Post by Marquis DeCarabas » Mon Jul 04, 2011 1:40 pm

hussra:55624 wrote: Beidreirin
Ple mae'r bren eirinen, ynte? ;)

Looking very nice Richard - what are your curve radii?

User avatar
hussra
Trainee Driver
Trainee Driver
Posts: 872
Joined: Tue Jul 28, 2009 2:06 pm

Post by hussra » Mon Jul 04, 2011 1:51 pm

Marquis DeCarabas:55650 wrote:Looking very nice Richard - what are your curve radii?
I'm quite pleased with how it looks so far. The curve on the crossing is five foot radius - at the other end of the veg patch it's a little tighter briefly, around 4 foot.

The first and third photos show the plum tree.
Richard Huss
in sunny Solihull

User avatar
hussra
Trainee Driver
Trainee Driver
Posts: 872
Joined: Tue Jul 28, 2009 2:06 pm

Post by hussra » Mon Jul 04, 2011 10:57 pm

A bit of fun yesterday evening.

<object width="480" height="390"><param name="movie" value="http://www.youtube.com/v/DyoJ3PsUExo?ve ... ram><param name="allowFullScreen" value="true"></param><param name="allowscriptaccess" value="always"></param><embed src="http://www.youtube.com/v/DyoJ3PsUExo?ve ... n_GB&rel=0" type="application/x-shockwave-flash" width="480" height="390" allowscriptaccess="always" allowfullscreen="true"></embed></object>
Richard Huss
in sunny Solihull

James-Buzz

Post by James-Buzz » Sat Jul 16, 2011 12:24 pm

Looking good, are those potatoes your growing?

User avatar
hussra
Trainee Driver
Trainee Driver
Posts: 872
Joined: Tue Jul 28, 2009 2:06 pm

Post by hussra » Sat Jul 16, 2011 8:50 pm

James-Buzz:56378 wrote:Looking good, are those potatoes your growing?
Indeed - the view of the line along the top straight has been changing rapidly over the last week or two!
Richard Huss
in sunny Solihull

User avatar
hussra
Trainee Driver
Trainee Driver
Posts: 872
Joined: Tue Jul 28, 2009 2:06 pm

Post by hussra » Fri Sep 09, 2011 9:11 pm

Just a note to say that yes, I am still here and some progress is being made.

Our Rector retired at the end of July and as both Churchwarden and Reader I and my colleagues seem to be exceedingly busy just now trying to keep three places of worship going. The craziest phase should be drawing towards a close now as we complete the Parish Profile but railway things have had to take the back burner for a period.

That said, the first set of points for the first station have been built (and, it seems, work OK!) and another set is under way. Here is the rough mock-up of how the station fits in:

Image

Image

Image

Image
Richard Huss
in sunny Solihull

User avatar
hussra
Trainee Driver
Trainee Driver
Posts: 872
Joined: Tue Jul 28, 2009 2:06 pm

Post by hussra » Wed Apr 25, 2012 7:49 pm

A while since anything was reported from the EHLR. Waiting for simultaneous appearance of spare time and tolerable weather, but meanwhile sufficient pointwork has been constructed for the 1st passing loop & siding. Also the (very important) garden bench to go alongside said loop has been rebuilt in the manner of grandfather's axe.

One of this winter's happenings on the Talyllyn Railway has been the removal of No. 5B points at Quarry Siding - the slightly crummy stub trap points, removed as part of the shed project there. A suitable offcut of Peco track provides the wherewithal for the EHLR's tribute.

Image

Image

Image

Hopefully the next update may show some actual 2012 construction in the garden...
Richard Huss
in sunny Solihull

User avatar
hussra
Trainee Driver
Trainee Driver
Posts: 872
Joined: Tue Jul 28, 2009 2:06 pm

Post by hussra » Sat May 12, 2012 9:29 pm

Well, a little more trackbed got built today - about four and a half feet, with the same again part done and awaiting further supplies. This is where the trackbed widens out into the first station & loop, pointwork just loosely placed in position to give the general idea.

Image

Image

Image

Image
Richard Huss
in sunny Solihull

User avatar
Dr. Bond of the DVLR
Retired Director
Retired Director
Posts: 4533
Joined: Tue Jun 09, 2009 9:43 pm
Location: Suffolk
Contact:

Post by Dr. Bond of the DVLR » Sat May 12, 2012 10:14 pm

Brilliant! Looks like it will be quite a large station then, whats the proposed siding arranegemtn?
Image
The railway which people forgot
(to build)

User avatar
hussra
Trainee Driver
Trainee Driver
Posts: 872
Joined: Tue Jul 28, 2009 2:06 pm

Post by hussra » Sat May 12, 2012 10:46 pm

Passing loop and one siding (with trap points in memory of those at Quarry Siding); single platform adjacent to the path. The September post will give the idea, perhaps. Not so very big really - siding space here a little limited by desire to retain the nearby bench (convenient sitting place when steaming up - all timber replaced since the Sept photo!), hope to fit more in at the other station on the opposite side of the garden.

