it is viewed from the house. As my wife likes Coleus plants and the lattice provides a shady spot that is what will be planted there thus giving area the name of 'Coleus Corner'.
Pictures of progress so far.
P1050671.JPG
P1050671.JPG (188.29 KiB) Viewed 13028 times
P1050670.JPG
P1050670.JPG (203.61 KiB) Viewed 13028 times
P1050669.JPG
P1050669.JPG (188.93 KiB) Viewed 13028 times
Access to inside the loop will be via a lift up bridge hinged at one end.

In the centre of the layout design of a garden area has begun.
SWMBO wanted a firepit but we could not decide where to put one then I had a flash of brilliance and suggested we put it inside the railway that way we could sit by the fire in winter and watch a train or 2 trundle around.
Now this project has snowballed to me laying "Cracker Dust" (made of crushed rock which when mixed with cement acts like concrete) paths following the track and planting out and mulching the area so I do not have to mow grass inside the loop.
Picture shows the firepit in place, there will be another circle constructed and filled with "Cracker Dust", this thing could end up bigger than Stonehenge.
P1050668.JPG
P1050668.JPG (203.27 KiB) Viewed 13028 times
Graeme
From the home of the Ringbalin Light Railway
https://ringbalin-light-railway.blogspo ... -page.html

User avatar
ge_rik
Administrator
Administrator
Posts: 6477
Joined: Sun Oct 25, 2009 10:20 pm
Location: Cheshire
Contact:

Re: Ringbalin Light Railway

Post by ge_rik » Sun May 03, 2020 7:42 am

GAP wrote: Tue Apr 07, 2020 7:04 am Please have a look and comment if you wish.
Hi Graeme
I like the new layout of the blog.

Some of the photos seem to have disappeared though, especially under the latest posts tab
Screenshot_2020-05-03-07-43-41-744.jpeg
Screenshot_2020-05-03-07-43-41-744.jpeg (285.87 KiB) Viewed 12919 times
Rik
------------------------
Peckforton Light Railway - Blog Facebook Youtube

User avatar
GAP
Trainee Driver
Trainee Driver
Posts: 684
Joined: Sun Dec 23, 2012 10:34 pm
Location: Bundaberg QLD Australia
Contact:

Re: Ringbalin Light Railway

Post by GAP » Sun May 03, 2020 10:35 pm

ge_rik wrote: Sun May 03, 2020 7:42 am
GAP wrote: Tue Apr 07, 2020 7:04 am Please have a look and comment if you wish.
Hi Graeme
I like the new layout of the blog.

Some of the photos seem to have disappeared though, especially under the latest posts tab
Screenshot_2020-05-03-07-43-41-744.jpeg

Rik
Thanks Rik, I separated the G and HO blogs (actually created a new one for the HO) as they were becoming to unwieldly.
I haven't looked at either for a while so I'll go back and try and see what happened.
Graeme
From the home of the Ringbalin Light Railway
https://ringbalin-light-railway.blogspo ... -page.html

User avatar
GAP
Trainee Driver
Trainee Driver
Posts: 684
Joined: Sun Dec 23, 2012 10:34 pm
Location: Bundaberg QLD Australia
Contact:

Re: Ringbalin Light Railway

Post by GAP » Mon May 04, 2020 2:47 am

I have updated my blog by putting the missing pictures back on and a description of the start of Stage 2.

As I have two layouts a G and a HO I have created a second blog dedicated to my HO as I was finding that only one blog was becoming to cumbersome to manage.

The G Blog https://ringbalin-light-railway.blogspo ... -page.html

The HO blog https://ringbalin.blogspot.com/p/about-railway.html
Graeme
From the home of the Ringbalin Light Railway
https://ringbalin-light-railway.blogspo ... -page.html

User avatar
ge_rik
Administrator
Administrator
Posts: 6477
Joined: Sun Oct 25, 2009 10:20 pm
Location: Cheshire
Contact:

Re: Ringbalin Light Railway

Post by ge_rik » Mon May 04, 2020 8:21 am

Both seem to be fine now.
Both blogs looking good. I think the structure now works well. Your construction logs are a bit like my progress reports.

Glad you manage to find time for your H0 layout. I can't remember the last time I did anything on my indoor 00 railway....

Rik
------------------------
Peckforton Light Railway - Blog Facebook Youtube

User avatar
tom_tom_go
Driver
Driver
Posts: 4824
Joined: Wed Feb 23, 2011 3:08 am
Location: Kent, UK
Contact:

Re: Ringbalin Light Railway

Post by tom_tom_go » Mon May 04, 2020 10:35 am

I like the firepit. I have a one that I use on my patio and it is very relaxing watching the flames lick the firewood on a summers evening.

