And now, after 3-and-a-bit years I've finally got round to it!

First up, it's November 2006 and me gassing up Gwydion for the very first time, fresh from collection from Roundhouse the previous day. At this point my line was a tiny circuit that is now the upper ballon loop, a mere 13 yards in length, with vicious curves at each end (the tunnel one being eased eventually in 2008, there is a topic about that project somewhere on here!)

Millies when new can be a bit wild, certainly when run by unexperianced drivers! Here is Gwydion wizzing out of the tunnel light engine

Obviously I had picked the loco up an turned it round, before attaching a train comprised of my brake van and my then new scratchbuilt Welsh highland carriage

A couple of weeks later and I was making efforts to give Gwydion a longer run. This pic shows the trackbed method for most of the line above Afallen, cast concrete in two layers of a screed mix over a more convential mix. The screed just used sharp sand and cement so that it could be drilled into.

January 1st 2007 and the section was complete, running as far as Glan-yr-afon bridge because Afallen hadn't been built yet. Trains ran push pull for alternate runs, a very hair raising operation through the tunnel!

The way ahead at Afallen

Febuary and Afallen station is complete with track. Trains ran round here untill the completed continuous line was opened in December 2007.

The raised section slowly begining to take shape. The loco is my IP Punch Hazil. Note another scratchbuilt carriage has appeared, this one has now left the ANLR though.

Gwydion running round, with the first plants of what is now my slightly famous forest section (well it has appeared on the 16mm association website and the back cover of the November 2010 16mm today!)

By April, the raised section had really took shape, and another scratchbuild carriage had appeared (WHR Gladstone car)
Hope you've enjoyed my ramble down memory lane










