All points on hand levers, I'm sure the inspector will have a fit.
Richard Huss
in sunny Solihull

User avatar
hussra
Trainee Driver
Trainee Driver
Posts: 872
Joined: Tue Jul 28, 2009 2:06 pm

Post by hussra » Mon May 14, 2012 7:38 pm

Some photos from yesterday - got the pointwork laid out and connected up at this end of the station, followed by some testing.

Image

Image

Image

Image

Image
Richard Huss
in sunny Solihull

User avatar
Dr. Bond of the DVLR
Retired Director
Retired Director
Posts: 4533
Joined: Tue Jun 09, 2009 9:43 pm
Location: Suffolk
Contact:

Post by Dr. Bond of the DVLR » Mon May 14, 2012 8:11 pm

It looks like it will look great when done!
Image
The railway which people forgot
(to build)

DVT Dweller

Post by DVT Dweller » Mon May 14, 2012 8:43 pm

Sorry Richard,

I've completely neglected your thread. The bridge is looking fantastic. It's nice to see things are progressing and before you know it you'll soon have a decent run laid. That retaining wall looks good, I've been thinking about getting some to hide the blocks on some of my raised sections. Keep plugging away fella its looking great so far.

User avatar
hussra
Trainee Driver
Trainee Driver
Posts: 872
Joined: Tue Jul 28, 2009 2:06 pm

Post by hussra » Tue May 15, 2012 12:50 pm

DVT Dweller:70800 wrote:The bridge is looking fantastic. It's nice to see things are progressing and before you know it you'll soon have a decent run laid. That retaining wall looks good, I've been thinking about getting some to hide the blocks on some of my raised sections. Keep plugging away fella its looking great so far.
Thank you both for the encouraging words. Steve, your VoR would of course look right at home on the bridge! Must organise some handrails for it some time.

The Cain Howley retaining walls are great, I have a little more in the shed awaiting attention. Hope to get the next section of this station finished off this week if possible. You'll notice in the distance the hole cut in the trellis for the line to go through.
Richard Huss
in sunny Solihull

User avatar
hussra
Trainee Driver
Trainee Driver
Posts: 872
Joined: Tue Jul 28, 2009 2:06 pm

Post by hussra » Wed May 16, 2012 6:27 pm

Just a little taster today - checking clearances and alignments for the line as it exits the station at t'other end. Quite pleased how this should end up looking, a bit of motivation to move forward with the trackbed.

Image

Image

Image

Image
Richard Huss
in sunny Solihull

User avatar
hussra
Trainee Driver
Trainee Driver
Posts: 872
Joined: Tue Jul 28, 2009 2:06 pm

Station coming together a bit more now

Post by hussra » Sat May 26, 2012 9:52 pm

A few photos of the station area this evening - a some tweaking still to do before fixing down, but progress all the same.

Image

Image

Image

Image
Richard Huss
in sunny Solihull

User avatar
Steven.T
Fireman
Fireman
Posts: 410
Joined: Sun Mar 13, 2011 5:56 pm
Location: Stockton

Post by Steven.T » Sat May 26, 2012 10:16 pm

Looks great! Will be even better after some oil has been dumped all over it along with nature taking its course! :)
Cheers,
Steven

User avatar
hussra
Trainee Driver
Trainee Driver
Posts: 872
Joined: Tue Jul 28, 2009 2:06 pm

Post by hussra » Sat May 26, 2012 10:42 pm

Very true - very stark just now, but enjoying a line that is around 3x longer than a couple of weeks ago (when you include sidings), and for the first time has pointwork, too!
Richard Huss
in sunny Solihull

User avatar
Dr. Bond of the DVLR
Retired Director
Retired Director
Posts: 4533
Joined: Tue Jun 09, 2009 9:43 pm
Location: Suffolk
Contact:

Post by Dr. Bond of the DVLR » Sun May 27, 2012 7:52 am

Lovely flowing lines! Well done!
Image
The railway which people forgot
(to build)

User avatar
hussra
Trainee Driver
Trainee Driver
Posts: 872
Joined: Tue Jul 28, 2009 2:06 pm

Post by hussra » Tue Jun 19, 2012 3:33 pm

A bit of a mishap at the weekend - leading to some additional precautions.

Image

Hopefully this will help keep the railway inspector happy when he finally makes his visit. (Apologies for the poor image quality from the phone.)