
The Westwood & Loscoe Light Railway
-
Narrow Minded
-
Pendo Pilot
-
Narrow Minded
No messroom at this end of the line I'm afraidPendo Pilot:49944 wrote:Thats looking tip top now fella. So wheres the messroom? :D
Tower will look so much better when it weathers in as well. Knowing your climate & your special mix, there should be a wall of moss hanging off it in no time. ;)

As for the "weathering" at Loscoe, it's gonna take all the help it can get as this is the sunniest part of the line!
-
Narrow Minded
-
Narrow Minded
Having spent much of the day either out re-laying the approach to Loscoe, or "round tuit" jobs indoors, I had a wander out to the railway later this afternoon.
Luckily I'd taken the camera and caught "Lady Of Sherwood" on the late goods.
The driver receives instructions about the speed restriction at Loscoe while waiting for the off.


Looks like farmer Geddon is in "The Railway" for his tea (again
)

and there's someone waiting at the crossing.

"Right Away Driver"

Lady Of Sherwood negotiates the crossing.

and "The Alley"



I managed to catch up with her again at Codnor Crossing,

but missed her at Loscoe. Looks like the inspectors Maj. D. Saster and Capt. S. Slogg have parked at the station while checking the works.

With Spring in the air and a spring in my heel, it was time for tea!
Luckily I'd taken the camera and caught "Lady Of Sherwood" on the late goods.
The driver receives instructions about the speed restriction at Loscoe while waiting for the off.


Looks like farmer Geddon is in "The Railway" for his tea (again

and there's someone waiting at the crossing.

"Right Away Driver"

Lady Of Sherwood negotiates the crossing.

and "The Alley"



I managed to catch up with her again at Codnor Crossing,

but missed her at Loscoe. Looks like the inspectors Maj. D. Saster and Capt. S. Slogg have parked at the station while checking the works.

With Spring in the air and a spring in my heel, it was time for tea!
-
Pendo Pilot
-
Narrow Minded
-
Narrow Minded
I should have posted these instead of watching England getting stuffed by Ireland
Done the level crossings now Shane, and re-signalled Westwood. (and yes, they're lower quadrant - the head of our S&T Dept happens to be Welsh
)
Codnor Crossing.

Westwood Crossing and Up Starter.

Down Starter.

Managed to have a good "pruning session" and currently fettling to some rolling stock
Done the level crossings now Shane, and re-signalled Westwood. (and yes, they're lower quadrant - the head of our S&T Dept happens to be Welsh
Codnor Crossing.

Westwood Crossing and Up Starter.

Down Starter.

Managed to have a good "pruning session" and currently fettling to some rolling stock
- Dr. Bond of the DVLR
- Retired Director

- Posts: 4533
- Joined: Tue Jun 09, 2009 9:43 pm
- Location: Suffolk
- Contact:
-
Narrow Minded
Very quicklyMr. Bond of the DVLR:50630 wrote:How did you make the signals?>
I was kindly given one at the Lincoln show to "demo" at the AGM and I bought a second one to build in advance to both run through the construction and have 'before' and 'after' models.
Unfortunately there's no table space or slots available to do the demo so I've gone ahead and installed them on the W&L.
Naturally I'll be re-imbursing Keith at the show
-
Narrow Minded
Recycle, recycle, recycle!
I'm just putting together a P.Way rake for the W&L made up entirely from vehicles which had been "withdrawn from regular service"
They either no longer fit in with the theme or "feel" of the developing railway, or weren't up to the same standards as the other pieces of of rolling stock so had been consigned to the bits box.
The Brake / Tool van.

Ballast Wagons.

Railflat.

Toolflat.

Just working on a coach now which has been severely "graverobbed" for parts since it's been in the bits box for a while!
I'm just putting together a P.Way rake for the W&L made up entirely from vehicles which had been "withdrawn from regular service"
They either no longer fit in with the theme or "feel" of the developing railway, or weren't up to the same standards as the other pieces of of rolling stock so had been consigned to the bits box.
The Brake / Tool van.

Ballast Wagons.

Railflat.

Toolflat.

Just working on a coach now which has been severely "graverobbed" for parts since it's been in the bits box for a while!
-
Pendo Pilot
-
Narrow Minded
- 90733
- Driver

- Posts: 1955
- Joined: Wed Dec 16, 2009 6:17 pm
- Location: West Yorkshire
- Contact:
-
Narrow Minded
Cheers guys 
The P.Way Dept stock (minus the workers coach) saw service today when I tackled the problem at the Loscoe approach.
The "loop" was on the platform side of the station and the turnout / curve on the approach was cause for concern. The only solution was to rip it all up and do it again - this has placed the loop on the opposite side of the line, bringing the platform forward but the re-modelling has also included a nice curve to both the loop and the platform!
Waiting for the ballast wagons.....

Lady Of Sherwood complete with temporary steam dome was rostered, also acting as test loco (if an 0-6-0 can get round, the rest of 'em can
) - snapped here from the top of Codnor Castle tower.

and again in Codnor Wood.

And here's the fruits of todays labour - Loscoe (the Final Solution?)




The P.Way Dept stock (minus the workers coach) saw service today when I tackled the problem at the Loscoe approach.
The "loop" was on the platform side of the station and the turnout / curve on the approach was cause for concern. The only solution was to rip it all up and do it again - this has placed the loop on the opposite side of the line, bringing the platform forward but the re-modelling has also included a nice curve to both the loop and the platform!
Waiting for the ballast wagons.....

Lady Of Sherwood complete with temporary steam dome was rostered, also acting as test loco (if an 0-6-0 can get round, the rest of 'em can

and again in Codnor Wood.

And here's the fruits of todays labour - Loscoe (the Final Solution?)




Who is online
Users browsing this forum: No registered users and 11 guests

