Elmdon Heath Light Railway (was EHLR: A small start)

A place for the discussion of garden railways and any garden style/scale portable and/or indoor layouts
Post Reply
User avatar
hussra
Trainee Driver
Trainee Driver
Posts: 872
Joined: Tue Jul 28, 2009 2:06 pm

Post by hussra » Fri May 13, 2011 5:56 pm

That blue diesel (now with RC - very handy on a 4 yard railway!) has had a go on the structure:

Image

Image

Image

Image

Ditto Wilberforce:

Image

Image

Image

Image

Image

Quite pleased with how the first section is looking now.

Image

Image
Richard Huss
in sunny Solihull

Narrow Minded

Post by Narrow Minded » Fri May 13, 2011 7:01 pm

Looking very impressive! - and if the rest of the build is to the same high standard, it might take you a while to finish, but trackbed maintenance certainly won't be one of your worries! ;)

User avatar
hussra
Trainee Driver
Trainee Driver
Posts: 872
Joined: Tue Jul 28, 2009 2:06 pm

Post by hussra » Fri May 13, 2011 7:39 pm

Thanks! A supply of Cuprinol Clear has been acquired for the next stage. What was pleasing was that (a) there was not a hint of wobble, and (b) there was no discernable deflection of the bridge. Slow, steady (but sturdy) construction also suits my budget, which is not large.

As I mentioned before, this corner of the garden is the most awkward spot geometrically and I wanted to see if I could get it right before pressing on too far elsewhere. In the opposite direction, the next stage will be a level crossing of an existing block-paved path on a 4' radius, with the path being raised 4 inches or so to match rail level (and also to better retain the soil in the veg patch).
Richard Huss
in sunny Solihull

Narrow Minded

Post by Narrow Minded » Fri May 13, 2011 7:46 pm

with the path being raised 4 inches or so to match rail level (and also to better retain the soil in the veg patch).
Don't forget to always reverse the priority when discussing that with the "Household Authorities" - you're intending to improve the veg patch soil retention, which coincidentally will match your rail level! :lol:

User avatar
hussra
Trainee Driver
Trainee Driver
Posts: 872
Joined: Tue Jul 28, 2009 2:06 pm

Post by hussra » Fri May 20, 2011 2:57 pm

The bridge deck got Cuprinoled on Wednesday. And some more progress today. Various attempts at drawing the trestle bents had resulted in one final drawing:

Image

This was then translated into a template:

Image

and used to construct the first bent:

Image

Just quickly trying it in place (with some minor adjustment - known about in advance - needed to ensure central location under the bridge):

Image

Image

Image

Now working on how to attach the bent to the rest of the bridge. I probably ought to pin the bits together as well - just glued for now.
Richard Huss
in sunny Solihull

User avatar
hussra
Trainee Driver
Trainee Driver
Posts: 872
Joined: Tue Jul 28, 2009 2:06 pm

Post by hussra » Wed May 25, 2011 1:05 pm

Sorted how to attach the bents to the bridge. Perhaps a bit over-engineered, but there was just the right amount of 5/8 x 5/8 x 1/8 angle left over and the smaller stuff I had to hand definitely wasn't up to the job.

Image

Image

Happy with the overall effect so far. (Sorry for the "floating in mid air" effect, just a convenient place to photograph it.)

Image

Image
Richard Huss
in sunny Solihull

Jonnyb
Trainee Fireman
Trainee Fireman
Posts: 143
Joined: Sat Jan 24, 2009 12:50 pm
Location: Surrey

Post by Jonnyb » Wed May 25, 2011 1:34 pm

Some top quaily stuff there :thumbright:

Hancockshire

Post by Hancockshire » Wed May 25, 2011 6:52 pm

Keith&Joanna:52975 wrote:this bridge is for a 5" line?

if not you may have over-engineered it (unless you also have to walk on it)   :shock:
What if a super heavy loco visits? You need to be ready for all occasions

bessytractor
Trainee Driver
Trainee Driver
Posts: 677
Joined: Wed Nov 14, 2007 2:34 pm

Post by bessytractor » Wed May 25, 2011 11:14 pm

I reckon he's got an NG15 on order.........
proudly flying in the face of convention

Pendo Pilot

Post by Pendo Pilot » Wed May 25, 2011 11:35 pm

Looking great Richard, certainly coming on well. It's going to look grand when stained & aged a little with time.

