The Potters Orchid Railway

A place for the discussion of garden railways and any garden style/scale portable and/or indoor layouts
User avatar
Old Man Aaron
Trainee Driver
Trainee Driver
Posts: 807
Joined: Wed Oct 19, 2016 11:08 am
Location: Sunshine Coast QLD, Australia

Re: The Potters Orchid Railway

Post by Old Man Aaron » Tue Sep 08, 2020 12:56 am

That greenery really compliments the rock-work well. Is the signalling at this end of the line now complete?
Hydrostatic Dazza wrote: Mon Sep 07, 2020 11:38 pm "Its a Bundy Fowler"
I can understand Wallace's excitement over the Bundy, having been of the same mind when I bought mine. 8)

Looks a great time (SPADS aside) was had running. Hope no clearance issues crept through?

Regards,
Aaron
Regards,
Aaron - Scum Class Works

User avatar
Hydrostatic Dazza
Driver
Driver
Posts: 1167
Joined: Tue Sep 19, 2017 4:17 am
Location: Brisbane
Contact:

Re: The Potters Orchid Railway

Post by Hydrostatic Dazza » Tue Sep 08, 2020 2:44 am

Old Man Aaron wrote: Tue Sep 08, 2020 12:56 am That greenery really compliments the rock-work well. Is the signalling at this end of the line now complete?
Hydrostatic Dazza wrote: Mon Sep 07, 2020 11:38 pm "Its a Bundy Fowler"
I can understand Wallace's excitement over the Bundy, having been of the same mind when I bought mine. 8)

Looks a great time (SPADS aside) was had running. Hope no clearance issues crept through?

Regards,
Aaron

Thanks
If all goes to plan, in 6 months time a lot more greenery should cover most if not all of the sugar cane mulch and a lot of the intended greenery will be running over many rock faces and over the back ground block wall.
Signalling is now fully operational if desired and is mostly complete at the Orchid Loop end of the line but for a one starter's base area not yet filled in which is a little job to do in the afternoons as the days get longer and there is the permanent water proof battery box to be fitted next to the lever frame. Another small job to fill in spare moments. Also the final cover for the lever frame and the Pendle Valley signal box, Midi station kits to build (I have never attempted resin buildings before) and it will be placed in the V of the Orchid House loop. There is actually an imprint for it's base in the concrete.
The big grunt is now to build the cuttings, rock and hill over the tunnel at Potters Junction. This will fill in the next 4-6 weeks.Then plant it out so they are underway for the summer. There are then the final buildings. The actual Potters Junction station yard and buildings will left to titter along into 2021 and 2022. I need to get back to the Red Room and work on my coal fired loco build.
The Bundy Fowler is a new loco my good friend Chris recently bought. He is also a driver at the Mary Valley Rattler.
One little project is to extend one of the sidings by 800mm - 1000mm to ease a pathway pinch point when some one is servicing their loco there. Discovering such things is what the test run of the weekend was for.
The paths, shelter awning and more gardens against the back fence is also a big push to be done before the new year.
Last edited by Hydrostatic Dazza on Tue Sep 22, 2020 11:15 pm, edited 1 time in total.
Cheers from Dazza, The Hydrostatic Lubricator 8)
The chances of finding out what’s really going on in the universe are so remote, the only thing to do is hang the sense of it and keep yourself occupied. Douglas Adams

User avatar
FWLR
Driver
Driver
Posts: 4290
Joined: Sat Aug 05, 2017 9:45 am
Location: Preston, Lancashire, UK

Re: The Potters Orchid Railway

Post by FWLR » Tue Sep 08, 2020 7:55 am

Looking fantastic Dazza. You and MAM have worked so hard to bring us what is a superb line. The greenery is looking brilliant and those Bonsai trees MAM has cultured work so well. They look like they have been there well before the line was built. Just like it would have been in real life maybe...

Always look forward to seeing your brilliant photos too, they kind of whisk me away to a different world...

