Page 6 of 11
Re: NWNG Railways No.1
Posted: Wed Nov 01, 2017 10:38 am
by River Lin
Hi all.
One ducket trying for fit.

- IMG_20171101_103603.jpg (65.19 KiB) Viewed 6476 times
David.
Re: NWNG Railways No.1
Posted: Wed Nov 01, 2017 10:48 am
by Peter Butler
Dis-heartening episode after all the effort but well worth starting fresh as you would always regret not doing so. Looking wonderful!
Re: NWNG Railways No.1
Posted: Wed Nov 01, 2017 1:07 pm
by bazzer42
They are looking nice coaches. I've been there a few times thinking I can neatly touch up...and I can't. Do I learn? Those new duckets have been a patient build I'm sure it will pay off.
Re: NWNG Railways No.1
Posted: Wed Nov 01, 2017 4:18 pm
by River Lin
Hi all.
Just finished cutting the 2 new sets of beading. Another 24 rounded corners he he.

- IMG_20171101_160725.jpg (62.03 KiB) Viewed 6451 times
Because i am planning to fit them after painting and fitting the duckets, i have made them full height.
David.
Re: NWNG Railways No.1
Posted: Wed Nov 01, 2017 5:41 pm
by tom_tom_go
The amount of time and energy you have spent on this coach is it going to live in a glass cabinet!
Re: NWNG Railways No.1
Posted: Wed Nov 01, 2017 10:54 pm
by River Lin
Hi Tom.
All my stock is made to be used.
David.
Re: NWNG Railways No.1
Posted: Wed Nov 01, 2017 10:54 pm
by tom_tom_go
Brave lad, well done so far.
Re: NWNG Railways No.1
Posted: Wed Nov 01, 2017 11:25 pm
by River Lin
I've not been called lad for a few years. And then some. Lol.
David.
Re: NWNG Railways No.1
Posted: Sat Nov 04, 2017 3:28 pm
by River Lin
Hi all.
New duckets and beading primed (3 coats) and painted.

- IMG_20171104_152405.jpg (69.94 KiB) Viewed 5910 times
Next job to paint the cream panels.
David.
Re: NWNG Railways No.1
Posted: Sat Nov 04, 2017 3:33 pm
by Peter Butler
Looks like a beautiful finish this time, you should be well pleased with that.
Re: NWNG Railways No.1
Posted: Sat Nov 04, 2017 4:12 pm
by River Lin
I am peter, but disappointed the first set didn't work out as planned.
David
Re: NWNG Railways No.1
Posted: Sun Nov 05, 2017 8:28 pm
by River Lin
Hi all
Started to glue the beading on to the duckets this evening. I am using araldite rapid Grant. (Quick drying epoxy).
I am starting on the sharp curve (top) first and letting it dry completely before moving down. Not a quick job i know but if i tried to do it all in one go i know i would get glue everywhere.

- IMG_20171105_201320.jpg (62.09 KiB) Viewed 5801 times
Probably take another two sessions to complete this one job.
David.
Re: NWNG Railways No.1
Posted: Sun Nov 05, 2017 8:31 pm
by River Lin
Just noticed how different the colour looks in different light.
David.
Re: NWNG Railways No.1
Posted: Sun Nov 05, 2017 8:49 pm
by Big Jim
Very nice David.
I know what you mean about light source and colours. Artificial light can have some very interesting effects on how our eyes see colours. Paint matching except in daylight can be a nightmare.
Re: NWNG Railways No.1
Posted: Mon Nov 06, 2017 5:33 pm
by Lonsdaler
David,
Your duckets are a work of art in themselves

and again you demonstrate the need for patience, as those overlays must have taken quite some time. Can't wait to see the finished article.

Re: NWNG Railways No.1
Posted: Wed Nov 08, 2017 8:26 pm
by River Lin
Hi all.
While waiting for paint and glue to cure on the duckets i have made a start on the coach underframe. The two points that stand out to me looking at photos 2 and 3 on page 1 of this thread are the rivets/bolts on the solebars and the fact that the solebars are set in slightly from the ends of the buffer beams. From the makers photo of the coach i have scaled up the relative distances of the four sets of 4 rivets and the pair of single rivets. Following other threads on this forum, there are obviously a few methods members use for adding rivet detail. I have previously done it in a way i have not seen before and have used it this time also.
After cutting two solebars 9mm by 3mm to appropriate length i marked out the relative positions of the rivets with pencil and punched with a steel scriber point. The next job was to drill through with a 1mm drill. Soft dressmakers pins were then cut to approx 3mm in length and superglued into the holes.

- IMG_20171108_194826.jpg (53.43 KiB) Viewed 5729 times
Completed solebars and buffer beams.

- IMG_20171108_194920.jpg (64.85 KiB) Viewed 5729 times
Closeup of rivet detail.
The buffer beams are made as a lamination of 3 pieces of 3mm by 3mm wood which has allowed me to include a 12mm x 3mm slot to take the square shaft of the Slaters chopper couplings that i use. The width of the slot allows the coupling to swing horizontally.
Re: NWNG Railways No.1
Posted: Sun Nov 12, 2017 5:41 pm
by River Lin
Hi all.
Before glueing the beading i felt it time to attach the First/Third transfers (IP Engineering). In the past i have had to do this after the beading has been applied and the coach sides painted, my Pickering brake for example, but this has proved to be a much easier task. It has been much easier to apply the transfers onto a flat surface than between beading strips.

- IMG_20171112_172528.jpg (61.5 KiB) Viewed 5665 times
Transfers applied.

- IMG_20171112_172557.jpg (68.27 KiB) Viewed 5665 times
Beading rested in place prior to gluing.
Re: NWNG Railways No.1
Posted: Sun Nov 12, 2017 10:35 pm
by LNR
Good to see this wonderful project drawing to an end. Can't wait to see the finished article.
Grant.
Re: NWNG Railways No.1
Posted: Mon Nov 13, 2017 12:03 am
by River Lin
Hi Grant.
Thanks for that. Beading to glue on and underframe to finish then its on with fitting out the inside. At the moment i am leaning towards oak or mahogany slatted seats in 3rd class and padded leather in 1st. :-)
D.
Re: NWNG Railways No.1
Posted: Mon Nov 13, 2017 12:07 am
by LNR
Having just discussed slatted seats up in projects, I know that yours will be individual slats with uniform gaps between!. I'm certain the result will be high class.
Grant.