Seven wooden sleepers replaced with concrete ones, after attaching to the rail the ballast was "tamped" under them to give a solid foundation.
Powered by 2 Honda 4 stroke engines.
The "Tamper" in action view from the side
View from the front
Tynes raised in the move position
Tynes lowered to tamping position
Tamping the sleepers on the ASCR
- GAP
- Trainee Driver
- Posts: 742
- Joined: Sun Dec 23, 2012 10:34 pm
- Location: Bundaberg QLD Australia
- Contact:
Tamping the sleepers on the ASCR
Graeme
From the home of the Ringbalin Light Railway
https://ringbalin-light-railway.blogspo ... -page.html
From the home of the Ringbalin Light Railway
https://ringbalin-light-railway.blogspo ... -page.html
Who is online
Users browsing this forum: No registered users and 1 guest