Right now I am serious considering 'flipping' the layout at Skebawn so the buildings are on the back side of the layout where the wife can see them, and my feet will not come into contact with them. The retaining wall I put across the front of the staton before I left for the UK did its job, and the only detritus in the station area was fallen pine needles.
I do need to get on with finishing some outstanding projects, and get my feet wet constructing station buildings. Despite my best attempts to keep the IMR out of things the Manx influence is growing, and seems to be strongest when it comes to structures.
I managed to visit a couple of SG lines in England - Peakrail and the Wensleydale Railway, and was very favourably impressed by the latter which is very much a minimum/light railway in signalling terms. I had three days on the Isle of Man Railway and did a bit of train timing. Nothing spectacular, as loads tend to be lightish in September, but 'Hutchinson' did a very creditable job with a late running 15.50 Port Erin-Douglas on Sept 21st. A protracted station stops at Castletown (picked up a large party of kids) and Ballasalla (SB train late) led to a pretty brisk run from the latter station into Douglas. From being almost 4 mins down at Ballasalla, we were only 1:38 down into Douglas. The net time was something like 54 minutes, and at no point did we exceed the 25mph speed limit. In the old days they would have push a little until the time was back in the bag, but these days making up time is more a matter of quick station stops and quick recoveries from temp. speed restrictions - such as the semi-permanent one at Meary Veg!
Cheers,
Peter in AZ