User avatar
GAP
Trainee Driver
Trainee Driver
Posts: 684
Joined: Sun Dec 23, 2012 10:34 pm
Location: Bundaberg QLD Australia
Contact:

Re: Ringbalin Light Railway

Post by GAP » Mon May 04, 2020 9:34 pm

tom_tom_go wrote: Mon May 04, 2020 10:35 am I like the firepit. I have a one that I use on my patio and it is very relaxing watching the flames lick the firewood on a summers evening.
The firepit and it surrounding landscaping when finished will be bigger than Stonehenge if SWMBO has her way.
Graeme
From the home of the Ringbalin Light Railway
https://ringbalin-light-railway.blogspo ... -page.html

User avatar
GAP
Trainee Driver
Trainee Driver
Posts: 684
Joined: Sun Dec 23, 2012 10:34 pm
Location: Bundaberg QLD Australia
Contact:

Re: Ringbalin Light Railway

Post by GAP » Mon May 04, 2020 9:38 pm

ge_rik wrote: Mon May 04, 2020 8:21 am Both seem to be fine now.
Both blogs looking good. I think the structure now works well. Your construction logs are a bit like my progress reports.

Glad you manage to find time for your H0 layout. I can't remember the last time I did anything on my indoor 00 railway....

Rik
I had to go through both blogs from top to bottom to correct not only the missing pictures but the owners mistakes with the links to the construction logs.
I put a link back to "construction Logs" at the bottom of each post so that people viewing can go straight back there without having to scroll back to the top to get to the tab.

The HO has had a bit of extra work done on it but I haven't done anything on the blog, been distracted with the G construction plus a couple of loco build projects.
Graeme
From the home of the Ringbalin Light Railway
https://ringbalin-light-railway.blogspo ... -page.html

User avatar
GAP
Trainee Driver
Trainee Driver
Posts: 684
Joined: Sun Dec 23, 2012 10:34 pm
Location: Bundaberg QLD Australia
Contact:

Re: Ringbalin Light Railway

Post by GAP » Mon May 18, 2020 6:30 am

I have built the opening for the lift up bridge so that will be the next project under taken.
P1050731.JPG
P1050731.JPG (190.5 KiB) Viewed 12746 times
I also did a bit of landscaping around the railway and the firepit area.
I now have the edges of pathways that will follow the track boards so that I can follow a train right round the layout with out walking over garden beds.
I intend to landscape, with mulch and bushes, the whole inside loop area so as to eliminate mowing.
P1050732.JPG
P1050732.JPG (130.22 KiB) Viewed 12746 times
P1050733.JPG
P1050733.JPG (134.13 KiB) Viewed 12746 times
More pictures and a description are on my blog
https://ringbalin-light-railway.blogspo ... -page.html
Graeme
From the home of the Ringbalin Light Railway
https://ringbalin-light-railway.blogspo ... -page.html

User avatar
GAP
Trainee Driver
Trainee Driver
Posts: 684
Joined: Sun Dec 23, 2012 10:34 pm
Location: Bundaberg QLD Australia
Contact:

Re: Ringbalin Light Railway

Post by GAP » Fri Jun 12, 2020 8:05 am

Some progress on the layout.
Half the lift up bridge is finished.
The opening end rails will be held in place by "Hillmans" lift out bridge clamps.
To keep the rail alignment at the opening end I soldered a brass plate under the rails which holds them at the correct gauge. (the melted sleeper will be replaced)
Lift up bridge lengthwise.jpg
Lift up bridge lengthwise.jpg (81.65 KiB) Viewed 12640 times
Hinge and deck fitted.jpg
Hinge and deck fitted.jpg (126 KiB) Viewed 12640 times
Hillmans Bridge Clamps.jpg
Hillmans Bridge Clamps.jpg (109.4 KiB) Viewed 12640 times
Gauge plate on bridge end.jpg
Gauge plate on bridge end.jpg (116.7 KiB) Viewed 12640 times
The baseboards across the yard have been installed, so Stage 2 is nearing completion.
Across the gap and beyond.jpg
Across the gap and beyond.jpg (136.07 KiB) Viewed 12640 times
Across the yard part 2.jpg
Across the yard part 2.jpg (171.33 KiB) Viewed 12641 times
Blog has be updated with more pictures and description.

