Dual gauge circuit of track finished.
Posted: Fri Oct 06, 2023 8:30 am
Hi,
A few days ago the fitting of the third rail of the dual gauge circuit of track on the Cardiff Model Engineering Society's garden railway was completed and a few minutes of playing trains was required.
https://youtu.be/0NJLuxMdv7c?si=Uijj81sV09yFXI0z
Take care Tony.
A few days ago the fitting of the third rail of the dual gauge circuit of track on the Cardiff Model Engineering Society's garden railway was completed and a few minutes of playing trains was required.
https://youtu.be/0NJLuxMdv7c?si=Uijj81sV09yFXI0z
Take care Tony.