I managed to get out into the garden for a short while before the storm arrived in the late afternoon. A quick look round the six storage sidings in the shed.
The WIRL operations are coming together slowly. I need to standardize on the couplings on the rolling stock - its a bit of a mixed bunch at present with different types and coupling heights on different elements bought from evil Bay etc.
I am trying out the couplings that Rik B posted a while ago. And will then have to work out a reliable buffer so the trains can go forwards and backwards! Its a bit hit and miss (mostly miss) going backwards at present!
I am very happy this set of points, motors and switches all work well - the protection of the shed helps a lot.



