Tamping the sleepers on the ASCR

This is the place to talk about news, TV, music and other hobbies
Post Reply
User avatar
GAP
Trainee Driver
Trainee Driver
Posts: 717
Joined: Sun Dec 23, 2012 10:34 pm
Location: Bundaberg QLD Australia
Contact:

Tamping the sleepers on the ASCR

Post by GAP » Wed Dec 07, 2022 10:45 am

Seven wooden sleepers replaced with concrete ones, after attaching to the rail the ballast was "tamped" under them to give a solid foundation.
Powered by 2 Honda 4 stroke engines.

The "Tamper" in action view from the side
IMG_20221205_102203.jpg
IMG_20221205_102203.jpg (222.12 KiB) Viewed 8651 times
View from the front
IMG_20221205_102216.jpg
IMG_20221205_102216.jpg (216.56 KiB) Viewed 8651 times
Tynes raised in the move position
IMG_20221205_102239.jpg
IMG_20221205_102239.jpg (165.58 KiB) Viewed 8651 times
Tynes lowered to tamping position
IMG_20221205_102252.jpg
IMG_20221205_102252.jpg (211.67 KiB) Viewed 8651 times
Graeme
From the home of the Ringbalin Light Railway
https://ringbalin-light-railway.blogspo ... -page.html

Post Reply

Who is online

Users browsing this forum: No registered users and 1 guest