Page 1 of 5

Taking off into 7/8 ( or 1:13,3)

Posted: Tue Oct 07, 2014 9:34 pm
by St.Michael
Hi all.
After a long time of thinking, planning (and dreamining) I´m now taking my first, trembling steps into a bigger scale :shock:
As I have mentioned earlier on this forum, a 1:13,3 O&K loco has been ordered. And now I have been recycling some of my LGB-stuff, in order to save some initial costs...
Image
On this first pict of the "new" railway, I´ve built a simple staition with a passing loop and a siding for firing up, or other use. The station is built on a 2m. long aluminium-name plate from my job (we are going to move from the current place) I have drilled some random holes for draining and to, in an easy way beeing able to screw small planks to the base plate. And then it was easy to screw the tracks into the underlaying planking. My two first wagons comes from Swift sixteen

Image
On this pict I´m showing two comparing figures, the right one is in a scale of 1:19 and the other strange looking man is in fact a souvenir my parents bought in Spain, in the beginning of the seventies (Sancho Pançha, if he is familar)  I think he suits the new scale.
I also found out that some of my LGB-wagons can be used as base for other wagons in 7/8  It´s a bit strange to find out that LGB-wagons are bigger than my Swift sixteen-wagons who are produced in 7/8-scale.
This is a first small start, and I would appreciate advices and other ideas on how to continue this  :?:
Regards to you all from Michael

Posted: Tue Oct 07, 2014 11:18 pm
by steamie1
Looking good. Hey! just an idea, how about loosing every other sleeper to get a bigger sleeper gap. Less mainline see.

If you used a razor saw and cut inside and out beside the rail, flush, you would not degrade the ladder effect of the plastic underneath (i.e. the plastic stability sleepers being tied together still.)

Posted: Wed Oct 08, 2014 7:27 am
by St.Michael
Steamie 1, thats a real good and simple thing to do. I´m starting right away :D Thank you.
Btw. I´m pondering of what sort of material to use, when I shall fill up the empty space under the tracks.? The best I think is if there is a light weight material that can endure an outdoor clima. Any sugestions?

Posted: Wed Oct 08, 2014 10:50 am
by Mattawa
Good start there .........I'll be watching this project!

Posted: Wed Oct 08, 2014 12:20 pm
by Dr. Bond of the DVLR
I read in Railway Modeller many years ago of a person using expanding foam that comes in a pressurized can. They squirted the stuff on then when it had set they dug out the railway and sculpted it into the ballast.

Posted: Wed Oct 08, 2014 3:33 pm
by Peter Butler
I have never heard of this method but would strongly advise against it..... that stuff expands enormously and sticks to everything!
You would spend weeks getting it off things you never intended it to cover and even then it would be a mess.
Before you attempt it try a small section which is disposable, because I think that is what will happen.

Posted: Wed Oct 08, 2014 4:33 pm
by St.Michael
Hi.
I was thinking of using expanding foam, but had second thoughts about it, just like Peter is pointing out. The solution for me will be to use ground isolating foam (the blue ugly kind) I am going to saw it into 10mm thick slices and stick them under the tracks. Then I will cover it all with some kind of gravelmix.
I have done like Steamie suggested and removed every other sleeper, and it gave a remarkable effect. Suddenly the tracks have grown in scale, and also become very industrial 2 foot :D

Posted: Wed Oct 08, 2014 7:06 pm
by jim@NAL
I agree with peter that foam is horrid stuff .we call it crazy foam at work

Posted: Wed Oct 08, 2014 9:51 pm
by steamie1
Sharp sand and cement works a treat in door or out.

Posted: Fri Oct 10, 2014 10:35 am
by St.Michael
Hi again.
Here is an update: I have carried the stationplate outdoors and am now trying it out on it´s intended place. I have also started to try out the connection to my 16mm line.
Image

The station is not built up to its right level yet. The yellow spirit-level indicates the hight of the line
Image
And as always, things that looks big indoors, almost disappears when you place it outdoors :?

Posted: Wed Oct 22, 2014 6:07 pm
by Bill/Rubery
If your outside the rain drops are not 7/8" scale but real scale and big! A gravel that matches your local stone works well and is not dislodged by rain. Regarding track, most industrial lines had the sleepers covered by dirt and grass. You could do the same to save work. 7/8" scale is a good scale for people with imagination....i.e. building your own stuff or converting it.....take a look at my web site to see what I mean!

Posted: Wed Oct 22, 2014 6:09 pm
by Bill/Rubery
St. Mick, You really need a good gardener!!

Posted: Wed Oct 22, 2014 6:43 pm
by steamie1
Its looking good just keep going. Woop Woop!

Posted: Thu Oct 23, 2014 3:33 pm
by SpudUk
I dislike these 7/8ths threads....they tempt me too much

Posted: Fri Oct 24, 2014 4:50 pm
by tom_tom_go
Do it you won't regret it, everything is bigger :)

Posted: Sun Oct 26, 2014 7:50 am
by St.Michael
Hi all. Thank you for good thoughts and replies.. Yes I´m already getting fed up with cutting out every second sleeper, so I´ll go for the nature way and let them dissapear in dirt instead.
St. Mick, You really need a good gardener!!
Bill /Rubery, there are a whole bunch of them trimming the grass arond the house ( four legged with lots of curly white or black hair all over their bodies..)
Image
The station has been rised to its right level, and the connecting line to the 16mm railway is taking shape. Indoors I´m building an IPe coach. In this scale one really get space to work with interior.
Image

Image

Posted: Sun Oct 26, 2014 8:10 am
by kandnwlr
When are you getting your O&K locomotive from Herrmann? He told me that he was now aiming to have mine ready by December .... :?

Posted: Sun Oct 26, 2014 9:03 am
by St.Michael
Kandnwlr. I'm in no hurry. As you can see on my pictures we are heading towards winter and snow. If I remember the right month, it is april /may -15 that the loco will be delivered. But I understand that you drive trains all year ;) (Actually I was a bit worried that Herrmann had quit buisness, when the webside dissapeared)

Posted: Sun Oct 26, 2014 9:35 am
by MDLR
St.Michael:105159 wrote:But I understand that you drive trains all year  ;)
You'd need a VERY large snowplough to be able to do that in YOUR part of the world!

Posted: Sun Oct 26, 2014 9:45 am
by kandnwlr
St.Michael:105159 wrote:Kandnwlr. I'm in no hurry. As you can see on my pictures we are heading towards winter and snow. If I remember the right month, it is april /may -15 that the loco will be delivered. But I understand that you drive trains all year  ;) (Actually I was a bit worried that Herrmann had quit buisness, when the webside dissapeared)
Website is still there. But according to the notice, he´s gone on holiday until the end of the month.

http://www.echtdampfwelt.de/