Page 1 of 1

Model railway progress.

Posted: Sat Jun 13, 2020 11:47 am
by Tony Bird
Hi,

Yesterday I finished the last of the track work by making and fitting the moving centre part of the last two points. The photographs show the start of day, during the day and end of day. My wife finished ballasting the last but two of the base boards. The photographs show the ballast applied and after tipping to remove the excess ballast.

I have to say it is good to have finished the track laying it was getting a bit repetitive. One of the criterion set when designing the layout along with being able to fit it in the trailer was weight. Now the baseboards have track and are ballasted it is possible weigh them. Assuming the sums are correct the 18 base boards have a total weight of 82 kg say 180 lb, the heaviest single or pair of hinged boards being 6 kg say 13.5 lb which is well within my present lifting capacity.

Where from now? Really the layout should be set up in its entirety and trains run to show up areas that might need tweaking. This not possible at the present time so a bit of a break from layout building before starting on some scenery I think.

Take care stay safe.

Tony.
001 IMG_1713 LR.jpg
001 IMG_1713 LR.jpg (71.93 KiB) Viewed 5378 times
002 IMG_1714 LR.jpg
002 IMG_1714 LR.jpg (76.07 KiB) Viewed 5378 times
003 IMG_1716 LR.jpg
003 IMG_1716 LR.jpg (69.83 KiB) Viewed 5378 times
004 IMG_1715 LR.jpg
004 IMG_1715 LR.jpg (70.27 KiB) Viewed 5378 times
005 IMG_1717 LR.jpg
005 IMG_1717 LR.jpg (68.77 KiB) Viewed 5378 times

Re: Model railway progress.

Posted: Sat Jun 13, 2020 12:48 pm
by Peter Butler
Great result Tony, congratulations to you and your wife for her support, you are most fortunate to have her along.

Re: Model railway progress.

Posted: Thu Jul 23, 2020 7:15 am
by FWLR
Agree whole heartedly Peter. A good supportive partner is the best anyone can have.

Love your boards Tony.

Re: Model railway progress.

Posted: Fri Jul 24, 2020 6:39 pm
by steamyjim
Looks fantastic Tony!

What did you use for ballast?

Re: Model railway progress.

Posted: Sun Jul 26, 2020 9:25 am
by Tony Bird
Hi Jim,

The granite ballast was bought from a model shop; the brand name is Javis who make products used for model scenery. Paint more or less the same colour as the ballast was used to glue it in place.

Take care Tony.