Page 5 of 11

Posted: Wed Jul 06, 2016 4:19 pm
by stevenfitch
Ladder rack now installed and knocked down to below the original ground level, this should allow the top of the rails to be ground level thus level at the crossing of the path.


Image


Image


Image


Image

Posted: Wed Jul 06, 2016 11:59 pm
by jim@NAL
looking great keep up the good work

We have liftoff!

Posted: Mon Jul 11, 2016 7:42 pm
by stevenfitch
Ive actually got trains running!
Video to follow over the next few days.

Storage one side:
Image

..and the other:
Image

3 x curved points for storage access:
Image

Trains outside:
Image

Posted: Mon Jul 11, 2016 9:17 pm
by stevenfitch
OK, i just went straight back out, stuck a GoPro onto a truck and made a video...

https://youtu.be/sIBg1JgjXQ8

https://youtu.be/t6vfsPBRVTg

Posted: Sun Jul 17, 2016 3:24 pm
by stevenfitch
Ballasting completed on the lawn section.


Image


Image

Posted: Fri Aug 12, 2016 9:04 pm
by stevenfitch
Progress is beginning on the rear section


Image
Image
Image
Image

Posted: Sat Aug 13, 2016 8:21 pm
by Soar Valley Light
Nice work! How are you finding the Filcris as a foundation? It was clearly installed with accurate geometry and similar care has been taken with the track. The results luck very prototypical.

Andrew

Posted: Sun Aug 14, 2016 4:34 pm
by stevenfitch
Soar Valley Light:119454 wrote:Nice work! How are you finding the Filcris as a foundation? It was clearly installed with accurate geometry and similar care has been taken with the track. The results luck very prototypical.

Andrew
Very good stuff, worth the premium price tag in my opinion.

Probably not going to use it for the final section planned as below, will probably give breeze blocks a go and hide them with some cliffs made of concrete on mesh.


Image

quick update

Posted: Tue Feb 07, 2017 3:03 pm
by stevenfitch
Not much progress over the winter due to a broken ankle and the weather but this is where we currently stand:

The simple version of the plan was decided upon.
Image

The outer loop is laid and nearly all nearly connected up.
Image

And enough track is available to finish the job.
Image

Posted: Wed Feb 08, 2017 7:25 pm
by stevenfitch
Quick video of a full length train running round the garage loop.

https://www.youtube.com/watch?v=OZwXZsJRMQE

Posted: Wed Feb 08, 2017 8:00 pm
by tom_tom_go
I prefer the simple plan, less cluttered and train set looking.

Posted: Mon Feb 13, 2017 8:10 pm
by stevenfitch
tom_tom_go:122723 wrote:I prefer the simple plan, less cluttered and train set looking.
I think I may have the outer loop Lower than the inner (by lowering what is there now) then when the 'scenery' is built up around it will look a bit more natural.

VIDEO - Phase 3 up and running

Posted: Fri Feb 17, 2017 6:22 pm
by stevenfitch
ust a couple of issues with the auto reversing modules not switching properly to solve but i've now got the full length loop up and running.

Three minutes all the way round and back to the beginning.


Posted: Fri Feb 17, 2017 9:59 pm
by tom_tom_go
I thought you ran DCC, should have no issues with reversing loops?

Posted: Sat Feb 18, 2017 6:08 pm
by stevenfitch
tom_tom_go:122888 wrote:I thought you ran DCC, should have no issues with reversing loops?
It is DCC, i think it may be a problem with the wire gauge, need to use a thicker gauge (thus less resistance) for the reversing loop feed so it triggers more easily - either that or the module is just knackered.

Automatic Lights At Night

Posted: Sun Mar 12, 2017 9:55 pm
by stevenfitch
Installed a dusk / dawn sensor on the outside of the garage, this is then connected to a DS64 input (via a relay) so TrainController on the PC knows if it is dark outside and turns the loco lights, carraige lights and tail lights on when trains leave the garage.

Test it with a black bag to simulate darkness and all working.

Image

Image

Image

OTT Carraige Lights

Posted: Sun Mar 12, 2017 10:04 pm
by stevenfitch
Using LED strips inside two coaches and a couple of spare decoders i had...

We now have a choice of blue, white or combined lighting + the rear coach has a red tail light and the other one has separate lights in the toilet compartment.

Image


Image


Image


Image

Posted: Mon Mar 13, 2017 8:40 am
by Big Jim
That is a very cunning idea.
It just shows how far this hobby had moved over the years.

Re: UK Rolling Stock in G - Project not yet started

Posted: Sat Apr 08, 2017 7:23 pm
by stevenfitch
Back area trackwork in progress, just the block wiring left to connect.

Half way through
IMG_20170406_192718.jpg
IMG_20170406_192718.jpg (685.41 KiB) Viewed 7073 times
Half way through
IMG_20170406_192728.jpg
IMG_20170406_192728.jpg (778.4 KiB) Viewed 7073 times
Finished track ready to be fixed in place
IMG_20170408_190819.jpg
IMG_20170408_190819.jpg (583.05 KiB) Viewed 7073 times

Re: UK Rolling Stock in G - Project not yet started

Posted: Sat Apr 08, 2017 9:06 pm
by tom_tom_go
That is going to be a busy railway when it is finished Steve.