Beeston Market is no more .......

What is your latest project?
User avatar
ge_rik
Administrator
Administrator
Posts: 7844
Joined: Sun Oct 25, 2009 10:20 pm
Location: Cheshire
Contact:

Re: Beeston Market is no more .......

Post by ge_rik » Sun Mar 09, 2025 8:27 am

The treated 6"x1" boards for the baseboards have arrived. Just checking I've got enough and also allowing them to dry out before cutting, fixing and covering in felt (tar paper to our colonial readership).
IMG_3997.JPG
IMG_3997.JPG (1.36 MiB) Viewed 31035 times
IMG_4000.JPG
IMG_4000.JPG (862.25 KiB) Viewed 31035 times

Rik
------------------------
Peckforton Light Railway - Blog Facebook Youtube

User avatar
philipy
Moderator
Moderator
Posts: 5956
Joined: Sun Jan 30, 2011 3:00 pm
Location: South Northants

Re: Beeston Market is no more .......

Post by philipy » Sun Mar 09, 2025 9:42 am

Not letting the grass grow under your feet then, Rik. How long are you expecting them to take to dry?
With this current nice weather, it shouldn't take too long.
Philip

User avatar
ge_rik
Administrator
Administrator
Posts: 7844
Joined: Sun Oct 25, 2009 10:20 pm
Location: Cheshire
Contact:

Re: Beeston Market is no more .......

Post by ge_rik » Mon Mar 10, 2025 9:01 am

Hopefully, should be able to start fixing them in place during the coming week - weather permitting.
I was surprised how water-logged the planks were. They are stored outside at the fencing supplier.

Rik
------------------------
Peckforton Light Railway - Blog Facebook Youtube

User avatar
TF44
Cleaner
Cleaner
Posts: 9
Joined: Thu Mar 06, 2025 12:49 pm
Location: East Suffolk

Re: Beeston Market is no more .......

Post by TF44 » Mon Mar 10, 2025 2:40 pm

Lovely to see the work progressing on repairing this wonderful railway. Have to say not my favourite station on the line, that goes to Peckforton itself.
North Suffolk Railway Company
Member of The Association of 16mm Narrow Gauge Modellers

User avatar
GAP
Trainee Driver
Trainee Driver
Posts: 869
Joined: Sun Dec 23, 2012 10:34 pm
Location: Bundaberg QLD Australia
Contact:

Re: Beeston Market is no more .......

Post by GAP » Mon Mar 10, 2025 9:16 pm

Rik,
If that is pine planking I suggest that you cut it and fix it in place while it is wet.
Down here we get treated pine that is classified as "wet cut" and if it is left out in the sun it will warp terribly.
I have had i length clamped down to a board to get it back into shape for 3 weeks.
For treated timber it is recommended that galvanised screws are used as a minimum, preferably using treated timber screws is the best.
Untreated screws will rust away in a short period of time (less than 5 years) in my experience.
Graeme
From the home of the Uppen Down Railway
https://ringbalin-light-railway.blogspo ... -page.html

User avatar
ge_rik
Administrator
Administrator
Posts: 7844
Joined: Sun Oct 25, 2009 10:20 pm
Location: Cheshire
Contact:

Re: Beeston Market is no more .......

Post by ge_rik » Tue Mar 11, 2025 12:26 pm

GAP wrote: Mon Mar 10, 2025 9:16 pm Rik,
If that is pine planking I suggest that you cut it and fix it in place while it is wet.
Down here we get treated pine that is classified as "wet cut" and if it is left out in the sun it will warp terribly.
I have had i length clamped down to a board to get it back into shape for 3 weeks.
For treated timber it is recommended that galvanised screws are used as a minimum, preferably using treated timber screws is the best.
Untreated screws will rust away in a short period of time (less than 5 years) in my experience.
Thanks Graeme
I've decided to use stainless steel screws all round. The old steel ones were, as you suggest, very rusted though I did manage to remove around 90% of them.

See below for the latest update.

