New Pedestrian Rail Crossing on ASCR Part 3 (Finished)

This is the place to talk about news, TV, music and other hobbies
Post Reply
User avatar
GAP
Trainee Driver
Trainee Driver
Posts: 686
Joined: Sun Dec 23, 2012 10:34 pm
Location: Bundaberg QLD Australia
Contact:

New Pedestrian Rail Crossing on ASCR Part 3 (Finished)

Post by GAP » Mon Nov 14, 2022 1:11 am

New crossing now completed, fit for purpose and in service.
All markings and signage installed.

Track
IMG_20221114_070517.jpg
IMG_20221114_070517.jpg (80.61 KiB) Viewed 2535 times
Approach with painter at work
IMG_20221114_070532.jpg
IMG_20221114_070532.jpg (198.45 KiB) Viewed 2535 times
Signage
IMG_20221114_094925.jpg
IMG_20221114_094925.jpg (208.52 KiB) Viewed 2535 times
Markings
IMG_20221114_095046.jpg
IMG_20221114_095046.jpg (122.85 KiB) Viewed 2535 times
IMG_20221114_095118.jpg
IMG_20221114_095118.jpg (110.88 KiB) Viewed 2535 times
Graeme
From the home of the Ringbalin Light Railway
https://ringbalin-light-railway.blogspo ... -page.html

User avatar
ge_rik
Administrator
Administrator
Posts: 6497
Joined: Sun Oct 25, 2009 10:20 pm
Location: Cheshire
Contact:

Re: New Pedestrian Rail Crossing on ASCR Part 3 (Finished)

Post by ge_rik » Mon Nov 14, 2022 10:06 am

Reminds me, I need to install another two level crossings on the PLR. As my railway is based on a real location, I need to show where various lanes and farm tracks would have crossed the railway. Most of them would have been on the level - not only because of the terrain but because the railway would have been built on a shoestring budget.

Rik
------------------------
Peckforton Light Railway - Blog Facebook Youtube

Post Reply

Who is online

Users browsing this forum: No registered users and 6 guests