Uncovering the South Weston Railway.

What is your latest project?
Post Reply
callumk5

Uncovering the South Weston Railway.

Post by callumk5 » Sat Mar 10, 2012 7:44 pm

Today, after five years or so of inactivity, the SWR saw movement once again! The track was covered in grass, moss, twigs, pine cones, and all sorts of detritus which had to be cleared very labouriously by hand. That said, the line has weathered superbly, and the moss growth (where it hasn't grown out of control) looks divine!
Image
Here is No.4 (Wigeon) idling in the sunshine at Park Hall before tackling the severe grade on the way to Flange Halt.
Image
On arrival at Flange Halt. Eventually No.4 managed 2 return trips without too much de-railing or pushing from the big hand in the sky.

Image
More updates to follow when the line is back in full commission.

Image

User avatar
Sir Clothem Cap
Driver
Driver
Posts: 1707
Joined: Sun Sep 26, 2010 8:45 pm
Location: Hampshire
Contact:

Post by Sir Clothem Cap » Sun Mar 11, 2012 9:57 am

That is a real testament to peco track that its survived during the resting period. The rapier look brill.

User avatar
TheChestnutLine
Trainee Fireman
Trainee Fireman
Posts: 208
Joined: Fri Feb 25, 2011 10:53 am
Location: 'Up North'

Re: Uncovering the South Weston Railway.

Post by TheChestnutLine » Sun Mar 11, 2012 12:42 pm

callumk5:67769 wrote:
Image
More updates to follow when the line is back in full commission.

Image
Your lines got a really nice run down look :) Would you be able to tell me what make the two wagons are in the foreground of the last picture?
Thanks
James

User avatar
sstjc
Fireman
Fireman
Posts: 442
Joined: Mon Dec 22, 2008 10:47 am
Location: Faversham Kent
Contact:

Post by sstjc » Sun Mar 11, 2012 12:45 pm

I think its also testament to the construction of the track base..... How did you do it please.

Thanks

Barry
Regards
Barry

www.5inchrail.com

callumk5

Post by callumk5 » Sun Mar 11, 2012 2:10 pm

Thanks for the comments folks  :)

Bryan- the tract is still perfect. I'v always thought Peco track was virtually indestructible, and even the point blades move freely and positively (once frogs were cleaned out etc).

James- the wagons in that picture are a Newdigate resin bodied box van (no longer available I believe?), and an IP five plank open. Both made during the first flush of SWR activity.

Barry- I consider myself very lucky the foundations have survived so well! We dug out the foundations to about 6", then filled the bottom with wet cement and laid 6" Thermalite blocks laid on their sides and attached the track with a combination of screws and masonry nails. Despite initial fears the frost hasn't affected the integrity of the blocks and it's all still very solid to walk on. The plan is to fill around the blocks with loose gravel/slate and ballast the track with a gravel/sand/cement mix.

Post Reply

Who is online

Users browsing this forum: No registered users and 1 guest