Rik
------------------------
Peckforton Light Railway - Blog Facebook Youtube

User avatar
ge_rik
Administrator
Administrator
Posts: 7844
Joined: Sun Oct 25, 2009 10:20 pm
Location: Cheshire
Contact:

Re: Beeston Market is no more .......

Post by ge_rik » Tue Mar 11, 2025 12:32 pm

Latest progress

I've now cut all the boards and this afternoon will start fixing them into place.
IMG_4005.JPG
IMG_4005.JPG (1.16 MiB) Viewed 30817 times
The copper mine sidings will now be an inch above the main line in the foreground.
IMG_4007.JPG
IMG_4007.JPG (1.55 MiB) Viewed 30817 times
The station area at Beeston Market is now slightly wider in the middle section.
IMG_4008.JPG
IMG_4008.JPG (1.41 MiB) Viewed 30817 times
IMG_4010.JPG
IMG_4010.JPG (1.36 MiB) Viewed 30817 times
Once the boards are fixed into place, I'll cover them in good quality roofing felt (tar paper) and seal all joints with bituminous adhesive.

Rik
------------------------
Peckforton Light Railway - Blog Facebook Youtube

User avatar
WLR_CD
Trainee Fireman
Trainee Fireman
Posts: 192
Joined: Sat Jan 04, 2025 2:07 pm
Location: Kent

Re: Beeston Market is no more .......

Post by WLR_CD » Tue Mar 11, 2025 2:13 pm

Always nice to see construction photos.
I use stainless steel screws on my railway.
Martin

User avatar
GAP
Trainee Driver
Trainee Driver
Posts: 869
Joined: Sun Dec 23, 2012 10:34 pm
Location: Bundaberg QLD Australia
Contact:

Re: Beeston Market is no more .......

Post by GAP » Tue Mar 11, 2025 8:46 pm

ge_rik wrote: Tue Mar 11, 2025 12:26 pm
GAP wrote: Mon Mar 10, 2025 9:16 pm Rik,
If that is pine planking I suggest that you cut it and fix it in place while it is wet.
Down here we get treated pine that is classified as "wet cut" and if it is left out in the sun it will warp terribly.
I have had i length clamped down to a board to get it back into shape for 3 weeks.
For treated timber it is recommended that galvanised screws are used as a minimum, preferably using treated timber screws is the best.
Untreated screws will rust away in a short period of time (less than 5 years) in my experience.
Thanks Graeme
I've decided to use stainless steel screws all round. The old steel ones were, as you suggest, very rusted though I did manage to remove around 90% of them.

See below for the latest update.

Rik
Gone for the top shelf option well done.
I still wonder about using the tar paper, never used it but then again I use painted fibre cement sheeting for my bench work.
Graeme
From the home of the Uppen Down Railway
https://ringbalin-light-railway.blogspo ... -page.html

User avatar
GTB
Driver
Driver
Posts: 1694
Joined: Sat Mar 05, 2011 2:46 pm
Location: Australia

Re: Beeston Market is no more .......

Post by GTB » Wed Mar 12, 2025 2:53 am

GAP wrote: Tue Mar 11, 2025 8:46 pm I still wonder about using the tar paper, never used it but then again I use painted fibre cement sheeting for my bench work.
Malthoid is the Aust. equivalent to tar paper/roofing felt. The Malthoid tech data sheet (instructions for use) makes for interesting reading. Sounds like a lot of palaver to go through to get a truly waterproof layer over timber.

I used Weathertex for layout decking, which is less brittle than fibro cement, but more expensive. Malthoid over pine wouldn't be my choice, as I live in a declared termite zone.

Graeme

User avatar
GTB
Driver
Driver
Posts: 1694
Joined: Sat Mar 05, 2011 2:46 pm
Location: Australia

Re: Beeston Market is no more .......

Post by GTB » Wed Mar 12, 2025 3:58 am

ge_rik wrote: Tue Mar 11, 2025 12:32 pm Latest progress

I've now cut all the boards and this afternoon will start fixing them into place.
As usual, you aren't letting the grass grow under your feet...... ;)

Sorry I've come in a bit late. You possibly already know that when you cut a treated pine board that the cut surface is left largely unprotected, but some readers may not know that.

