Sand Quarry Extension

What is your latest project?
User avatar
ge_rik
Administrator
Administrator
Posts: 6554
Joined: Sun Oct 25, 2009 10:20 pm
Location: Cheshire
Contact:

Re: Sand Quarry Extension

Post by ge_rik » Thu Apr 27, 2023 7:12 pm

The trackwork has now all been laid and a couple of test trains have been run.
DSCN3442.JPG
DSCN3442.JPG (993.64 KiB) Viewed 3639 times
DSCN3443.JPG
DSCN3443.JPG (1011.78 KiB) Viewed 3639 times

Ballasting will be done after I've had a couple of running sessions in case a bit of tweaking is needed.

Rik
------------------------
Peckforton Light Railway - Blog Facebook Youtube

User avatar
Peter Butler
Driver
Driver
Posts: 5234
Joined: Sun Sep 09, 2012 10:33 pm
Location: West Wales

Re: Sand Quarry Extension

Post by Peter Butler » Thu Apr 27, 2023 7:31 pm

That's come together very quickly and looks great in your sunshine!
The best things in life are free.... so why am I doing this?

User avatar
ge_rik
Administrator
Administrator
Posts: 6554
Joined: Sun Oct 25, 2009 10:20 pm
Location: Cheshire
Contact:

Re: Sand Quarry Extension

Post by ge_rik » Fri Apr 28, 2023 7:51 am

And here's a video showing the first train to run on the line


Rik
------------------------
Peckforton Light Railway - Blog Facebook Youtube

User avatar
Peter Butler
Driver
Driver
Posts: 5234
Joined: Sun Sep 09, 2012 10:33 pm
Location: West Wales

Re: Sand Quarry Extension

Post by Peter Butler » Fri Apr 28, 2023 9:14 am

Wonderful stuff Rik, always something new to look forward to. We do love our toys!
The best things in life are free.... so why am I doing this?

User avatar
ge_rik
Administrator
Administrator
Posts: 6554
Joined: Sun Oct 25, 2009 10:20 pm
Location: Cheshire
Contact:

Re: Sand Quarry Extension

Post by ge_rik » Fri Apr 28, 2023 1:46 pm

Peter Butler wrote: Fri Apr 28, 2023 9:14 am Wonderful stuff Rik, always something new to look forward to. We do love our toys!
Indeed we do!
That gatehouse looks as if it has been made from kids' building blocks at present, but it will improve .....

Rik
------------------------
Peckforton Light Railway - Blog Facebook Youtube

User avatar
ge_rik
Administrator
Administrator
Posts: 6554
Joined: Sun Oct 25, 2009 10:20 pm
Location: Cheshire
Contact:

Re: Sand Quarry Extension

Post by ge_rik » Fri Apr 28, 2023 7:46 pm

Now done a bit more work on the gatehouse. I went to my local builders' merchant and bought two more Thermalite blocks. Give him his due, the chap behind the counter didn't bat an eyelid and even loaded them into the boot of my car.
IMG_3291.JPG
IMG_3291.JPG (100.2 KiB) Viewed 3582 times
IMG_3293.JPG
IMG_3293.JPG (128.41 KiB) Viewed 3582 times


I've smoothed down the outer surfaces (a couple of hours' work with a rasp) and made a start on some of the detailing. It will take a while yet but it's beginning to take shape.

Such a contrast to normal model making where we start with nothing and gradually build it up. Working with Thermalite blocks is the opposite - start with a big chunk of something and whittle away at it. A bit messy but very satisfying.

Rik
BTW - this is what inspired the build - Peckforton Castle Gatehouse
PK gatehouse1.jpg
PK gatehouse1.jpg (116.71 KiB) Viewed 3582 times
------------------------
Peckforton Light Railway - Blog Facebook Youtube

User avatar
ge_rik
Administrator
Administrator
Posts: 6554
Joined: Sun Oct 25, 2009 10:20 pm
Location: Cheshire
Contact:

Re: Sand Quarry Extension

Post by ge_rik » Fri Apr 28, 2023 7:57 pm

Trying to decide how to join the blocks. I've got instant grab adhesive which will probably do the job but I'm going to need some gap filling which can then be carved and filed - so, I'm wondering whether a weak mortar mix might be better (ie a greater proportion of sand to cement than usual).

Any thoughts?

Rik
------------------------
Peckforton Light Railway - Blog Facebook Youtube

User avatar
philipy
Moderator
Moderator
Posts: 5078
Joined: Sun Jan 30, 2011 3:00 pm
Location: South Northants

Re: Sand Quarry Extension

Post by philipy » Fri Apr 28, 2023 7:58 pm

ge_rik wrote: Fri Apr 28, 2023 7:46 pm A bit messy but very satisfying.
Yes, I remember much the same thing when I did my bridge. :D
Philip

User avatar
Peter Butler
Driver
Driver
Posts: 5234
Joined: Sun Sep 09, 2012 10:33 pm
Location: West Wales

Re: Sand Quarry Extension

Post by Peter Butler » Fri Apr 28, 2023 8:09 pm

ge_rik wrote: Fri Apr 28, 2023 7:57 pm Trying to decide how to join the blocks. I've got instant grab adhesive which will probably do the job but I'm going to need some gap filling which can then be carved and filed - so, I'm wondering whether a weak mortar mix might be better (ie a greater proportion of sand to cement than usual).

