Page 1 of 1

SVLR - progress being made

Posted: Wed May 08, 2013 7:22 am
by tegfan railway
Image[/img]

I know I am probably doing this wrong, but its my railway and this is the way I decided to work. I have split my build into phases where I survey, lay the track, landscape, plant then ballast for each phase rather than laying all the track first. I am in the process of completing the Phase 1 green house loop. Track is the popular PECO SM32, it is laid on a combination of concrete blocks and cast concrete. I have used some miniature slow growing conifers, thymes, some small leaved shrubs whose names escape me and some mind your own business. Need to take a few weeks break in construction, phase 2 will commence in a few weeks.

Posted: Wed May 08, 2013 8:12 am
by Narrow Minded
Nice progress!
I can't see why you think you're "doing it wrong" - one of the golden rules for gaining momentum is to Get Something Running!, if it's running through a completed section then so much the better I'd say :D

Posted: Wed May 08, 2013 8:49 am
by steamie1
Arhh I think it looks great. When the connifers get to twice the size i.e. in two years time pull them out buy some new small ones to replace or change. errr most rolling stock even locos can be made to go round Peco 605 set track curves.....Looks lovely keep going.

Posted: Wed May 08, 2013 9:02 am
by tom_tom_go
Very scenic. Looks like a garden railway rather than just a railway garden.

Keep up the good work :)

Posted: Wed May 08, 2013 9:04 am
by DolwyddelanLightRail
That's coming along nicely! :D

Posted: Wed May 08, 2013 9:39 am
by Narrow Minded
steamie1:83205 wrote:When the connifers get to twice the size i.e. in two years time pull them out buy some new small ones to replace or change.
Or - keep pruning them and you'll effectively "Bonsai" them as well as creating proper shapes. I even have some Oak trees on the W&L that have been there for years which I grew from acorns, absolutely no need to keep uprooting and replacing stuff! ;)

Image

Posted: Wed May 08, 2013 11:07 am
by Gremlin
looking nice and tidy, not like a building site, will keep watching

Posted: Wed May 08, 2013 8:14 pm
by Andrew
A fantastic start, nice one! It'll look lovely with a train chugging round it.

All the best,

Andrew.

Posted: Mon Sep 16, 2013 11:16 pm
by METHSSNIFFER
Hows your railway going

Posted: Tue Sep 17, 2013 8:13 am
by steamie1
Lovely job!

Re: SVLR - progress being made

Posted: Tue Sep 17, 2013 5:32 pm
by andymctractor
tegfan railway:83201 wrote:
I know I am probably doing this wrong,
??????
Looks fine to me.
One mistake I made when I started out was to try and catch up too quickly with other members of our local group, some of whom had been garden railwaying for many years. Your method allows you to enjoy developing your railway at your own pace. When you get fed up of running up and down a short bit of track you will be encouraged to get on with the next phase. Also you will develop new skills as you go along and might come back and make changes to the earlier phases anyway.

Posted: Tue Sep 17, 2013 6:16 pm
by METHSSNIFFER
I found hebes incredible and can be trimmed to suit scale.
Watch out for your skyrocket they shoot up really quickly

Posted: Sun Dec 22, 2013 11:23 pm
by tegfan railway
METHSSNIFFER:88804 wrote:Hows your railway going
Progress has been quite slow, I can only really get things done during school holidays. Summer and half term I had other things needed doing so I was planning a push over Christmas. Saddly after a stint in hospital I am on light duties. I have an electric loco and some rolling stock to build so that should keep me happy. Will post updates once more progress is made.

Posted: Mon Dec 23, 2013 8:41 pm
by Big Jim
Light Duties are not a bad thing. I find a few weeks of nothing heavy means the collection of unbuilt kits goes down. I also think that a time away from a project can give you a bit of thinking time so when you do get back to it you know exactly what you want to do.

Posted: Mon Jan 06, 2014 2:20 pm
by tegfan railway
I am glad in a sense that I had a light duties ticket, since posting the weather went upside down. I wouldn't have been able to get any track laying done as the monsoon arrived and the ground was waterlogged! Anyway on the one dry day I was allowed out, we took the dog for a walk in the foothills of the brecon beacons at the top of the Swansea valley. I came across some old lime kilns a quarry and remains of a permanent way. When I got home I ordered a brace of Swift Sixteen tube wagons with the view to building a quarry section. They have not arrived yet, will post pictures as soon as I make a start along with pictures of the hopefully finished electric quarry shunter.

Posted: Wed Jan 08, 2014 10:07 pm
by jim@NAL
keep conafers in there pots they wont grown very big then iv done this and it works well