Are you treating the cut ends with a wood preservative before fixing them down? If not the boards will rot from the ends and likely start to lift as they rot around the screws.

Paint on wood preservatives are available here in Oz in brush on and spray can forms and I would imagine that there is something equivalent available in the UK.

Regards,
Graeme

User avatar
ge_rik
Administrator
Administrator
Posts: 7844
Joined: Sun Oct 25, 2009 10:20 pm
Location: Cheshire
Contact:

Re: Beeston Market is no more .......

Post by ge_rik » Wed Mar 12, 2025 7:25 am

GTB wrote: Wed Mar 12, 2025 3:58 am
ge_rik wrote: Tue Mar 11, 2025 12:32 pm Latest progress

I've now cut all the boards and this afternoon will start fixing them into place.
As usual, you aren't letting the grass grow under your feet...... ;)

Sorry I've come in a bit late. You possibly already know that when you cut a treated pine board that the cut surface is left largely unprotected, but some readers may not know that.

Are you treating the cut ends with a wood preservative before fixing them down? If not the boards will rot from the ends and likely start to lift as they rot around the screws.

Paint on wood preservatives are available here in Oz in brush on and spray can forms and I would imagine that there is something equivalent available in the UK.

Regards,
Graeme
Hi Graeme
Yes. I spotted that the main areas of rot on the old baseboard were around the ends which had been cut - especially those which had been cut on the diagonal. I've been soaking every cut end in preservative - mostly twice, just to be sure.

Rik
------------------------
Peckforton Light Railway - Blog Facebook Youtube

User avatar
ge_rik
Administrator
Administrator
Posts: 7844
Joined: Sun Oct 25, 2009 10:20 pm
Location: Cheshire
Contact:

Re: Beeston Market is no more .......

Post by ge_rik » Wed Mar 12, 2025 7:41 am

I planned to cover the boards with (good quality - 15 year guaranteed) roofing felt today. But it rained last night. Annoyingly it wasn't forecast!!
The forecast for the next few days is showers so it looks like I'll have to keep nipping in and out covering and uncovering the boards until they dry out again.

Oh the joys of garden railway modelling ...... :?

Rik
------------------------
Peckforton Light Railway - Blog Facebook Youtube

User avatar
GTB
Driver
Driver
Posts: 1694
Joined: Sat Mar 05, 2011 2:46 pm
Location: Australia

Re: Beeston Market is no more .......

Post by GTB » Wed Mar 12, 2025 10:07 am

ge_rik wrote: Wed Mar 12, 2025 7:25 am Yes. I spotted that the main areas of rot on the old baseboard were around the ends which had been cut -
I noticed that as well, which prompted the question. I don't think it would be possible to add too much wood preservative.

It rained here half an hour ago, the first for a fortnight, but it's been too hot to work outside lately without risking heat stroke. It's all swings and roundabouts.........

Graeme

User avatar
GAP
Trainee Driver
Trainee Driver
Posts: 869
Joined: Sun Dec 23, 2012 10:34 pm
Location: Bundaberg QLD Australia
Contact:

Re: Beeston Market is no more .......

Post by GAP » Wed Mar 12, 2025 9:17 pm

GTB wrote: Wed Mar 12, 2025 10:07 am
ge_rik wrote: Wed Mar 12, 2025 7:25 am Yes. I spotted that the main areas of rot on the old baseboard were around the ends which had been cut -
I noticed that as well, which prompted the question. I don't think it would be possible to add too much wood preservative.

It rained here half an hour ago, the first for a fortnight, but it's been too hot to work outside lately without risking heat stroke. It's all swings and roundabouts.........

Graeme
When I was doing a renovation I was told by my builder that for decking you should never paint underneath.
The reason is that way the wood can "breathe" evidently painting can trap water inside and can increase the speed of rot as the wood can't "season".
Graeme
From the home of the Uppen Down Railway
https://ringbalin-light-railway.blogspo ... -page.html

User avatar
Old Man Aaron
Driver
Driver
Posts: 1141
Joined: Wed Oct 19, 2016 11:08 am
Location: Sunshine Coast QLD, Australia

Re: Beeston Market is no more .......

