Post by steamgeorge » Tue Mar 26, 2019 7:30 pm

GTB wrote: Tue Mar 26, 2019 10:59 am
steamgeorge wrote: Mon Mar 25, 2019 4:32 pm Where is the branch going and where is it leaving the loop?
The branch will run further down the side of the flower bed to a yard with 3 loops and is an extension from the end of the s-bend shown in the photo. The steaming bay will be moved down to the end of the branch.

The junction with the main line oval is the wye, the branch being on the third leg. Using a wye for the junction means trains can leave the branch and run around the loop in either direction. Tender locos can be turned on the wye, so I won't need to build a turntable.

Regards,
Graeme
Thanks - I'm looking forward to seeing it completed.

User avatar
GTB
Driver
Driver
Posts: 1550
Joined: Sat Mar 05, 2011 2:46 pm
Location: Australia

Re: TVT - First Turnout and Infrastructure

Post by GTB » Thu Mar 12, 2020 8:47 am

A year later and the station extension is finally finished. Well as finished as it is likely to get, as I doubt it will ever get scenery installed....... 8)

I was out of things for a while late last year, but managed to order a box of track and some turnout making materials in late November. Nothing much happened until the new year, when I worked up enough energy to start building the turnouts and then painting the track while the weather was too hot to work outside.

By mid-February I had managed to finish the track and turnouts and my workspace was rapidly diminishing. The next step was erecting the steelwork and this time I had it cut to size, which was cheaper than having the full lengths delivered. The cut pieces fitted in the car boot and it also saved time and effort manipulating long bits of steel into the bandsaw.

The photo shows the bench top covered in turnouts and track, while the floor area had been further reduced by the steel stacked on sawhorses in the foreground.

Track Supports-19.jpg
Track Supports-19.jpg (140.31 KiB) Viewed 4276 times

A couple of weeks later and the steelwork has been fabricated and the first supports have been installed, in between rain storms. This time around the 40mm galv RHS is bolted to the retaining wall rather than sitting on a star picket and the wider deck means the cross beam needed a support brace.

Track Supports-21.jpg
Track Supports-21.jpg (285.85 KiB) Viewed 4276 times

Another week or two and the rest of the supports and the longitudinal angles have been installed.

Track Supports-23.jpg
Track Supports-23.jpg (280.86 KiB) Viewed 4276 times

Fitting the decking only took a couple of days, including cutting the bits to size. The decking is the same material as the rest of the track, 10mm thick Weathertex.

Track Supports-24.jpg
Track Supports-24.jpg (272.56 KiB) Viewed 4276 times

Painting was another matter, as the weather has been alternating between being so hot the paint dries on the brush, or too wet to paint. Eventually it was finished and track laying could start. This photo shows the new station extension in relationship to the wye junction on the mainline.

Track Supports-26.jpg
Track Supports-26.jpg (240.43 KiB) Viewed 4276 times

Track laying went quickly this time as all the turnouts and track were ready to go. This photo shows the amount of track laid on the first day, although it was a hot day. the curves into the station are finished and the track and turnouts for No. 1 road are complete. The turnouts for Nos. 2 and 3 roads are also in place at the steaming bay end, as well as the steaming bay. The van halfway down the yard was being used to check clearances and track joints.

Track Supports-27.jpg
Track Supports-27.jpg (326.67 KiB) Viewed 4276 times

The next day was going well and most of the track was in place by just after lunch. Then of course the track joiners ran out...... :roll: Luckily a quick phone call to Argyle and a packet of track joiners dropped into the letterbox just before lunch the next day. The last of the track was installed late yesterday afternoon (Wednesday), by which time it was too hot for a proper test run.

Track Supports-29.jpg
Track Supports-29.jpg (235.6 KiB) Viewed 4276 times

The track plan is fairly typical of VR branchline and NG terminal stations. A main line/platform road (No.1), a run around loop road (No.2) and a goods shed road (No.3), with a spur off No.3 road leading to the loco pit. It probably looks long to most people, but Nos.1 and 2 roads have to be long enough to clear ten bogie wagons, which is the maximum train length for the line. The track in the station is 1.2m off the ground, which is a convenient working height for me. There wasn't much choice anyway, as the block is steep and a ground level track is impractical, even if I was interested.

