Page 11 of 49

Re: The Potters Orchid Railway

Posted: Tue Sep 17, 2019 10:43 pm
by Hydrostatic Dazza
It has been awhile since the staff have devoted some time to the POR, due to them being involved at the Gympie Rattler. They go off and drive and fire steam locos at Gympie most weekends and have neglected their duties at the POR.

Image

However recently some labour hours have been directed to the signal and telegraph workshops and some progress has been observed on the signals for the Orchid look section of the POR.

Image

Re: The Potters Orchid Railway

Posted: Wed Sep 18, 2019 5:25 pm
by DonW
I shall be interested in seeing how you do these.

Don

Re: The Potters Orchid Railway

Posted: Wed Sep 18, 2019 11:42 pm
by Hydrostatic Dazza
DonW wrote: Wed Sep 18, 2019 5:25 pm I shall be interested in seeing how you do these.

Don
I have done a prototype, it is in this thread some where, kits and I have these to do and later a second bigger batch for the other end of the railway.

Re: The Potters Orchid Railway

Posted: Thu Sep 19, 2019 1:25 pm
by Andrew
The Gympie Rattler looks great - I particularly like the look of the luggage van behind the loco...

Re: The Potters Orchid Railway

Posted: Thu Oct 17, 2019 10:06 pm
by Hydrostatic Dazza
The workshop staff switched from Locomotive work last night to the S&T department. Senior management is pressing junior management to get cracking on the signalling, lighting and irrigation installed so the landscaping can be started this summer. We are not sure that this can be achieved by the end of this summer :oops: !

Image

Re: The Potters Orchid Railway

Posted: Fri Oct 18, 2019 8:21 am
by DonW
IF you work at the rate you have in the workshop I think you may well get there.

Don

Re: The Potters Orchid Railway

Posted: Sat Jan 25, 2020 9:24 pm
by Hydrostatic Dazza
The Potters Orchid Railway's S &T department mob are being a wee bit more productive of late. The small forest of signals are ready for trial installation however constant showers of rain has delayed this today. When the signal bases are in place then the terra forming can begin and the paths and gardens etc. Must be completed by November.

Image

Image

Image

Re: The Potters Orchid Railway

Posted: Sat Jan 25, 2020 9:57 pm
by Peter Butler
They all look superbly engineered and beautifully finished.

Re: The Potters Orchid Railway

Posted: Sun Jan 26, 2020 8:10 pm
by Soar Valley Light
Absolutely beautiful. They are works of art.

Andrew

Re: The Potters Orchid Railway

Posted: Sun Jan 26, 2020 8:15 pm
by Andrew
Soar Valley Light wrote: Sun Jan 26, 2020 8:10 pm They are works of art.
They are, aren't they? Can't wait to see them controlling some trains...

Re: The Potters Orchid Railway

Posted: Sun Jan 26, 2020 10:12 pm
by Hydrostatic Dazza
Thanks all for the kind words, these are much appreciated by S&T team. The signals are Pendle Valley Kits, with new bases and cranks that I made for quick installation and removal. Don't look too closely, it has been 40 years since I did any modeling of any form. The signals look OK from 3-5 meters away. The lever frame is fully interlocked so you have to learn how to work the frames correctly. At the other end , "Potters Junction" there will be a 24 lever frame with 23 levers in operation. However continuous unattended signal box operation can be achieved by unlatching two points so they can be trailed through, thus one can spend more time sampling the ales, red wine and fine smelly cheeses before the barbeque. After a few good glasses of Red, one might not be up to operating the frames anyhow. It will take two signal operators to be on their toes if there are two trains running. There could be four trains in operation on the main line but that will require total sobriety and careful driving to avoid a SPAD. :oops:

For us it is a garden railway, operation is the Jolly for me and also steam. We are not creating a fine scale layout, but nice landscaping and gardens is the goal. MAM has a collection of Bonsai trees underway that can be dropped in for special run days. There will be some whimsical details for all ages. That is the fun creativity part we are looking forward to.