https://ringbalin-light-railway.blogspo ... -page.html
Last edited by GAP on Sat Jun 13, 2020 5:58 am, edited 1 time in total.
Graeme
From the home of the Ringbalin Light Railway
https://ringbalin-light-railway.blogspo ... -page.html

User avatar
GAP
Trainee Driver
Trainee Driver
Posts: 684
Joined: Sun Dec 23, 2012 10:34 pm
Location: Bundaberg QLD Australia
Contact:

Re: Ringbalin Light Railway

Post by GAP » Sat Jun 13, 2020 4:40 am

Been a busy morning the second bridge deck has now been completed just a bit of tweeking to do and then its on to building the joining beams so that they become one structure.
Finished just before rain washed out play for the day.
Twin Decks from hinge side.jpg
Twin Decks from hinge side.jpg (165.39 KiB) Viewed 12610 times
Twin Decks Lengthwise.jpg
Twin Decks Lengthwise.jpg (171.9 KiB) Viewed 12610 times
Twin Decks Side View.jpg
Twin Decks Side View.jpg (169.06 KiB) Viewed 12610 times
With the final completion of the bridge Stage 2 of the Layout will called as finished and work will start on Stage 3 which involves building a spiral to take the outer loop back up to its original level.

Blog has be updated with more pictures and description.
https://ringbalin-light-railway.blogspo ... -page.html
Graeme
From the home of the Ringbalin Light Railway
https://ringbalin-light-railway.blogspo ... -page.html

User avatar
GAP
Trainee Driver
Trainee Driver
Posts: 684
Joined: Sun Dec 23, 2012 10:34 pm
Location: Bundaberg QLD Australia
Contact:

Re: Ringbalin Light Railway

Post by GAP » Thu Jul 09, 2020 3:52 am

The framework for Stage 3 has been finished and the baseboards for the Lower Loop running through Stage 3 have been installed, this now allows me to lay track to complete the Lower Loop so I can run a train continuously.
Once they are painted track laying can commence.
Stage3 baseboard toward back fence.JPG
Stage3 baseboard toward back fence.JPG (97.28 KiB) Viewed 12278 times
Stage 3 baseboards toward side fence.JPG
Stage 3 baseboards toward side fence.JPG (93.81 KiB) Viewed 12278 times
Stage 3 baseboards toward back corner.JPG
Stage 3 baseboards toward back corner.JPG (91.91 KiB) Viewed 12278 times
My blog has been updated to
https://ringbalin-light-railway.blogspo ... st%20Posts
Graeme
From the home of the Ringbalin Light Railway
https://ringbalin-light-railway.blogspo ... -page.html

User avatar
Jimmyb
Fireman
Fireman
Posts: 492
Joined: Sat Nov 23, 2019 10:43 pm
Location: Weston-super-Mare

Re: Ringbalin Light Railway

Post by Jimmyb » Thu Jul 09, 2020 8:15 am

Graham, very impressive.

User avatar
GAP
Trainee Driver
Trainee Driver
Posts: 684
Joined: Sun Dec 23, 2012 10:34 pm
Location: Bundaberg QLD Australia
Contact:

Re: Ringbalin Light Railway

Post by GAP » Thu Jul 09, 2020 8:32 am

Jimmyb wrote: Thu Jul 09, 2020 8:15 am Graham, very impressive.
Thanks Jimmy,
There is still some more to be done to finish the upper level loop.
An idea I have is for a peninsula coming off the centre of the lower loop which will have a sugar mill to act as the focal point of the whole layout.
Time will tell if that comes to fruition just want to get both the loops running first.
Graeme
From the home of the Ringbalin Light Railway
https://ringbalin-light-railway.blogspo ... -page.html

User avatar
Peter Butler
Driver
Driver
Posts: 5217
Joined: Sun Sep 09, 2012 10:33 pm
Location: West Wales

Re: Ringbalin Light Railway

Post by Peter Butler » Thu Jul 09, 2020 10:23 am

That is one serious structure there.... even after the earthquake you will still have shelter!
The best things in life are free.... so why am I doing this?

User avatar
ge_rik
Administrator
Administrator
Posts: 6477
Joined: Sun Oct 25, 2009 10:20 pm
Location: Cheshire
Contact:

Re: Ringbalin Light Railway

Post by ge_rik » Thu Jul 09, 2020 1:28 pm

Wow! That's some serious engineering, Graham. will the upper track descend to join the lower one before the lift-up bridge?

Rik
------------------------
Peckforton Light Railway - Blog Facebook Youtube

Post Reply

Who is online

Users browsing this forum: No registered users and 1 guest