Today dawned clear and hot, so a morning run with the Fowler Motor Mule and a small work train to test the track laying was all that was attempted. The train is shown leaving the station and heading for the mainline.

The station track work and the operation of the mainline and wye junction were tested and worked as planned. So the next step will be a steam run on the weekend when the weather has sorted itself out again.

First run-8.jpg
First run-8.jpg (257.11 KiB) Viewed 4276 times

The final two photos. show the mainline as it is now, as I realised no photos of the mainline loop in finished condition were shown in the previous instalments of this saga.

The first is taken looking south and the junction to the station is out of shot to the right.

Track Supports-31.jpg
Track Supports-31.jpg (286.13 KiB) Viewed 4276 times

The second is taken facing the north and the junction is visible in the distance just past the truss bridge on the right. The angle of the fence compared to the roof line of next door's shed shows what the ground contours are like.

Track Supports-32.jpg
Track Supports-32.jpg (228.8 KiB) Viewed 4276 times

........ and I've got my bench back. ;)

Regards,
Graeme

User avatar
LNR
Driver
Driver
Posts: 1533
Joined: Sat Feb 27, 2016 5:26 am
Location: Australia

Re: TVT - First Turnout and Infrastructure

Post by LNR » Thu Mar 12, 2020 9:01 am

Top work as usual Graeme, should make it a bit more enjoyable raising steam at that height. Your going to be pruning soon by the looks of the Pittosporum. The tree inside the loop looks like it needs a drink.
Grant.
PS if you heard a loud bang, that was me getting a brainwave that might solve my problem!

User avatar
philipy
Moderator
Moderator
Posts: 5033
Joined: Sun Jan 30, 2011 3:00 pm
Location: South Northants

Re: TVT - First Turnout and Infrastructure

Post by philipy » Thu Mar 12, 2020 12:29 pm

Amazing work Graeme, well done.
Philip

User avatar
Andrew
Moderator
Moderator
Posts: 3247
Joined: Tue Jul 03, 2012 1:33 pm
Location: Bristol, UK
Contact:

Re: TVT - First Turnout and Infrastructure

Post by Andrew » Thu Mar 12, 2020 1:18 pm

That looks fantastic - I imagine derailments are a rare event indeed on your line?!

I like how you've gone for a track layout based on the real thing - it's something I don't think I give enough thought to. Those two loops will give you fantastic flexibility when you're operating.

All the best,

Andrew.

User avatar
Mitch stack
Trainee Fireman
Trainee Fireman
Posts: 231
Joined: Tue Sep 05, 2017 9:43 am
Location: Australia

Re: TVT - First Turnout and Infrastructure

Post by Mitch stack » Fri Mar 13, 2020 11:26 am

nice work graeme, i think we need to do a steam up one day.

mitch
Mitch - Cockatoo Creek Tramway

User avatar
Tropic Blunder
Trainee Fireman
Trainee Fireman
Posts: 188
Joined: Sun Dec 06, 2015 4:02 am
Location: Australia
Contact:

Re: TVT - First Turnout and Infrastructure

Post by Tropic Blunder » Sat Mar 14, 2020 1:26 am

Clean, crisp and precise. Just like all your other work, excellent work Graeme it looks a treat :thumbup:
Jake

Image

User avatar
GTB
Driver
Driver
Posts: 1550
Joined: Sat Mar 05, 2011 2:46 pm
Location: Australia

Re: TVT - First Turnout and Infrastructure

Post by GTB » Sat Mar 14, 2020 6:13 am

Andrew wrote: Thu Mar 12, 2020 1:18 pm That looks fantastic - I imagine derailments are a rare event indeed on your line?!
Not as rare as I'd like. The mainline is usually OK, unless I miss some debris on the rails.

The station turnouts still need some final tuning and while the rolling stock used during the test run ran fine, the loco had some difficulties.

I thought I'd already reprofiled the loco wheels, but turned out I hadn't. For reasons I've never discerned, Roundhouse use different wheel profiles for the driving wheels and the non-powered wheels on 45mm gauge locos. Their driving wheels have never caused me any problems, but I spent this morning turning the tender and leading/trailing truck wheels on the black Baldwin to the standard G1MRA profile I use.

The sun came out this afternoon and I forced myself to do a test run, as you do. No problems with the black Baldwin anywhere on the track now..... ;)

Graeme

Post Reply