Marquis DeCarabas

Post by Marquis DeCarabas » Thu May 26, 2011 1:46 am

bessytractor:54025 wrote:I reckon he's got an NG15 on order.........
Nah. I'll pop in with me NG16. I want photographs of your concreting after this evening's phone call RAH (I). ;)

User avatar
hussra
Trainee Driver
Trainee Driver
Posts: 872
Joined: Tue Jul 28, 2009 2:06 pm

Post by hussra » Thu May 26, 2011 7:15 am

If I could afford an NG15, the line itself would also be further advanced by now!

I do hope the Marquis's NGG16 will be able to visit at some point. Whether it will fit, goodness only knows, but the curve on the bridge is only around 7ft radius. (Tightens somewhat once on terra firma.)

I am very much hoping - and have tried to plan to make sure - that an RH VoR loco will fit. Would be nice to be able to do something like this:

Image
Crossing the Afon Rheidol (K A) / CC BY-SA 2.0
Richard Huss
in sunny Solihull

User avatar
hussra
Trainee Driver
Trainee Driver
Posts: 872
Joined: Tue Jul 28, 2009 2:06 pm

Post by hussra » Thu Jun 02, 2011 10:13 pm

The four remaining trestle bents have now been made, and were tried out, propped loosely in place, in the remains of this evening's light. I reckon it looks OK.

Ignore the wonky angles - all will be OK once they are actually fixed in position.

Image

Image

Image

The other (south) end bridge support is now in place, too, and awaits some embankment to join up with it in due course.
Richard Huss
in sunny Solihull

LMS-Jools

Post by LMS-Jools » Fri Jun 03, 2011 6:41 pm

Nice :D

User avatar
hussra
Trainee Driver
Trainee Driver
Posts: 872
Joined: Tue Jul 28, 2009 2:06 pm

Post by hussra » Wed Jun 29, 2011 3:06 pm

It's been a bit quiet here, mostly as I've been trying to sort out what happens at church once the Rector retires at the end of next month. But services for the rest of the year are largely sorted now, and the trackbed across the level crossing has been built. The line is now just over six, yes six, yards long. Work to reinstate the garden path is ongoing; the bit on the left in the first photo is done, that to the right still requires raising to match the trackbed, sorry, to retain the veg patch.

Took the opportunity this morning to be relieved of some money by that nice Mr Warrington, in exchange for which I left with some Cain Howley retaining walls. These are needed to hold up the fruit garden. Here the bits are just being tried roughly in place. The mound of earth behind is not going to end up so high as it appears here - this is what got dug out during trackbed construction, piled up awaiting redistribution once the retaining wall is in place.

Image

Image

Image

Image

Image

Image
Richard Huss
in sunny Solihull

User avatar
90733
Driver
Driver
Posts: 1955
Joined: Wed Dec 16, 2009 6:17 pm
Location: West Yorkshire
Contact:

Post by 90733 » Wed Jun 29, 2011 3:59 pm

Looking good, the retaining wall works well :D
Thanks
Jack

Pendo Pilot

Post by Pendo Pilot » Thu Jun 30, 2011 12:45 am

Wow, that does look nice already, love the retaining wall. You were lucky to just leave Steves with the retaining wall, I always end up with tons of stuff.

User avatar
hussra
Trainee Driver
Trainee Driver
Posts: 872
Joined: Tue Jul 28, 2009 2:06 pm

Post by hussra » Thu Jun 30, 2011 7:02 am

Pendo Pilot:55466 wrote:You were lucky to just leave Steves with the retaining wall, I always end up with tons of stuff.
Oh, and a pair of numberplates for the blue diesel!
Richard Huss
in sunny Solihull

Narrow Minded

Post by Narrow Minded » Thu Jun 30, 2011 11:33 am

Nice progress and I must concur, the retaining wall looks great! - especially on the curve, really gives it some "presence".

Progress might not be at breakneck speed, but the line's certainly coming together nicely. ;)

User avatar
hussra
Trainee Driver
Trainee Driver
Posts: 872
Joined: Tue Jul 28, 2009 2:06 pm

Post by hussra » Sun Jul 03, 2011 10:30 pm

Got the path back together, and Beidreirin level crossing mortared in today.

Image

Image

Image

Plus a bit of thinking ahead of how the next part of the line will go.

Image

Image

Image

A little video has been shot but not yet edited - bed time.
Richard Huss
in sunny Solihull

Post Reply

Who is online

Users browsing this forum: No registered users and 41 guests