decent weather (at first)
the resident Aristocraft Critter

new bridge

me good old shays first run in a while

though some track aliment issues where discovered when it tried to go through the tunnel

tracks not so perfect after all is it Allan
:Itll go through, just give this portal a tug!:

a very long train was assembled

all of Allans frieght stock with ease

the spark arrester is open to allow it to fit through the tunnel


the side of a shay know-one ever photographs




The trainbwas then split in half, the Critter took 1 half and the stainz took the other.




My Jack


the run highlighted many faults in the track which Allan repaired as Jack ran round.


a quick shed visit

Hmmm steamy!

back of the yard.


not even torrential rain can stop Jack!

An empty yard, save for my tram.

