Re: Welcome to the CHLR

Post by markoteal » Thu May 19, 2022 10:09 am

Ok - in the new few posts over the coming days/weeks I’ll give you a tour of some of the areas on the line showing what’s there at the moment and what’s planned - I’ll also sort out a proper diagram of the line to help people orientate the featured area in context to everything else.

The first area I thought I’d feature is what I’ve called the tramway section - see photo below
8D05CACA-0438-47A7-A0FE-786FB0BF43D2.jpeg
8D05CACA-0438-47A7-A0FE-786FB0BF43D2.jpeg (4.54 MiB) Viewed 3302 times


This is a section down one side of the garden the previous owner had included - a number of replica railway sleepers buried into the ground - when we looked around the house and garden before buying, when I saw this area I immediately thought where I can start the new CHLR from.
FBADF7A3-9534-48CE-8067-FBBC88F840F6.jpeg
FBADF7A3-9534-48CE-8067-FBBC88F840F6.jpeg (6.18 MiB) Viewed 3302 times
So when we moved in, this is where I started - as you can see from the photos and previous video, it’s a nice long straight running from the quarry points down to the stone cutting and allows trains to stretch their legs - eventually I’ll build a halt for some trains to stop at but that’s a phase two activity - I’ll also ballast this section eventually but not as urgent as other areas as pets and birds tend to step over the line here due to the firm footing offered by the sleepers
Where did I put that uncoupler?

User avatar
markoteal
Trainee Driver
Trainee Driver
Posts: 763
Joined: Mon Apr 18, 2016 6:23 pm
Location: Yorkshire

The challenge of ground level running with dogs

Post by markoteal » Thu Jun 02, 2022 9:21 pm

Came across this situation on the tramway section the other day:-
B2D5DE73-F93E-4BAC-9156-AB0483A52446.jpeg
B2D5DE73-F93E-4BAC-9156-AB0483A52446.jpeg (556.18 KiB) Viewed 3194 times
The joys of a terrier digging up the flower bed next to the line - so management have accelerated activity to wall up and pebble the flowerbed in strategic areas- the plan is to make much of the flowerbeds rockery style anyway.

Below is a pic of the first section being completed. As before on the old line, the trains play a key role in bringing and taking away materials for jobs
2A0A62F4-26A7-41D4-ACF3-FDA24F9483B9.jpeg
2A0A62F4-26A7-41D4-ACF3-FDA24F9483B9.jpeg (5.47 MiB) Viewed 3194 times
The ballast shoulder needs coloring yet- currently using a cement mix but also planning some SBR use as well - currently using alpine grit as a base ballast but planning a final topping of potting grit
Where did I put that uncoupler?