User avatar
Hydrostatic Dazza
Driver
Driver
Posts: 1167
Joined: Tue Sep 19, 2017 4:17 am
Location: Brisbane
Contact:

Re: The Potters Orchid Railway

Post by Hydrostatic Dazza » Tue Sep 08, 2020 10:29 pm

FWLR wrote: Tue Sep 08, 2020 7:55 am Looking fantastic Dazza. You and MAM have worked so hard to bring us what is a superb line. The greenery is looking brilliant and those Bonsai trees MAM has cultured work so well. They look like they have been there well before the line was built. Just like it would have been in real life maybe...

Always look forward to seeing your brilliant photos too, they kind of whisk me away to a different world...
We are pleased it is of enjoyment for others. We are most certainly enjoying the journey. We have never done this before, just SMT mag, forums and FB for this. When most of the major work is completed I want to be back in the Red Room doing metal work working on my coal fired loco and move onto the 5" gauge locos.
Cheers from Dazza, The Hydrostatic Lubricator 8)
The chances of finding out what’s really going on in the universe are so remote, the only thing to do is hang the sense of it and keep yourself occupied. Douglas Adams

User avatar
Hydrostatic Dazza
Driver
Driver
Posts: 1167
Joined: Tue Sep 19, 2017 4:17 am
Location: Brisbane
Contact:

Re: The Potters Orchid Railway

Post by Hydrostatic Dazza » Tue Sep 15, 2020 10:09 pm

The pottery contract to the in house potter is almost complete. Liquid nails in use. The big push with the last major terra forming operation is underway at the 'Potters Orchid Railway'.

Image

Image

Image

Image

Image

Image
Cheers from Dazza, The Hydrostatic Lubricator 8)
The chances of finding out what’s really going on in the universe are so remote, the only thing to do is hang the sense of it and keep yourself occupied. Douglas Adams

User avatar
Peter Butler
Driver
Driver
Posts: 5243
Joined: Sun Sep 09, 2012 10:33 pm
Location: West Wales

Re: The Potters Orchid Railway

Post by Peter Butler » Tue Sep 15, 2020 10:33 pm

Very nice indeed, good, warm colour contrast with the natural stone. What a team!!!!
The best things in life are free.... so why am I doing this?

User avatar
Hydrostatic Dazza
Driver
Driver
Posts: 1167
Joined: Tue Sep 19, 2017 4:17 am
Location: Brisbane
Contact:

Re: The Potters Orchid Railway

Post by Hydrostatic Dazza » Tue Sep 15, 2020 10:47 pm

The braces removed this morning for the reveal.
Due to a degree of unpredictability of the ceramic shrinkage post firing and if we were doing this again I would have the portals to hand first and build the tunnel concrete form work to fit the portals. However for us, it is a garden railway, not a fine scale model railway. A wee bit of black paint and a few glasses of red, all is sweet. The big rocks have to be hurled about again and concrete laid for them to be hurled back into place for a good foundation, as done be before at the end of the line. I have two weekends free before I have a big four days in a row on full size steam at the Mary Valley Rattler. Living the dream with a good lass.


Image

Image
Last edited by Hydrostatic Dazza on Tue Sep 22, 2020 11:27 pm, edited 2 times in total.
Cheers from Dazza, The Hydrostatic Lubricator 8)
The chances of finding out what’s really going on in the universe are so remote, the only thing to do is hang the sense of it and keep yourself occupied. Douglas Adams

User avatar
Hydrostatic Dazza
Driver
Driver
Posts: 1167
Joined: Tue Sep 19, 2017 4:17 am
Location: Brisbane
Contact:

Re: The Potters Orchid Railway

Post by Hydrostatic Dazza » Tue Sep 15, 2020 10:53 pm

Peter Butler wrote: Tue Sep 15, 2020 10:33 pm Very nice indeed, good, warm colour contrast with the natural stone. What a team!!!!
Thanks. MAM is enjoying adding her skills to the project and much fun. She is very much involved. She is still to finish off her loco but has started on the cab and tank plate work and is also keen for a string of slate wagons.
If all goes well, other than the major signaling work which will drift into 2021 or 2022 then most of the grunt will be done by new year. Then it is fun details and back to the Red Room and metal work on my coal fired loco build. I am a metal worked at heart.
Cheers from Dazza, The Hydrostatic Lubricator 8)
The chances of finding out what’s really going on in the universe are so remote, the only thing to do is hang the sense of it and keep yourself occupied. Douglas Adams