Re: The Potters Orchid Railway

Posted: Sun Jan 26, 2020 10:33 pm
by Hydrostatic Dazza
The morning was working on the 3D drawings for the tender and it's Slomo installation at the Llewellyn Loco works. The arvo was installing and testing the signal installation till darkness was near, but the S & T department ran out of Shimano gear cable casing anyhow. Lots of Mossie repellent was required. The S&T department head has reported to Senior Management that all is going well. It will not be long till Slartibartfast is summed. His work on Norwegian fords is well reconised. ;)

Image

Image

Image

Image

Image

Re: The Potters Orchid Railway

Posted: Mon Feb 03, 2020 12:40 pm
by DonW
Wow those signals look really good and you say the frame is interlocked. I do like using proper interlocked lever frames I have promised myself I will build one for the indoor trains. I doubt I would need one for the garden as the tracks will be much simpler. One thing I found running a freinds exhibition layout with an interlocked frame was how much easier it made things if you returned all levers to normal after each move.
I was sure you would get a lot done and done well too.

Don

Re: The Potters Orchid Railway

Posted: Fri Feb 21, 2020 8:11 pm
by Hydrostatic Dazza
DonW wrote: Mon Feb 03, 2020 12:40 pm Wow those signals look really good and you say the frame is interlocked. I do like using proper interlocked lever frames I have promised myself I will build one for the indoor trains. I doubt I would need one for the garden as the tracks will be much simpler. One thing I found running a freinds exhibition layout with an interlocked frame was how much easier it made things if you returned all levers to normal after each move.
I was sure you would get a lot done and done well too.

Don
Thanks, the signal installation has stalled due to work, rain and more rain and a few trips to Gympie to fire and drive.
Yes, the frame is fully interlocked. I did not make the frame that I am installing but I will make the larger 24 lever frame for Potters Junction. Go here for info on the frames

https://modratec.com/
Harold exports the full assembled frames or kits to all parts of the world.he does all the design details of the interlocking following discussion with the punter. In reality for what they are and the time he spends designing and making them, these are far too cheap.

Re: The Potters Orchid Railway

Posted: Sat Mar 07, 2020 2:10 pm
by Puddlejumper
Just read this thread right through from the beginning and have to say its very inspiring Great workmanship, well done.

Re: The Potters Orchid Railway

Posted: Sun Mar 08, 2020 9:58 pm
by Hydrostatic Dazza
Puddlejumper wrote: Sat Mar 07, 2020 2:10 pm Just read this thread right through from the beginning and have to say its very inspiring Great workmanship, well done.

Thanks, but I have to report the landscaping paths and steps and the railway's terra forming have not progressed, the hot weather and frequent rain has the weeds waist high again. I have been away at the Rattler the last three days and the weeds are 2 feet higher. Maybe by next summer we will have progressed the POR over the cooler months.

Re: The Potters Orchid Railway

Posted: Mon Apr 27, 2020 10:07 pm
by Hydrostatic Dazza
The S & T appeared at the POR, long over due visit from the contractors. All 9 boards are in operation however the S & T electrical team is yet to make an appearance.

Image

Image

Image

Image

Image

Image

Oie, you have to stop !

Image

The Pottery Works at Potters Junction are working on prototype portals for the POR.

Image

Re: The Potters Orchid Railway

Posted: Mon Apr 27, 2020 10:28 pm
by Hydrostatic Dazza
There has been reports of a steam loco making clandestine evening runs on the POR metals. The reports also hint that the humans voices heard sounded a lot like the pair from senior management of the POR. The next morning an investigation was undertaken and an emptly bottle of Pinot Noir was found at Potter's Junction. Some out of focus photos have arrived via the post at the head office of OGRSR. (Office of Garden Railway Safety and Regulation) that seem to confirm the reports. The loco looks like MAM's Roundhouse Lady Ann kit she is currently building. Also it appears that some of the Llewellyn Loco works staff seem to be joy riding in the first wagon behind the loco. When questioned about this all the workshop staff denied it was them. They all said they were at home reading their Model Engineer magazines and such like. Another rumour in circulation is that the loco performed very well with it's Slomo mech and runs up to 28 mins duration obtained.

Image

Image

Image

Image

Re: The Potters Orchid Railway

Posted: Tue Apr 28, 2020 8:21 am
by FWLR
Some nice photos there Dazza. Great seeing MAM'S Lady Anne running. :thumbright:

Re: The Potters Orchid Railway

Posted: Tue Apr 28, 2020 9:56 pm
by Hydrostatic Dazza
FWLR wrote: Tue Apr 28, 2020 8:21 am Some nice photos there Dazza. Great seeing MAM'S Lady Anne running. :thumbright:

Thanks, I will pass on your comments to MAM.
One day the cement will disappear, the terra firming will be done and the planting underway, The Under arch bridge that is here will be installed and then night time runs will be we hope very photogenic.