Any thoughts?

Rik
I have used waterproof tile adhesive (as used in swimming pools) to cement porous items together. Once set, a screed of the same could be applied and stonework can be scribed into the soft surface... Simpler than dry carving! A little SBR mixed in adds flexibility and additional waterproofing.
The best things in life are free.... so why am I doing this?

User avatar
philipy
Moderator
Moderator
Posts: 5078
Joined: Sun Jan 30, 2011 3:00 pm
Location: South Northants

Re: Sand Quarry Extension

Post by philipy » Sat Apr 29, 2023 6:15 am

Peter Butler wrote: Fri Apr 28, 2023 8:09 pm
ge_rik wrote: Fri Apr 28, 2023 7:57 pm Trying to decide how to join the blocks. I've got instant grab adhesive which will probably do the job but I'm going to need some gap filling which can then be carved and filed - so, I'm wondering whether a weak mortar mix might be better (ie a greater proportion of sand to cement than usual).

Any thoughts?

Rik
I have used waterproof tile adhesive (as used in swimming pools) to cement porous items together. Once set, a screed of the same could be applied and stonework can be scribed into the soft surface... Simpler than dry carving! A little SBR mixed in adds flexibility and additional waterproofing.
I've had two experiences in this area:
One is my aforementioned bridge, which if you can remember that long back, broke whilst I was carving it and I had to glue a bit of the parapet back on, and I also glued the two halves of the bridge together which had been carved from two blocks because one wasn't wide enough. I used Everbuild "Stixall" adhesive to glue the faces then 'grouted' with a slurry of block dust and SBR and then pressed neat dust onto the final surface because the SBR darkens it. The joints and repair seem to have held up for the several years it has been in situ.

The other thing is that practically my first scenic construction, was a pair of tunnel mouths. I used an electric tile saw to cut roughly rectangular limestone blocks which I then glued to an old roofing slate using waterproof tile cement and grouted with more of the same tile cement. They have both been in situ for over ten years and not one block has dropped off yet, much to my surprise!
Philip

User avatar
ge_rik
Administrator
Administrator
Posts: 6554
Joined: Sun Oct 25, 2009 10:20 pm
Location: Cheshire
Contact:

Re: Sand Quarry Extension

Post by ge_rik » Sat Apr 29, 2023 6:54 am

Thanks chaps.
I did wonder about tile cement. I might even have some left after doing the kitchen tiling. It is waterproof but not sure if it's swimming pool standard.

I like the idea of grouting with the dust from filing the blocks. There's certainly plenty to use. I might try mixing it with cement to see if that helps retain its colour.

I did consider using plaster. But that might not be as weatherproof as the other options.

Rik
------------------------
Peckforton Light Railway - Blog Facebook Youtube

User avatar
philipy
Moderator
Moderator
Posts: 5078
Joined: Sun Jan 30, 2011 3:00 pm
Location: South Northants

Re: Sand Quarry Extension

Post by philipy » Sat Apr 29, 2023 7:55 am

ge_rik wrote: Sat Apr 29, 2023 6:54 am
I did wonder about tile cement. I might even have some left after doing the kitchen tiling. It is waterproof but not sure if it's swimming pool standard.
Mine was only left over from bathroom tiling, nothing exotic.
Philip

Phil.P
Fireman
Fireman
Posts: 446
Joined: Thu Jan 31, 2019 3:28 pm
Location: Staffs. UK

Re: Sand Quarry Extension

Post by Phil.P » Sat Apr 29, 2023 11:02 am

Don't use plaster!

It will hold moisture, and once it gets frosted, it just crumbles..

Phil.P

DonW
Fireman
Fireman
Posts: 261
Joined: Mon Jul 22, 2019 12:57 pm
Location: West Somerset

Re: Sand Quarry Extension

Post by DonW » Sat May 06, 2023 1:04 pm

I would suggest using CT1 to hold it together and if it needs extra strength there is Power Grab and Bond but you need to make that spot on not suitable for adjusting can be used to stones to a wall. CT1 is fine for that job and comes in several colours https://www.ct1.com/our-products/ct1/.

very useful stuff

Don

User avatar
ge_rik
Administrator
Administrator
Posts: 6554
Joined: Sun Oct 25, 2009 10:20 pm
Location: Cheshire
Contact:

Re: Sand Quarry Extension

Post by ge_rik » Sun May 07, 2023 8:54 am

Thanks chaps. I'll give CT1 a try

Rik
------------------------
Peckforton Light Railway - Blog Facebook Youtube

User avatar
Old Man Aaron
Trainee Driver
Trainee Driver
Posts: 807
Joined: Wed Oct 19, 2016 11:08 am
Location: Sunshine Coast QLD, Australia

Re: Sand Quarry Extension

Post by Old Man Aaron » Mon May 08, 2023 3:17 pm

Always a treat to see really unique structures. :salute:
Regards,
Aaron - Scum Class Works

Post Reply

Who is online

Users browsing this forum: No registered users and 2 guests