Post by Old Man Aaron » Tue Mar 18, 2025 8:14 am

Very good. :study: :thumbleft:

I quite like the stepped level for the copper mine. A detail rarely modelled and will set the yard apart.
Regards,
Aaron - Scum Class Works

User avatar
ge_rik
Administrator
Administrator
Posts: 7844
Joined: Sun Oct 25, 2009 10:20 pm
Location: Cheshire
Contact:

Re: Beeston Market is no more .......

Post by ge_rik » Wed Mar 19, 2025 4:18 pm

Boards now covered in felt.
IMG_4020.JPG
IMG_4020.JPG (740.64 KiB) Viewed 30058 times
IMG_4023.JPG
IMG_4023.JPG (1.43 MiB) Viewed 30058 times
Just waiting for the bitumen adhesive to dry before laying track

Rik
------------------------
Peckforton Light Railway - Blog Facebook Youtube

User avatar
philipy
Moderator
Moderator
Posts: 5956
Joined: Sun Jan 30, 2011 3:00 pm
Location: South Northants

Re: Beeston Market is no more .......

Post by philipy » Wed Mar 19, 2025 5:37 pm

Phew, that's a relief Rik, That looks almost exactly like mine did at that stage and I was always a bit worried/embarrassed about the wavy edges and visible black goo that showed! :lol: :lol:

However, it's looking good so far, can't wait to see the track going back down.
Philip

User avatar
ge_rik
Administrator
Administrator
Posts: 7844
Joined: Sun Oct 25, 2009 10:20 pm
Location: Cheshire
Contact:

Re: Beeston Market is ressurected .......

Post by ge_rik » Fri Mar 21, 2025 7:59 am

philipy wrote: Wed Mar 19, 2025 5:37 pm However, it's looking good so far, can't wait to see the track going back down.
Track-laying now well under way .....
IMG_4030.JPG
IMG_4030.JPG (1.71 MiB) Viewed 29763 times

However, what looks OK on paper doesn't always work in reality, so I've now got a couple more points on order.

The good news is I've now eliminated R1 points and somehow seem to have increased the amount of track, judging by how little I've now got left over to finish off the Copper Mine.

Rik
------------------------
Peckforton Light Railway - Blog Facebook Youtube

User avatar
ge_rik
Administrator
Administrator
Posts: 7844
Joined: Sun Oct 25, 2009 10:20 pm
Location: Cheshire
Contact:

Re: Beeston Market is no more .......

Post by ge_rik » Tue Mar 25, 2025 9:21 am

Would you travel 375 miles to pick up some secondhand track? I just did.

I needed around 5m of track to finish off the relaying. I was on the point of giving up finding some reasonably priced secondhand G gauge track on eBay when I changed my search terms for one last look. On the last page was a listing with a very reasonable starting price, but collection only from just outside London. There were no bidders and only an hour and a half until the auction ended. I placed an optmistic bid and then had to go out for the evening. When I returned, I discovered that not only had I won the auction, I got it for the starting price!

I calculated that, even when adding the cost of fuel to go and collect them, it was worth it. Do you agree?

£10.08 for:

5 x LGB 1200mm straights
2 x LGB 1200mm straights with badly damaged sleeper strips
4 x LGB 600mm straights
3 x LGB 450mm straights
1 x LGB 300mm straight
3 x Aristo large rad curves
4 x Aristo Med rad curves
3 x LGB R3 curves
4 x Bachmann R2 curves
Screenshot_2025-03-24-19-41-26-318_Edited.jpg
Screenshot_2025-03-24-19-41-26-318_Edited.jpg (359.1 KiB) Viewed 28746 times
Rik

BTW Six LGB 1200mm straights (in slightly better condition) I was watching went for £113 (plus p&p) just after I got mine.
------------------------
Peckforton Light Railway - Blog Facebook Youtube

Post Reply

Who is online

Users browsing this forum: No registered users and 1 guest