User avatar
philipy
Moderator
Moderator
Posts: 5084
Joined: Sun Jan 30, 2011 3:00 pm
Location: South Northants

Re: The Potters Orchid Railway

Post by philipy » Wed Sep 16, 2020 6:21 am

Hydrostatic Dazza wrote: Tue Sep 15, 2020 10:47 pm if we were doing this again I would have the portals to hand first and build the tunnel concrete form work to fit the portals.
I find it's often a 'chicken and egg' thing when needing to fit bits together like that, and hindsight is a wonderful thing. The end result looks good though, whichever way round.
Philip

User avatar
FWLR
Driver
Driver
Posts: 4290
Joined: Sat Aug 05, 2017 9:45 am
Location: Preston, Lancashire, UK

Re: The Potters Orchid Railway

Post by FWLR » Wed Sep 16, 2020 10:17 am

Your Lass is fantastic Dazza. We are so lucky to have wonderful people in our lives aren't we.

The walk bridge is looking superb and is just so right for your absolutely wonderful line. You will be able to enjoy many hours with MAM and friends for many years to come on it.

User avatar
Hydrostatic Dazza
Driver
Driver
Posts: 1167
Joined: Tue Sep 19, 2017 4:17 am
Location: Brisbane
Contact:

Re: The Potters Orchid Railway

Post by Hydrostatic Dazza » Wed Sep 16, 2020 10:07 pm

The Potters Orchid Railway's senior management went into action last night. The 920mm siding extension was poured, 60kg mixed in a barrow by the head grafter and troweled by MAM. (POR board chair and many other executive positions) A sizeable ash pit is included so this extension can be used as a steaming bay. All was keyed with 1/4" galv rod in with Concremate and two 1/4" galv rods that run under the ash pit for reinforcement. The head grafter will soon realise his long time dream to have a small cactus garden in the garden railway. This will be next to the extension. Head horticulturist and POR chair person is researching the correct soil types to be used.

Image

Image

Image
Cheers from Dazza, The Hydrostatic Lubricator 8)
The chances of finding out what’s really going on in the universe are so remote, the only thing to do is hang the sense of it and keep yourself occupied. Douglas Adams

User avatar
FWLR
Driver
Driver
Posts: 4290
Joined: Sat Aug 05, 2017 9:45 am
Location: Preston, Lancashire, UK

Re: The Potters Orchid Railway

Post by FWLR » Thu Sep 17, 2020 6:22 am

I am sure with MAM's researching you will have a cactus garden that will be a joy to see Dazza. You do have some very excellent ideas to have an railway line to be admired. I do anyway... :thumbright:

User avatar
Old Man Aaron
Trainee Driver
Trainee Driver
Posts: 807
Joined: Wed Oct 19, 2016 11:08 am
Location: Sunshine Coast QLD, Australia

Re: The Potters Orchid Railway

Post by Old Man Aaron » Thu Sep 17, 2020 6:27 am

One can never have too much siding space on a garden line. :thumbright:
Regards,
Aaron - Scum Class Works

User avatar
Hydrostatic Dazza
Driver
Driver
Posts: 1167
Joined: Tue Sep 19, 2017 4:17 am
Location: Brisbane
Contact:

Re: The Potters Orchid Railway

Post by Hydrostatic Dazza » Thu Sep 17, 2020 9:54 pm

The workshop lads sorted the dead O ring in MAM's safety so the constant leaking whisper is gone. Test steaming with 12 axles on the hook, 34 mins and then 37 mins actual moving time, 30 psi, chugging at a peaceful and realistic speed. Slartibartfast placed the stone bridge in place to sort the rock work plan at Potters Junction, but he was muttering moans about the restricted space.

Image

Image

Image
Last edited by Hydrostatic Dazza on Tue Sep 22, 2020 10:27 pm, edited 1 time in total.
Cheers from Dazza, The Hydrostatic Lubricator 8)
The chances of finding out what’s really going on in the universe are so remote, the only thing to do is hang the sense of it and keep yourself occupied. Douglas Adams

User avatar
FWLR
Driver
Driver
Posts: 4290
Joined: Sat Aug 05, 2017 9:45 am
Location: Preston, Lancashire, UK

Re: The Potters Orchid Railway

Post by FWLR » Fri Sep 18, 2020 8:04 am

That does look tight Dazza....

