Slate quarry layout a winter project!
-
Narrow Minded
-
METHSSNIFFER
Hi NM Im making it portable maybe with the thought of exhibiting. It is a two level affair running live steam on top level and electric on bottom level bottom level being the underground workings. Ive just purchased a lima shunter which will be stripped down and converted to a typical quarry battery loco.
- 90733
- Driver

- Posts: 1954
- Joined: Wed Dec 16, 2009 6:17 pm
- Location: West Yorkshire
- Contact:
Cool, that will be brilliantMETHSSNIFFER:44908 wrote:Hi NM Im making it portable maybe with the thought of exhibiting. It is a two level affair running live steam on top level and electric on bottom level bottom level being the underground workings. Ive just purchased a lima shunter which will be stripped down and converted to a typical quarry battery loco.
Thanks
Jack
Jack
- Sir Clothem Cap
- Driver

- Posts: 1707
- Joined: Sun Sep 26, 2010 8:45 pm
- Location: Hampshire
- Contact:
Who is online
Users browsing this forum: No registered users and 2 guests