Greetings Peeps! Been a few weeks since Ive done anything to the railway but back in business these last couple of days and the next stage is underway, namely the raised 'filcris' section. The photos show progress so far, all achieved quite quickly really, the filcris is a joy to work with, hopefully it proves to be relatively maintenance free too! Time, and running trains, will tell! On with the show....

Going beyond Hollycross station, the line will run onto a raised section, almost immediately crossing the main path to the house where I plan to put in a removable bridge. A bit of faffing around gave me the initial positioning of the main bridge supports.

These were built and put in a couple of days ago, securely set in Postfix. A couple of battens were fixed to them to ensure they stay in position relative to each other, both while being set up and the next stage to ensure no twisting out of line occured. I can report this proved its worth, filcris is great to work with, very easy to use, but it IS flexible! Onwards....

The photo above shows the junction for a branch which will eventually lead to the front of the house. From this point, the run out and back will be approximately 60 yards, and will require locos to work hard on the way back!

Standard crosshead screws were used, initially in pre-drilled holes, but I found the filcris accepts them without holes being drilled, it doesnt split, crack, bobble and screws will countersink themselves very easily and neatly, making construction fly along. Within a couple of hours, the first train was venturing onto the new bit of line, and Im pleased with progress. You will note, some realignment of the outer platform line is required as a result of not much proper planning!

The wagon was built with a view to filming. 2 rubber bands hold the camera in place against the bolster and away we go...Ahem....