User avatar
Hydrostatic Dazza
Driver
Driver
Posts: 1167
Joined: Tue Sep 19, 2017 4:17 am
Location: Brisbane
Contact:

Re: The Potters Orchid Railway

Post by Hydrostatic Dazza » Fri Sep 18, 2020 9:28 pm

FWLR wrote: Fri Sep 18, 2020 8:04 am That does look tight Dazza....
Major work in this area has begun, poured a new footing for the block wall to move it out and give more room for the bridge. Creative ideas are flowing. I will not be building another garden railway but I have sure learnt a lot and would do a lot differently but that is the journey eh.
Cheers from Dazza, The Hydrostatic Lubricator 8)
The chances of finding out what’s really going on in the universe are so remote, the only thing to do is hang the sense of it and keep yourself occupied. Douglas Adams

User avatar
FWLR
Driver
Driver
Posts: 4290
Joined: Sat Aug 05, 2017 9:45 am
Location: Preston, Lancashire, UK

Re: The Potters Orchid Railway

Post by FWLR » Sat Sep 19, 2020 8:01 am

Hydrostatic Dazza wrote: Fri Sep 18, 2020 9:28 pm
FWLR wrote: Fri Sep 18, 2020 8:04 am That does look tight Dazza....
Major work in this area has begun, poured a new footing for the block wall to move it out and give more room for the bridge. Creative ideas are flowing. I will not be building another garden railway but I have sure learnt a lot and would do a lot differently but that is the journey eh.
It sure is Dazza.
I have learnt so much since my endeavours in garden railway, but mistakes are still made, thankfully though, not major ones.....

User avatar
Hydrostatic Dazza
Driver
Driver
Posts: 1167
Joined: Tue Sep 19, 2017 4:17 am
Location: Brisbane
Contact:

Re: The Potters Orchid Railway

Post by Hydrostatic Dazza » Sat Sep 19, 2020 9:36 pm

The civil engineers were in action at the Potters Orchid Railway, however some uncivilised mutters frequently echoed over the landscape. Block wall alignment changed to fit and protect the stone arch bridge. Rocks were heaved about , contemplation, more heaving and more contemplation. More grunts, then the rocks were moved aside, concrete foundation mixed and poured. 100kg of ready mix in mixed in the barrow. Rock heaved back into place. The last big push on rock work is on, using up all left over rock available. We hope it all looks OK after a few Reds in the evening moon light.

Image

Image

Image

Image

Image
Last edited by Hydrostatic Dazza on Mon Sep 21, 2020 10:04 pm, edited 3 times in total.
Cheers from Dazza, The Hydrostatic Lubricator 8)
The chances of finding out what’s really going on in the universe are so remote, the only thing to do is hang the sense of it and keep yourself occupied. Douglas Adams

User avatar
Hydrostatic Dazza
Driver
Driver
Posts: 1167
Joined: Tue Sep 19, 2017 4:17 am
Location: Brisbane
Contact:

Re: The Potters Orchid Railway

Post by Hydrostatic Dazza » Sat Sep 19, 2020 9:38 pm

The POR's head horticulturist was preparing the Cactus garden. The POR's marketing director believes this will be a good addition to the attractions for tourists and passengers. The real reason is the head grafter (Captain Plod) always wanted a cute cactus garden.

Image

Image
Last edited by Hydrostatic Dazza on Mon Sep 21, 2020 10:54 pm, edited 1 time in total.
Cheers from Dazza, The Hydrostatic Lubricator 8)
The chances of finding out what’s really going on in the universe are so remote, the only thing to do is hang the sense of it and keep yourself occupied. Douglas Adams

User avatar
FWLR
Driver
Driver
Posts: 4290
Joined: Sat Aug 05, 2017 9:45 am
Location: Preston, Lancashire, UK

Re: The Potters Orchid Railway

Post by FWLR » Sun Sep 20, 2020 8:00 am

Those cacti will look really nice when they have aged a bit Dazza. MAM is great at her biology isn't she..

Post Reply

Who is online

Users browsing this forum: No registered users and 2 guests